A Bradford company - serving McKinney, TX
A remodeled home with a front porch on a quiet street at golden hour
Rowlett, TX

Remodeling Company in Rowlett - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one accountable point of contact. Permits handled, and the local pro we connect you with is licensed and insured.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A remodeled family room with new windows and a window seat
A remodeled primary suite with built-in wardrobes and a window seat
A remodeled staircase with wood treads and a slim metal railing
A finished basement family room with a media wall and wet bar
A remodeled laundry and mudroom with a bench, cubbies and painted cabinets
A garage converted into a guest room and home office
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Remodeling Company in Rowlett, TX

Home remodeling in Rowlett is shaped by two things most suburbs don’t have to deal with: a lakeside core full of 1980s houses sitting on clay that moves, and a north side that’s now old enough to need its first real remodel after twenty or thirty years of builder-grade finishes wearing out. We plan every Rowlett job around that reality, which means we look at the slab and the brick veneer before we talk finishes, and we put a written, itemized price in your hands before any work starts. Call (844) 834-0609 for a free estimate.

Call (844) 834-0609

Why Rowlett Homes Are Different

Rowlett was mostly built out between the 1980s and the 2000s, and the eastern shore of Lake Ray Hubbard gave it a lakefront identity that shaped where the older, smaller houses sit – close to downtown Rowlett and the water – while the newer two-story brick-veneer tract homes dominate the north side.

The ground under the older lakeside blocks in 75088 is expansive Blackland Prairie clay. It swells when it’s wet and shrinks hard when it’s dry, and North Texas hands out both extremes in the same year. That cycle shows up in the brick as stairstep cracks running up the veneer and in door frames that have quietly gone out of square. It’s not a construction defect; it’s the slab moving.

Hail is the other constant. Spring storms routinely total roofs and siding, so storm restoration and foundation work run year-round alongside the kitchen and bathroom remodels. And because Rowlett has been actively redeveloping its downtown and waterfront, permitting along the lake and the Corps of Engineers shoreline carries rules that don’t apply a mile inland.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Main Rowlett Services

Most Rowlett homeowners who call us are weighing one of two projects: a general contracting job that fixes or extends the house, or a kitchen remodel that retires twenty-year-old cabinets and laminate.

General Contractor in Rowlett

A general contractor job here usually starts with a decision about the structure underneath. On older homes near the lake in 75088, we check slab movement and brick cracks before we commit to a room addition or a load-bearing wall change, because moving forward on a shifting slab only multiplies the repair later. North-side homes from the 1990s and 2000s tend to need less foundation work and more scope coordination – additions, garage conversions, roof replacements after hail. We sequence the trades, pull the permits the city requires, and hold the schedule in writing. For the full scope of what we coordinate, see General Contractor in Rowlett.

General Contractor in Rowlett

Kitchen Remodeling in Rowlett

Kitchens in Rowlett’s 1980s and 1990s subdivisions are reaching the end of their first life at the same time: oak cabinets with worn faces, dropped soffits, laminate counters, and a layout that closes off the cook from the room. Our work usually starts with cabinet layout and lighting before anything gets ordered. We build to a documented material list – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures – so the specification is traceable and you’re not guessing what’s going in your kitchen. Plenty of these kitchens also hide a slab crack under the tile, which we flag before demolition. Details are on Kitchen Remodeling in Rowlett.

Kitchen Remodeling in Rowlett

Bathroom Remodeling in Rowlett

Bathrooms are the smallest jobs with the most that can go wrong, and in Rowlett the two culprits are water and movement. A 1990s tub surround that’s started to flex, a shower pan that’s leaking into the subfloor, or a vanity that’s pulled away from a wall that’s no longer plumb – all of these show up on a regular basis. We open the wall, confirm what’s behind it, and rebuild the substrate properly rather than tiling over a problem. Fixtures come from the Kohler and Moen lines, and the waterproofing gets checked before tile goes up. The full breakdown is on Bathroom Remodeling in Rowlett.

Bathroom Remodeling in Rowlett
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 834-0609

Home Remodeling in Rowlett

A remodeled living room with built-in shelves around the fireplace

Home remodeling in Rowlett splits cleanly along the housing stock. On the older lakeside blocks near downtown and the water, the first question isn’t tile or cabinets – it’s whether the slab has moved, and whether the remedy gets folded into the project. On the north side, where 1990s and 2000s two-story homes dominate, the work is more about retiring builder-grade finishes and reworking layouts that no longer fit how people live. We approach Home Remodeling the same way either way: written scope, written price, and one standard held across every job.

Whole House Remodel

Signs you need it

You’re looking at a house where the kitchen, both bathrooms, flooring, and trim are all at the end of their useful life at once, and piecemeal updates would cost more in the long run than one coordinated project.

What it costs in Rowlett

A whole-house remodel in Rowlett typically lands in the $45,000 – $130,000 range for the structural and finish scope we’d quote as a single project, with the final number set by square footage and how much layout changes.

How we do it

We survey the slab and brick veneer first, document every existing condition, then sequence demolition, rough-in, substrate, and finishes room by room so the house stays livable as long as possible.

Home Renovation

Signs you need it

The layout works but the surfaces don’t – dated cabinets, worn flooring, hollow-core doors, and fixtures that were builder-standard when the house went up in the 1990s or 2000s.

What it costs in Rowlett

Targeted renovation work usually runs from the $9,000 – $20,000 band for a single room up through the $14,000 – $45,000 kitchen range when the scope grows, priced line by line before work starts.

How we do it

We scope by room, lock the material list to documented brands, and run the trades in a written order so nothing gets torn out before its replacement is on site.

What Home Remodeling Costs in Rowlett

Item Typical range in Rowlett
Home Addition $45,000 – $130,000
Garage Conversion $30,000 – $80,000
ADU Construction $90,000 – $220,000

Does a Rowlett remodel need a permit, and who pulls it?

Yes – the City of Rowlett requires permits for structural, electrical, plumbing, and mechanical work, plus separate review for anything near the lake or in the floodplain. We pull the permits, schedule the inspections, and hand you the passed inspection record at close.

Can you remodel a Rowlett house that has foundation movement?

Often, yes – but the foundation gets addressed first. On older lakeside blocks in 75088 we document slab movement and brick cracks before demolition, because finishing a room over a slab that’s still moving wastes the work. Call (844) 834-0609 for a free estimate.

Brands We Service in Rowlett

We work from a documented roster of name-brand materials – GAF and James Hardie on exteriors, Therma-Tru doors, Boral trim, PGT and CGI windows – because manufacturer specifications and warranties back the work we do. No stocked parts on a truck; materials are ordered to your written scope. See our brands for the full list.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Remodeling Company in Rowlett, TX

Service Typical range in Rowlett
Kitchen Remodel $14,000 – $45,000
Small Kitchen Remodel $9,000 – $20,000
Bathroom Remodel $9,000 – $28,000
Walk-In Shower Installation $4,500 – $12,000
Home Addition $45,000 – $130,000
Garage Conversion $30,000 – $80,000
ADU Construction $90,000 – $220,000
Roof Replacement $8,000 – $20,000
Window Replacement $4,500 – $15,000
Paver Patio Installation $3,500 – $11,000

What pushes price up in Rowlett is what’s under the surface: slab stabilization on the older clay-soil stock, floodplain and shoreline permitting near the lake, and any layout change that touches structure. Every project gets a written, itemized price before work begins, and that number doesn’t move at the door.

Neighborhoods We Serve in Rowlett

We work across Rowlett’s 75088, 75030, and 75089 ZIP codes, from the older lakeside blocks near downtown Rowlett out to the newer subdivisions on the north side. The clay-soil conditions and permitting realities differ block to block, and we scope each job against what’s actually under that specific house. Wherever you are in Rowlett, we return calls the same way – a live person on the phone, not a queue.

  • Downtown Rowlett and the lakeside core (75088)
  • Waterview and the Lake Ray Hubbard shoreline
  • North Rowlett subdivisions off Liberty Grove
  • Dalrock Road corridor neighborhoods
  • Southeast Rowlett near the PGBT

Service Area – Cities Near Rowlett

Rowlett sits at the meeting point of Dallas, Rockwall, and Collin counties, and we work the surrounding cities on the same written-scope basis. If you’re just outside Rowlett in Sachse, TX, Garland, TX, Wylie, TX, or Rockwall, TX, the clay-soil and hail considerations are largely the same, and the estimate process is identical.

Serving Rowlett, TX – Our Local Coverage Area

We serve Rowlett and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Remodeling Company in Rowlett

Ready to get started? Free estimates in Rowlett
Call (844) 834-0609

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local construction pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Rowlett Customers Say

★★★★★ 5.0 from 4+ reviews

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

How It Works in Rowlett

Getting your construction project started is simple.

1

Call or Request a Free Estimate

Tell us about your construction project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A remodeled hall bathroom with subway tile and a floating vanityA small remodeled galley kitchen with cabinets to the ceilingA low-threshold walk-in shower with a bench and grab barA walk-in pantry with wood shelvingA powder room with botanical wallpaper and a stone sinkA remodeled kitchen with a waterfall island and wood cabinets

More remodeling services in Rowlett

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Rowlett. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch