







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterQuartz & Granite Countertops in McKinney, TX
Quartz and granite countertops in McKinney typically run $55 to $95 per square foot installed for quartz and $60 to $110 per square foot installed for granite, with most full kitchen replacements landing between $3,200 and $7,800 depending on layout, edge profile, and slab selection. We handle the whole job: template, fabrication, tear-out of the old surface, sink and cooktop cutouts, and the install itself. You get a written price before anything gets cut, and the finished work carries our 365-Day Done Right Promise.
Countertops are the part of a kitchen people touch every day, so mistakes show up fast. A seam in the wrong place, a backsplash that doesn’t sit flush, a sink cutout half an inch off center – all of it is visible for the next twenty years. We template on site with a physical jig rather than relying on cabinet measurements, because McKinney cabinets shift with the seasons. Our technicians have up to 22 years of experience, and they’ll tell you upfront if your existing cabinets can carry a stone slab or need shoring first. Call (844) 834-0609 for a free estimate, or read more about the full scope on our Kitchen Remodeling page.
Key Takeaways
- Quartz installed in McKinney: roughly $55 – $95/sq ft. Granite: roughly $60 – $110/sq ft.
- Most McKinney kitchen countertop replacements land between $3,200 and $7,800.
- Every job gets a written price before work starts and a written guarantee for a full year after.
- We template on site – no guessing from cabinet dimensions.

When You Need Quartz & Granite Countertops
Most homeowners call us when something has gone wrong with the surface they already have, or when a bigger kitchen project has hit the point where the counters are the last piece. Here are the situations we see most in McKinney:
- Laminate is delaminating or scorched. Hot pans on a 1990s laminate top leave burn rings that won’t come out, and edges lift near the sink. Once the substrate underneath gets wet, patching is a losing game – replacing the whole run is usually cheaper than chasing repairs.
- Tile counters with grout lines that trap everything. Older McKinney homes near the historic square often still have 4-inch tile countertops. The grout stains, the edges chip, and no amount of scrubbing fixes the look.
- Cracks or chips in an existing stone top. Granite can crack along a seam if the cabinet below it settled. Sometimes a seam can be re-bonded; sometimes the run needs to be replaced. We’ll tell you which.
- You’re changing the sink or cooktop. A new undermount sink means new cutouts, and a new cutout usually means new stone. Trying to re-cut an existing top rarely works cleanly.
- You want a slab that holds up to a busy household. Quartz is non-porous and doesn’t need sealing, which matters in a kitchen where kids are doing homework and someone’s always spilling something.
- The kitchen is being reconfigured. If you’re moving the sink, adding an island, or changing the cabinet layout, the countertops are part of that plan and need to be templated after cabinets are set.
Our Quartz & Granite Countertops Process
We run the same sequence on every countertop job, and you’ll know what’s happening at each stage before it happens.
- On-site measure and material selection. We walk the kitchen with you, confirm cabinet condition and level, and go over slab options. We work with a documented roster of name-brand surfaces including Cambria and Caesarstone quartz and natural granite slabs, so you’re choosing from materials with manufacturer specs and warranties behind them. You’ll see and feel the difference between a $58/sq ft entry quartz and a $90/sq ft premium slab.
- Written price before any work starts. You get a line-item price covering tear-out, fabrication, edge profile, cutouts, and install. No numbers that move at the door. If a slab needs to be swapped because of a flaw, that conversation happens before we cut, not after.
- Template. Once cabinets are set and level, we template the exact countertop shape on site – including sink cutout, faucet holes, and any cooktop opening. This is the step that determines whether your seams land where they should. We plan seam placement around the sink and away from the primary work zone.
- Fabrication and tear-out. Slabs are cut, edged, and polished to your chosen profile. On install day we pull the old surface, check the substrate (the plywood or cabinet deck the stone sits on) for soft spots or water damage, and correct anything that won’t carry the weight. Stone is heavy – roughly 20 pounds per square foot – so the base has to be sound.
- Install and finish. Countertops set, seams bonded and color-matched, backsplash fitted, sink and faucet set, and the whole surface cleaned and sealed where the material calls for it (granite gets sealed; quartz doesn’t need it). We haul off the old material.
- Walkthrough and written guarantee. We walk the finished kitchen with you, confirm the scope is complete, and hand you the signed 365-Day Done Right Promise. If a seam opens, a chip appears, or the install fails within that year, we come back and correct it at no charge.

Quartz & Granite Countertops Pricing in McKinney
Here’s what countertop work runs in the McKinney market. These are ranges from real jobs, not teaser numbers – the exact figure depends on your linear footage, edge profile, and slab choice. We give you a written price before work starts, so the number you see on the estimate is the number you pay.
| Item | Typical Range (Installed) |
|---|---|
| Entry-level quartz, per sq ft | $55 – $70 |
| Premium quartz (Cambria, Caesarstone), per sq ft | $70 – $95 |
| Granite, per sq ft | $60 – $110 |
| Standard edge profile (eased, bullnose) | Included |
| Upgraded edge (ogee, bevel, chiseled) | $15 – $40 per linear ft |
| Undermount sink cutout and mount | $150 – $300 |
| Tear-out and haul-away of old top | $150 – $400 |
| Full kitchen replacement (typical) | $3,200 – $7,800 |
What moves the number: total square footage, number of seams, whether the cabinets need shoring, whether you’re adding a waterfall edge or an island, and the slab itself. A 30-square-foot galley kitchen in a Stonebridge Ranch home prices very differently from a 70-square-foot kitchen with a double island. We don’t quote over the phone without seeing the layout – but we’ll get you in front of a written estimate fast, and that estimate is free.
If the countertops are one piece of a larger kitchen project, it’s worth reading our Kitchen Remodeling in McKinney page, where we cover cabinetry, layout, and how the trades sequence together.
Quartz or granite – which should you pick?
Quartz is the easier choice for most McKinney households: it’s non-porous, doesn’t need sealing, and holds up to stains, and it comes in consistent patterns so you know exactly what the slab will look like. Granite is the pick if you want natural stone with one-of-a-kind veining and you don’t mind sealing it every year or so. Both are excellent surfaces. Neither is “better” – it comes down to whether you want predictable or unique.
Do you seal granite?
Yes. Granite is porous and needs a penetrating sealer at install, then resealing roughly once a year. Quartz doesn’t need sealing at all. We’ll tell you which material needs what care before you commit to a slab, so there are no surprises about maintenance.
FAQs – Quartz & Granite Countertops
How much do quartz countertops cost in McKinney?
Quartz countertops in McKinney run about $55 to $95 per square foot installed, and most full kitchen replacements land between $3,200 and $7,800. The low end covers entry quartz with a standard edge; the high end covers premium slabs like Cambria or Caesarstone with an upgraded profile and cutouts. Call (844) 834-0609 for an exact quote – estimates are free and you get the number in writing before anything starts.
Can you install countertops the same day?
No – countertop replacement is a two-trip job, not a one-day job. We template first, then fabricate, then install, and the gap between template and install is typically a few days. Rushing the template is how seams end up in the wrong place. We’ll give you the actual schedule up front so you can plan around it. Call (844) 834-0609 to get on the calendar.
How long do quartz and granite countertops last?
Both last decades. Quartz is engineered stone and doesn’t need sealing; granite is natural and needs resealing about once a year. With normal care – no dragging cast iron across the surface, no leaving hot pans directly on stone – either will outlast the kitchen around it. Our install carries a 365-Day Done Right Promise, so if anything fails in that first year, we come back and fix it at no charge.
Can you match my existing countertops or replace just one section?
Sometimes. Matching a natural granite slab years later is difficult because every slab is unique, but quartz patterns are more consistent and a match is often possible. Replacing a single section of counter is doable if the remaining stone is sound and the seam can be hidden well. We’ll look at the existing surface and tell you honestly whether a partial replacement makes sense or whether you’re better off replacing the whole run. Call (844) 834-0609 for a free estimate.
Ready for Countertops That Hold Up
Whether you’re replacing scorched laminate in a 1980s McKinney kitchen or finishing out a full remodel with Cambria quartz, we give you the same treatment: a written price before work starts, technicians who are background-checked and uniformed, and a signed guarantee in your hand at close. That written promise covers the work for a full year – if it fails, we return and correct it at no charge. A live person answers the phone around the clock, so you’ll reach someone who can help, not a voicemail box.
Call (844) 834-0609 for a free estimate on quartz and granite countertops in McKinney. If you want to see the bigger picture first, start with our kitchen remodeling overview for McKinney, or go back to the home page to see the full range of what we do.
Written by the team at Bradford Remodeling Co McKinney, serving McKinney.


