







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterAn answer-first opening on bathroom remodel cost in McKinney, with the local clay-soil angle front and center.
Bathroom remodel costs in McKinney run from $9,000-$28,000 for most full projects, with a small bath landing around $5,000-$12,000 and a primary-bath gut with a walk-in shower conversion pushing toward the top of that range. The number that matters more than the material grade is the installation method underneath it: here on Blackland Prairie clay, a quote that skips uncoupling membrane under floor tile and a full mortar-bed shower pan is priced to crack, not to last. Call (844) 834-0609 for a written price before any work starts.
Why McKinney Bathroom Costs Are Set by What’s Under the Tile
Most bathroom quotes you’ll collect in McKinney are built line by line around what you can see: the tile, the vanity, the fixtures. That’s the easy part to price and the easiest part to underbid. The part that decides whether your bathroom is still sound in 18 months is the assembly you never see once the job is closed up.
The ground here makes that decision harder than it is in most markets. McKinney sits on expansive Blackland Prairie clay that swells in the spring storms and shrinks through hot, dry summers. Under a post-tension slab – the standard foundation across Stonebridge Ranch, Craig Ranch, and the 1990s-to-2010s subdivisions – that wet-dry cycle produces constant micro-movement. Tiny, but relentless. Tile set directly on a slab doesn’t flex with it; grout takes the strain first, then the waterproofing behind it.
That’s why a proper bathroom remodel in McKinney treats crack isolation as a requirement, not an upgrade. An uncoupling membrane like Schluter Ditra under the floor tile decouples the finish from the slab so the movement goes into the membrane instead of your grout joints. In a shower, a full mortar-bed pan with a correctly sloped liner and a pre-slope beneath it is what keeps water moving toward the drain rather than sitting against the substrate. Skip either and the failure isn’t a question of if.
What does the crack-isolation layer add to a McKinney quote?
Plan on roughly $400-$900 for uncoupling membrane across a typical bathroom floor, plus $300-$700 for a properly built mortar-bed shower pan over a pre-sloped liner, depending on size. That’s a small slice of the total – and it’s the slice that prevents a $3,000-$6,000 tear-out later. The honest tell on a quote is whether these items are named as line items at all. If the quote is silent on membrane and pan construction, the price isn’t lower. The risk has just been moved to you.

What a McKinney Bathroom Remodel Costs by Scope
Three scopes cover almost every bathroom project we price in McKinney, and the ranges below reflect what the work actually costs here rather than a national average. All of it comes with a written price before any work starts.
| Scope of work | Typical cost |
|---|---|
| Bathroom remodel (full, mid-grade) | $9,000-$28,000 |
| Small bathroom remodel | $5,000-$12,000 |
| Walk-in shower installation | $4,500-$12,000 |
| Tub-to-shower conversion | $3,500-$10,000 |
| Shower replacement | $3,000-$8,500 |
| Bathroom vanity installation | $800-$3,000 |
Read it in tiers. A vanity-and-fixture swap – new cabinet, top, faucet, and lighting without moving plumbing – lands in the low thousands. A full tile-and-fixture overhaul with new floor, shower tile, and fixtures covers most of the full-remodel range. A primary-bath gut with a shower conversion and layout change sits at the top, because moving a drain or supply line means opening the slab, and that’s where budgets actually move.
Line items that push a McKinney bathroom up or down:
- Tile and membrane: $1,800-$5,500 for floor and shower tile with the uncoupling and pan work included.
- Vanity and top: $800-$3,000, more if you go to a Cambria or Caesarstone surface with a cut-to-fit top.
- Fixtures: $600-$2,200 for a Kohler or Moen shower valve, trim, and faucet set.
- Layout changes: $1,500-$4,000 when a drain or supply has to move through the slab.
- Exhaust and moisture control: $250-$700 for a properly sized, ducted fan – a real item in a climate that runs humid in spring.
One more local note worth knowing before you sign anything: in the historic preservation district around the 1800s courthouse square downtown, exterior changes need design review. Bathroom interiors usually aren’t affected, but if your project touches a window or exterior vent on a downtown property, plan the review into the schedule. For the full scope of what we handle, see Bathroom Remodeling.
Named Fixtures Mean You Can Check the Warranty Yourself
A contractor telling you the fixtures are “good quality” is worth exactly nothing at year three when a cartridge fails and nobody can tell you who honors it. Named brands change that. When your quote specifies a Kohler valve and trim or a Moen faucet, you can look up that model’s warranty terms on the manufacturer’s own site before you sign – finish coverage, cartridge coverage, the exclusions. You’re not relying on anyone’s verbal assurance.
That’s part of why we work from a documented roster of name-brand materials rather than whatever’s on the shelf that week: KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures. The specs are traceable, and the manufacturer warranty sits underneath our own home guarantee rather than replacing it.
What does the 365-Day Done Right Promise cover on a bathroom job?
Every completed Bradford bathroom carries a full-year written guarantee. If the work fails inside that window – grout cracking from slab movement, a shower pan that leaks, a fixture installed wrong – we come back and correct it at no charge. On waterproofing specifically, the guarantee is explicit about who pays: us. A failed pan or a cracked joint inside the year is our return visit, not your invoice. That’s The Garrison Standard in practice, and it’s in writing in your hand at close, alongside a clean site and the documented scope.
Behind the promise: our technicians bring up to 22 years of experience, and every one is background-checked and uniformed. On a bathroom job that matters more than it sounds. A master bath sits inside your primary bedroom, and you’re handing a crew access to the most private space in the house. You know exactly who’s coming through that door before they arrive. Live-person phone coverage means when you call, a real person answers, not a queue.

FAQs
A full bathroom remodel in McKinney typically runs $9,000-$28,000, a small bath $5,000-$12,000, and a tub-to-shower conversion $3,500-$10,000. The spread comes from scope and layout changes, not from material grade alone. Call (844) 834-0609 for an exact written price – estimates are free.
Repair is cheaper only if the waterproofing underneath is still sound – and on a McKinney slab, a leak usually means the pan or the membrane has already failed, so a patch is money spent twice. A shower replacement runs $3,000-$8,500; a full walk-in install $4,500-$12,000. Call (844) 834-0609 and we’ll tell you which one your shower actually needs.
Yes – it’s a requirement here, not an upgrade, because the expansive Blackland Prairie clay under McKinney slabs moves with every wet-dry cycle and will crack grout and void waterproofing without it. It adds roughly $400-$900 to a typical floor. Call (844) 834-0609 for a quote that names it as a line item.
Same-day estimates are often available, and a live person answers the phone around the clock. We put the price in writing before any work starts, and the 365-Day Done Right Promise covers every completed bathroom for a full year. Call (844) 834-0609 to get on the schedule.
Get Your McKinney Bathroom Priced in Writing
If your quote doesn’t spell out the membrane, the shower pan, and the fixture models by name, it isn’t a price – it’s a guess with a low number attached. Bradford Remodeling Co McKinney puts every line and every guarantee in writing before a tool comes out, backed by the 365-Day Done Right Promise. Call (844) 834-0609 for a free estimate.
Written by the team at Bradford Remodeling Co McKinney, serving McKinney, TX.
What Our Customers Say
"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."
- Tricia S."Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."
- Cal P.












