A Bradford company - serving McKinney, TX
A new rear addition with a vaulted beamed ceiling and tall windows

Cost to Hire a General Contractor in McKinney - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one accountable point of contact. Permits handled, and the local pro we connect you with is licensed and insured.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled primary suite with built-in wardrobes and a window seat
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled staircase with wood treads and a slim metal railing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What It Costs to Hire a General Contractor in McKinney, TX

Hiring a general contractor in McKinney typically runs $14,000-$45,000 for a full kitchen remodel, $45,000-$130,000 for a home addition, and $9,000-$28,000 for a bathroom. Those are the construction numbers. What most quotes leave out is the cost of a scope that ignores the ground under the house. Call Bradford Remodeling Co McKinney at (844) 834-0609 for a written price before any work starts.

Most McKinney homeowners get a GC quote that looks complete, then a wet spring proves it wasn’t. The slab shifts, the new tile cracks, and the drainage correction nobody priced becomes the change order that eats the budget. In a town built on Blackland Prairie clay, a contractor’s markup matters far less than whether the written scope is right.

A wide opening with a new beam where the kitchen wall was removed

Why the Ground Under a McKinney House Changes the Price

McKinney sits on expansive clay that swells when it’s wet and shrinks hard through a dry Texas summer. Around Stonebridge Ranch and Craig Ranch, the master-planned subdivisions built from the 1990s into the 2010s rest on post-tension slabs, and those slabs move with the soil. After a dry stretch you’ll see doors that stick and hairline cracks open across a garage floor. That movement is the local tell, and it’s the reason a remodel touching floors, doors, or tile in one of those homes needs a drainage and soaker-hose assessment priced into the job from day one.

Skip that line item and the GC is marking up a scope that was flawed before the first tool came out. The finish work can fail inside a year, and the warranty argument starts. Downtown McKinney, where the 1800s courthouse square sits inside a strict historic preservation district, adds a second variable: exterior work there goes through design review, which affects schedule and cost on its own.

What that means in dollars: a scope with drainage correction built in costs more upfront, but it removes the change-order surprise tied to soil conditions the contractor already knew about. A written price with the assessment included is the difference between a fixed number and a number that moves at the door.

Three Ways Contractors Price a Job – and Which One Protects You

Ask how the number is built, not just what it is. General contractors in McKinney generally use one of three cost structures, and they behave very differently when soil movement forces a scope change in month two.

  • Flat fee. One number for the whole project. Simple, but when a scope gap appears, the contractor has to protect the fee, and the conversation about who pays gets harder.
  • Cost-plus percentage. Materials and labor plus a set markup. Transparent on paper, but every surprise adds to the bill, so a foundation or drainage discovery inflates the total with the markup on top.
  • Fixed-price written contract. A defined scope and a defined price, signed before work starts. When the scope is priced correctly, including the clay-related line items, this is the structure that keeps a McKinney homeowner from paying for someone else’s miss.

Bradford Remodeling works on the fixed-price written contract, and The Garrison Standard makes that non-negotiable: a written price before any work begins, every time, no numbers that move at the door. You know your number before the crew arrives, and you know exactly who is walking through the door, because technicians are background-checked and uniformed on every job.

Footing forms with tied rebar for a home addition

What a General Contractor Costs in McKinney, by Project

These ranges reflect McKinney market pricing for common scopes. Slab-adjacent work – floors, structural changes, anything that ties into a post-tension foundation – runs 15-25% higher to warranty correctly, because the drainage and soil assessment is part of doing the job right rather than a line added later.

Project Typical Range
Kitchen remodel $14,000-$45,000
Small kitchen remodel $9,000-$20,000
Bathroom remodel $9,000-$28,000
Walk-in shower installation $4,500-$12,000
Home addition $45,000-$130,000
ADU construction $90,000-$220,000
Garage conversion $30,000-$80,000

Cosmetic refreshes – cabinets, counters, a Kohler or Moen fixture swap – sit at the low end of those ranges and rarely touch the slab. Structural and slab-adjacent scopes sit at the high end and need the assessment line built in. For a closer look at specific build types, see our pages on home remodeling and additions.

What the 365-Day Done Right Promise Actually Covers

Most contractors give you a one-year verbal workmanship warranty. Ask what happens when a deferred failure shows up – clay movement that cracks a tile floor eight months after a remodel – and the conversation usually gets vague. Bradford’s 365-Day Done Right Promise is written, on every project, for a full year. If the work fails inside that window, we come back and correct it at no charge.

The difference matters most in a city where the ground keeps moving. Verbal coverage depends on someone remembering the conversation and agreeing it was their fault. Written coverage means the homeowner is holding the terms at job close, alongside a documented scope and a signed guarantee, on a clean site. That is what squared away looks like. Material specs are traceable too – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, GAF and James Hardie exterior products, Therma-Tru doors – so when something does need correcting, the manufacturer specs and warranties are already on record.

FAQs About Hiring a General Contractor in McKinney

Get a Written Price Before Any Work Starts

In McKinney, the right GC is the one whose written scope accounts for the clay under your house. Bradford Remodeling works to the fixed-price written contract, a documented material roster, and the 365-Day Done Right Promise. Call (844) 834-0609 for a free estimate and a written price, before a single tool comes out.

Written by the team at Bradford Remodeling Co McKinney, serving McKinney, TX.

What Our Customers Say

★★★★★ 5.0 from 4+ reviews

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
An open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA whole-home remodel with the living, dining and kitchen areas opened upA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA remodeled family room with new windows and a window seat

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in McKinney? Licensed & insured · free written estimates
Call (844) 834-0609

Request a Free Estimate

Tell us what's going on in McKinney. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch