







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Why McKinney Homeowners Choose Toto Construction
Toto construction service in McKinney means we repair, install and remodel around Toto fixtures as an independent provider, not a factory-authorized one. We handle the whole lineup: two-piece Drake toilets, one-piece Ultramax, Washlet and Neorest bidet seats, Aquia and EcoPromenade high-efficiency models. That matters in a bathroom remodel, because the toilet is usually the first thing a crew pulls and the last thing anyone thinks about until the flange is open and the subfloor is wet. We give you a written price before work starts, back every project with the 365-Day Done Right Promise, and answer the phone with a live person at (844) 834-0609. We are not affiliated with, authorized by or endorsed by Toto.

Why Trust Bradford Remodeling Co McKinney for Your Toto Construction?

Our technicians have up to 22 years of experience, and Toto work is routine for them. They know a G-Max flush tower from a Tornado tower by the sound it makes when it fails, and they can tell a bad fill valve from a scaled-up supply without pulling the tank twice. We use genuine Toto fill valves, flush towers and Washlet components where the model calls for them, and a quality aftermarket wax ring, supply line or seat where OEM adds cost without adding function.
Parts are sourced per job against your exact model number, not guessed at from a photo. That is what keeps the work warranty-safe. Every price is written before a tool comes out, so you are not guessing what the repair or the broader remodel will cost. We work from a documented roster of name-brand materials (KraftMaid, Wellborn, Cambria, Caesarstone, Kohler, Moen), and we operate under The Garrison Standard. Every completed project carries the 365-Day Done Right Promise: if the work fails inside that window, we come back and correct it at no charge. As an independent provider, we are also free to recommend whichever Toto trim or part actually solves the problem rather than a single factory path.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Common Toto Construction Problems We Fix in McKinney
- Phantom running and weak flush on Drake and Drake II toilets (CST743 and MS-series). After years of McKinney’s hard water, the G-Max or Tornado flush tower wears and the fill valve scales up, so the toilet keeps refilling itself overnight. A faint chlorine smell in the tank is often the tell. Correct-fit tower and valve replacement solves most of these.
- Washlet and Neorest seat electronics failing. Dead seat heat, a weak or intermittent bidet spray, and control-panel faults are common in a humid bathroom where moisture reaches the board. Diagnosis comes before replacement, because a dead seat heater is sometimes a connection and sometimes a board.
- Wax ring and closet flange leaks. On one-piece Ultramax and Ultramax II units, a slow seal leak at the flange rots the subfloor and stays hidden until a remodel opens the floor. This is the leak nobody catches until the tile is up.
- CeFiONtect glaze pitting and mineral staining. Toto’s glaze resists waste well, but hard water leaves pitting and scale that no amount of scrubbing clears. Once the glaze is spent, rebuilding stops making sense.
- Tank-to-bowl gasket leaks on older two-piece Drake models. The gasket between tank and bowl hardens and seeps, leaving water on the floor and a slow loss of flush power. It is a small part with an outsized effect, and worth catching before it damages flooring.
Toto Parts & Our Repair-vs-Replace Approach

For Toto, we separate parts into two groups. Fill valves, flush towers, and Washlet or Neorest components are sourced as genuine Toto parts matched to your model, because the fit and the electronics have to be right. Wax rings, supply lines and seat hardware can go aftermarket when quality is equal and OEM just adds cost. We do not claim to stock Toto parts locally; parts are ordered against your model number for each job.
Repair versus replace is decided honestly. A two-piece Drake with a bad valve is a repair. A one-piece Ultramax with a spent bowl and a failing integrated assembly inside a larger bath update is usually a replacement. A smart seat whose electronics board runs past the price of a new unit gets replaced, not rebuilt. Every range is written before work starts, and the 365-Day Done Right Promise covers what we finish. Call (844) 834-0609 and we’ll talk through which way your fixture should go.
Our Toto Service Process – Step by Step
- 1
Diagnosis. We confirm the exact model (Drake, Ultramax, Aquia, EcoPromenade, Washlet or Neorest), then test the flush, the fill, the seal and, on smart seats, the electronics. We check the closet flange and subfloor while we are in there.
- 2
Repair or install. Genuine Toto parts for the valve, tower and seat components, matched to the model, installed to spec. On a remodel, the Toto fixture is planned in with the vanity and shower rough-in rather than added at the end.
- 3
Test. Flush cycle, fill level, seal check under the bowl, seat functions on a Washlet or Neorest, and a floor check for seepage before we close up.
- 4
Written guarantee. You get the documented scope and the 365-Day Done Right Promise in your hand at close, along with a clean site. If the work fails inside the year, we return at no charge.
See the difference
Before
After
Before
After
Before
AfterToto Products We Service & Install in McKinney
We work on and install the Toto Drake and Drake II two-piece toilets, Ultramax and Ultramax II one-piece units, the Aquia and EcoPromenade high-efficiency models, and the Washlet and Neorest bidet seats and integrated smart toilets. That covers flush-tower and fill-valve service, wax ring and flange work, CeFiONtect glaze assessment, and seat electronics diagnosis. If you are remodeling a McKinney bathroom and want the Toto you already own brought forward or replaced with a newer model, we handle that alongside the vanity and shower work. Call (844) 834-0609 to price it.
We Also Service These Brands
Toto is one part of what we handle. Bradford Remodeling Co McKinney also works with KraftMaid cabinetry, Kohler fixtures, and Cambria and Silestone surfaces, so a bathroom remodel here is not dependent on a single brand. That breadth is what lets us match the right fixture to the room instead of forcing one product line across the job. One call covers the toilet, the vanity and the shower surface.
FAQs – Toto Construction Service in McKinney

No. We are an independent Toto service provider and are not affiliated with, authorized by or endorsed by Toto. We work on and install Toto fixtures as an independent contractor, which means we are free to recommend the part or trim that actually solves your problem. Call (844) 834-0609 to schedule a free estimate.
Yes, for the parts where fit and function matter most: genuine Toto fill valves, flush towers, and Washlet and Neorest components matched to your model. We use quality aftermarket parts for wax rings, supply lines and seat hardware where OEM adds cost without benefit. Parts are ordered per job against your model number, not pulled from a shelf. Call (844) 834-0609 for an exact quote.
A valve or flush-tower repair is typically a single visit; a Washlet or Neorest electronics diagnosis can take longer because the board has to be tested before a call is made; and a Toto install inside a bathroom remodel is scheduled with the rest of the job. We give you the written scope and timeline before work starts. Call (844) 834-0609 to schedule your free estimate.
We cover the Drake and Drake II two-piece toilets (CST743 and MS-series), Ultramax and Ultramax II one-piece units, Aquia and EcoPromenade high-efficiency toilets, and the Washlet and Neorest bidet seats and integrated smart toilets. If you have a model we have not listed, call (844) 834-0609 and we will confirm.
No, independent service by a qualified contractor does not void your Toto warranty, and using genuine Toto parts where the model calls for them keeps the work warranty-safe. We document the parts and the scope so you have a record if a manufacturer claim ever comes up. Call (844) 834-0609 for a free estimate.
It depends on the scope. A valve or flush-tower repair is at the low end; a Toto fixture brought into a full bathroom remodel is priced within the ranges below. Every price is written before work starts, and the 365-Day Done Right Promise covers what we finish.
| Service | Price Range (McKinney) |
|---|---|
| Full Bathroom Remodeling | $9,000 – $28,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Bathroom Vanity Installation | $800 – $3,000 |
Call (844) 834-0609 for an exact quote on your Toto job; estimates are free.
Book Your Toto Service in McKinney, TX
Whether your Toto Drake is running, your Washlet seat has gone cold, or you are planning a McKinney bathroom remodel and want your Toto handled right, we give you a written price before any work starts and stand behind it with the 365-Day Done Right Promise. A live person answers the phone. Call (844) 834-0609 for a free estimate.
Written by the team at Bradford Remodeling Co McKinney.












