A Bradford company - serving McKinney, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Kitchen Remodel Cost in McKinney - Fixed Price, Set Finish Date

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Permits handled, and the local pro we connect you with is licensed and insured.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
An open kitchen and dining area after a remodel
A galley kitchen opened up to the dining room with a new peninsula
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A small remodeled galley kitchen with cabinets to the ceiling
A wood double vanity with two mirrors after a bathroom remodel
An open living space after a whole-home remodel
A finished backyard cottage with a small covered porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Kitchen Remodel Cost in McKinney, TX: Real Numbers Before the First Cabinet Comes Out

A kitchen remodel in McKinney typically runs $14,000 to $45,000, with the spread coming down to one question: does the plumbing move? A cosmetic swap of surfaces, cabinet faces and fixtures sits near the low end; a full gut with a plumbing reroute pushes toward the top. Most “affordable” quotes in this town leave out a line item that stops work cold – post-tension slab cable location – and that omission is where surprise invoices start. Call Bradford Remodeling Co McKinney at (844) 834-0609 for a written price before anything is ordered.

Installers leveling a new base cabinet during a kitchen remodel

The Stonebridge Ranch Story Every McKinney Kitchen Quote Should Learn From

A homeowner in Stonebridge Ranch got a kitchen quote that never mentioned the slab. The plan called for moving the sink six feet. On day three the installer hit a tension cable, and the plumbing had to be rerouted around it. What was sold as an affordable job had tripled by the time the drywall went back up.

That’s not a rare accident in McKinney. The master-planned subdivisions here – Stonebridge Ranch, Craig Ranch, Adriatica – were built on post-tension slabs through the 1990s and 2000s. A post-tension slab gets its strength from steel cables under tension, poured inside the concrete. You cannot core or cut one without an engineer locating the cables first. Skip that step and the drill finds a cable, or worse, a cable lets go under load. The whole job stops while an engineer, a structural report and a repair plan get sorted out.

Cable location is a mandatory line item on any McKinney kitchen with plumbing relocation. It belongs in the written scope before cabinets are ordered, not after the saw hits concrete. Expect it to add a few hundred dollars to engineering and scanning on a typical kitchen. That’s the cheapest insurance in the whole project.

What Drives Kitchen Remodel Cost in McKinney? Two Tiers, One Big Gap

Most McKinney kitchens fall into one of two cost tiers, and the gap between them – roughly $15,000 to $30,000 – is mostly slab access risk.

  • Cosmetic swap ($14,000-$22,000 in most cases): new countertops, refaced or swapped cabinet boxes, fixtures, backsplash, paint. Plumbing stays put. No coring, no cable location, no slab risk.
  • Full gut with plumbing reroute ($30,000-$45,000 and up): walls open, cooktop or sink moved, new rough-in, cable location first, then cabinets and surfaces. This is where the surprises live if the scope wasn’t written tightly.

Here are the line-item ranges we hold to across McKinney. These are market-calibrated, not “call for a quote” placeholders – they’re the numbers we put on paper before work starts.

Line item McKinney price range
Full kitchen remodel $14,000-$45,000
Small kitchen remodel $9,000-$20,000
Cabinet installation $4,000-$13,000
Countertop installation $2,000-$6,500
Backsplash installation $800-$2,500
Kitchen island installation $3,000-$10,000

Those ranges assume a straight scope. When plumbing moves on a post-tension slab, add cable location and any reroute labor on top. Ask for both numbers in writing before you sign. For a deeper walk through our process, see Kitchen Remodeling.

A built-in window seat in a bay window

Why the Cabinets and Surfaces You Spec Matter More in McKinney

North Texas humidity swings hard – wet springs, dry summers, and an expansive Blackland Prairie clay under all of it. That swings the humidity inside a house too, and cheap builder-grade cabinet boxes don’t like it. Particleboard sides swell at the seams and the doors stop hanging true within a couple of seasons.

That’s why Bradford specs KraftMaid and Wellborn cabinetry by name rather than leaving a “builder-grade allowance” in the quote. Both run solid plywood box construction on the lines we install, which holds its shape through a McKinney summer-to-spring cycle. The named brand also means the manufacturer’s warranty travels with the cabinet – and it gives you a traceable spec, not a mystery number a subcontractor fills in later.

Same logic on surfaces. Cambria and Caesarstone are our named quartz specs, with Sterling and Grohe in the sink-and-fixture package. A named surface is a cost anchor: you know the number before the material is ordered, not after the slab shows up and the upcharge appears. A brand on the plan is a price that doesn’t move.

What “No Numbers That Move at the Door” Actually Means

Bradford Remodeling Co McKinney puts a written price in your hands before a single tool comes out. That price is held even when material lead times shift – and in this market they do. If a KraftMaid cabinet run slips two weeks because a door style is backordered, the delay is our problem to manage, not a line item that reappears on your invoice.

Three things sit behind that written price:

  • The Garrison Standard: the framework every Bradford location operates under, put in writing. Every scope, every price, every guarantee, on paper before work starts.
  • The 365-Day Done Right Promise: every completed project carries a full-year written guarantee. If the work fails inside that window – a cabinet door that sags, a countertop seam that opens, a fixture that leaks – Bradford returns and corrects it at no charge.
  • Background-checked, uniformed technicians: you know who’s walking through the door before the crew shows up. Identity and conduct standards are set at the Garrison Partners level, not left to individual job sites.

Our technicians have up to 22 years of experience, and a live person answers the phone 24/7 – not a voicemail, not a callback queue. When a kitchen job is mid-gut, that matters.

Common Local Scenarios We Price in McKinney

Every McKinney kitchen has its own wrinkle. A few we see regularly:

  • A 2003 Stonebridge Ranch kitchen with the original oak cabinets: cosmetic tier, reface plus new Cambria tops, no slab work. Usually lands $16,000-$24,000.
  • A Craig Ranch kitchen where the homeowner wants the cooktop moved to the island: plumbing and gas reroute on a post-tension slab, cable location first. Full-tier pricing, $32,000-$45,000.
  • A restored early-1900s home near the downtown square: historic-sensitive scope with different framing, often a pier-and-beam subfloor rather than a slab. Gets priced on its own terms, and exterior changes near the square go through historic design review – interior kitchen work usually doesn’t, but it’s worth confirming before the plan is final.

If your home sits on the swelling Blackland clay, foundation movement shows up in a kitchen too – sticking cabinet doors, cracks at the counter-to-wall joint. We flag it before we order materials. A cosmetic fix on a moving slab won’t hold.

FAQs

Get Your McKinney Kitchen Priced in Writing

No surprise invoices, no numbers that move at the door. Bradford Remodeling Co McKinney puts a written price and a full-year guarantee in your hand before the first cabinet is ordered. If the work fails inside that year, we come back and correct it at no charge. Call (844) 834-0609 for a free estimate on your McKinney kitchen.

Written by the team at Bradford Remodeling Co McKinney, serving McKinney, TX.

What Our Customers Say

★★★★★ 5.0 from 4+ reviews

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A powder room with botanical wallpaper and a stone sinkA remodeled laundry and mudroom with a bench, cubbies and painted cabinetsA home office with a built-in desk and shelvesA remodeled primary bathroom with a soaking tub and walk-in showerA remodeled living room with built-in shelves around the fireplaceA single-story rear room addition with tall windows and a new patio

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in McKinney? Licensed & insured · free written estimates
Call (844) 834-0609

Request a Free Estimate

Tell us what's going on in McKinney. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch