A Bradford company - serving McKinney, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Cost to Reface Kitchen Cabinets in McKinney - Fixed Price, Set Finish Date

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Permits handled, and the local pro we connect you with is licensed and insured.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A small remodeled galley kitchen with cabinets to the ceiling
A walk-in pantry with wood shelving
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A galley kitchen opened up to the dining room with a new peninsula
A whole-home remodel with the living, dining and kitchen areas opened up
A second-story addition that matches the existing roofline
A walk-in shower with large-format tile and a built-in niche
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Cabinet Refacing Costs in McKinney, TX – And When It’s the Wrong Move

Cabinet refacing in McKinney typically runs $4,500 to $9,000 for an average kitchen, using Wellborn or KraftMaid door and drawer fronts over a verified-sound box. Full cabinet replacement on the same footprint runs $14,000 to $22,000. The gap is real, and it holds only if your existing cabinet boxes pass inspection. That inspection is the part most price guides skip. Call (844) 834-0609 and we’ll tell you straight whether refacing is the right call for your kitchen.

A refacing job on a sound box is a smart buy. A refacing job on a swollen particleboard box in a 25-year-old Stonebridge Ranch home is money you’ll spend twice.

Installers leveling a new base cabinet during a kitchen remodel

Why the Box Matters More Than the Door in McKinney

Most of McKinney’s master-planned subdivisions were built between 1992 and 2010, and the cabinetry from that era is overwhelmingly particleboard box construction with a melamine or vinyl wrap. These homes sit on post-tension slabs. That combination creates two failure patterns we see constantly.

  • Vapor transmission through the slab. North Texas’ expansive Blackland Prairie clay moves with every wet-dry cycle, and post-tension slabs are designed to flex with it. Moisture migrating up through the slab reaches the cabinet floor and toe-kick first, where particleboard swells and delaminates. A home in Craig Ranch or Adriatica built in 2004 may look fine from the door side and be soft at the base.
  • Under-sink leaks that went unnoticed for years. A slow drip behind a supply line or a failed disposal flange soaks the cabinet floor over months. The damage spreads under the veneer and into the drawer rails before anyone notices.

Refacing over a compromised box conceals the failure rather than correcting it. The new veneer adhesive needs a stable substrate to bond to. Over swollen particleboard, the bond fails, edges lift, and the job comes apart within a couple of years. That’s why the honest first step in any McKinney kitchen is a box-integrity assessment, not a door-and-veneer quote.

What a Legitimate Box-Integrity Check Covers

When we walk a McKinney kitchen for a refacing estimate, we check three things before we quote a number. These are the signs that tell us whether the substrate will hold new veneer.

  • Delamination at the cabinet floor. We probe the bottom panel and the joints where it meets the sides. Soft spots, lifting edges, or a floor that flexes under hand pressure mean the box is compromised.
  • Toe-kick moisture staining. Dark staining, bubbling wrap, or a musty smell at the base of the cabinets points to slab vapor or a long-running leak. We check this on every run, not just under the sink.
  • Drawer-slide rail corrosion. Rusty or pitted slides tell us moisture has been present long enough to attack metal. A box that’s been wet that long usually won’t hold adhesive.

Our written scope document states explicitly whether each cabinet run passed or failed inspection, before any refacing price is confirmed. That’s The Garrison Standard in practice: the number on the page matches the condition of your kitchen, not a ballpark we revise at the door.

A remodeled hall bathroom with subway tile and a floating vanity

Refacing Cost Breakdown for a McKinney Kitchen

Here’s what the line items look like. These ranges hold for the average McKinney kitchen, roughly 20 to 30 linear feet of cabinetry, assuming a sound box.

Item Typical Range
Refacing, sound box, Wellborn/KraftMaid fronts $4,500 – $9,000
Cabinet installation (full replacement, same footprint) $4,000 – $13,000
Countertop installation $2,000 – $6,500
Backsplash installation $800 – $2,500
Kitchen island installation $3,000 – $10,000
Full kitchen remodel (refacing plus counter, splash, island) $14,000 – $45,000

These numbers are market-calibrated for McKinney. If you’re weighing refacing against a larger scope, our Kitchen Remodeling page lays out how the phases fit together, and the Kitchen Remodeling in McKinney page covers the local build conditions in more detail.

When Partial Replacement Beats Whole-Kitchen Replacement

If two or more cabinet runs fail inspection, the math shifts. Replacing only the failed sections and refacing the sound ones is often cheaper than tearing out the whole kitchen, and it should be priced as a separate line item so you can see exactly what you’re paying for.

Say your sink run and one base run under the cooktop are swollen, but the wall cabinets and the island are dry and solid. We’d scope replacement of the two failed runs and refacing of everything else. That mix usually lands well below full replacement, and you keep the doors you like on the runs that are sound. We won’t quote a mixed scope as one lump number; you’ll see the refacing line and the replacement line separately in the written price.

How We Work in McKinney Kitchens

Bradford Remodeling Co McKinney works with a documented roster of premium materials: KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures. Every brand carries manufacturer specifications and warranties that back our own guarantee, which means the specification is traceable. You’re not guessing what’s behind the door.

Our technicians have up to 22 years of experience, and they’re background-checked and uniformed on every job, so you know who’s walking through your door before the crew arrives. Every project gets a written price before work starts. Every completed project carries the 365-Day Done Right Promise: if the work fails within the guarantee period, we come back and correct it at no charge. At close, you get a clean site, a documented scope, and a signed written guarantee in your hand.

A live person answers the phone 24/7, not a voicemail or a callback queue. Bradford Remodeling is part of the Garrison Partners family, established in 2004 and held to The Garrison Standard, and each location is independently owned and operated.

FAQs

Get a Written Price Before You Commit

Whether refacing makes sense for your McKinney kitchen comes down to the condition of the boxes under the doors. We’ll inspect, document what passed and what didn’t, and give you a written price with the scope spelled out. Call (844) 834-0609 for a free estimate. Live person, 24/7.

Written by the team at Bradford Remodeling Co McKinney, serving McKinney, TX.

What Our Customers Say

★★★★★ 5.0 from 4+ reviews

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A wide opening with a new beam where the kitchen wall was removedA garage converted into a guest room and home officeA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled staircase with wood treads and a slim metal railingA low-threshold walk-in shower with a bench and grab barA finished basement family room with a media wall and wet bar

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in McKinney? Licensed & insured · free written estimates
Call (844) 834-0609

Request a Free Estimate

Tell us what's going on in McKinney. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch