







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Construction Specials in McKinney, TX
We run a small set of standing offers because homeowners in McKinney ask for the same three things before they commit to a remodel: a real number, a written scope, and a guarantee that holds. Call (844) 834-0609 and a live person answers, day or night, to talk through which offer fits your project. Nothing here is a gimmick. Every special below ties back to how Bradford Remodeling Co McKinney already works: written pricing before work starts, documented brand materials, and the 365-Day Done Right Promise.
Current Offers

Free Written Estimate With Line-Item Pricing
Every Bradford project begins with a written price before any work starts, and this offer makes that visit free of charge. You’ll get a line-item breakdown covering labor, materials, and permit costs so you can see exactly where the money goes before you sign anything. Available to any McKinney homeowner planning a kitchen, bathroom, or whole-home remodel.
Valid through March 31, 2027. Mention this offer when you call (844) 834-0609.
365-Day Done Right Promise – Included on Every Project
The 365-Day Done Right Promise is written into every completed project at no added cost. If the work fails within the full year after completion, we return and correct it at no charge. This covers labor and workmanship on the scope we performed, and you hold a signed written guarantee at job close along with the documented scope and a clean site.
Valid through March 31, 2027. Mention this offer when you call (844) 834-0609.
Free In-Home Design Consultation for Kitchen and Bath Remodels
Book a no-cost consultation with our team to walk through cabinetry, surface, and fixture options from documented brands like KraftMaid, Wellborn, Cambria, Silestone, Kohler, and Moen. We’ll talk through your layout, rough-in needs, and finish schedule so the written price you receive afterward reflects real specifications, not guesses. Open to McKinney homeowners in the planning stage.
Valid through March 31, 2027. Mention this offer when you call (844) 834-0609.
First-Time Customer Courtesy
If this is your first project with Bradford Remodeling Co McKinney, tell us when you call and we’ll walk you through The Garrison Standard and The Garrison Code – the operating frameworks behind our background-checked, uniformed technicians and our no-surprise written pricing. It’s a chance to ask every question before you commit. Available to new McKinney customers scheduling an estimate.
Valid through March 31, 2027. Mention this offer when you call (844) 834-0609.
Senior and Military Courtesy
We extend a courtesy to seniors and to active-duty and veteran military households in McKinney as a thank-you for your service and your place in the community. Call to discuss how it applies to your project scope, and we’ll document it in your written price before work begins. Applies to any general contracting, kitchen, or bath remodel we quote.
Valid through March 31, 2027. Mention this offer when you call (844) 834-0609.
Spring Tune-Up and Pre-Remodel Walkthrough
Before you commit to a remodel, we’ll walk your home to flag items a contractor would catch – substrate conditions, soffit and exterior wear, door and window performance on Therma-Tru and James Hardie products, and areas where moisture or settling may affect scope. This helps you plan a realistic budget and avoid change orders mid-project. Open to McKinney homeowners considering a remodel in the next year.
Valid through March 31, 2027. Mention this offer when you call (844) 834-0609.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
How to Redeem
One: call (844) 834-0609 and mention the specific offer by name, or tell the live person which project type you’re planning. Two: book your estimate or consultation visit at a time that fits your schedule. Three: present the offer when our team arrives for the visit or at the time of service, and we’ll apply it to your written price. That’s it – no forms to chase, no codes to remember, no pressure at the door.
What “Squared Away” Looks Like When We Close a Job

When a Bradford project wraps, you should be able to look at four things and know the job is finished: a clean site with no leftover debris, a documented scope that matches what was built, a written guarantee signed and in your hand, and a final price that hasn’t moved from the written number we gave you before work started. That’s what The Garrison Standard means in practice, and it’s the reason we put every offer on this page in writing rather than in a phone pitch. Call (844) 834-0609 to schedule your free estimate and talk through which special fits your McKinney project.
Written by the team at Bradford Remodeling Co McKinney.
See the difference
Before
After
Before
After
Before
After


