A Bradford company - serving McKinney, TX
An open living room and dining area after a whole-home remodel

Before & After Gallery - Bradford Remodeling Co McKinney

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
A dining nook with a built-in banquette
A home office with a built-in desk and shelves
An open living space after a whole-home remodel
A remodeled living room with built-in shelves around the fireplace
A whole-home remodel with the living, dining and kitchen areas opened up
A wood double vanity with two mirrors after a bathroom remodel
A finished backyard cottage with a small covered porch
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Construction Before & After in McKinney, TX

Pictures carry more weight than promises. On this page we show what the work actually looks like in McKinney: the failing substrate under a tired kitchen floor, the water stain on a ceiling no one could locate, the 1990s bathroom with good bones and bad finishes. Each entry walks you through the problem, what we did about it, and what the homeowner ended up with. Photos are being added project by project.

Call (844) 834-0609

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Recent Transformations

Kitchen Remodel: 1990s Oak Cabinets to KraftMaid and Cambria

BeforeBeforeAfterAfter
Before: original 1990s oak kitchen, laminate countertops, and a peninsula that cut the room in half.
BeforeBeforeAfterAfter
After: KraftMaid cabinetry, Cambria quartz, and an open sightline from the range to the breakfast nook.

The problem: Twenty-five-year-old oak cabinets, laminate counters with a burned spot near the range, and a peninsula that made the kitchen feel narrow every time two people cooked at once. The tile floor had two cracked pieces, which usually means movement underneath. What we did: we pulled the tile and found a substrate that hadn’t been properly fastened and leveled, corrected it, then installed new KraftMaid cabinets with Cambria quartz counters and a wider opening where the peninsula stood. The result: the same square footage now reads as one open room, and the floor under it was fixed correctly rather than covered over.

Master Bathroom Remodel: Replacing a Failing Shower Pan

BeforeBeforeAfterAfter
Before: original fiberglass shower pan, loose wall tile, and a soft spot along the curb.
General contractor reviewing renovation blueprints with a client in a home.
After: tiled walk-in shower with a properly sloped pan, Kohler shower valve, and Moen trim.

The problem: a fiberglass shower pan that flexed underfoot and a soft spot along the curb where water had been getting behind the tile. That kind of flex is the classic sign of a pan that lost its mortar bed, and it lets moisture travel under the whole shower. What we did: we removed the pan and the lower wall tile, repaired the framing that had soaked up the leak, rebuilt a properly sloped mortar bed, and finished the shower with a Kohler valve and Moen trim. The result: a walk-in shower that drains correctly and doesn’t move when you step in. Homeowners often ask how we know a leak is truly fixed. The answer is the water test and the slope, not the tile on top.

Whole-Home Remodel: Opening a Load-Bearing Wall Between Living and Kitchen

Contractors carrying drywall in a residential building construction project
Before: a load-bearing wall separated the living room from the kitchen and blocked light from the rear windows.
professional general contractor service
After: new structural beam in place, flooring run continuous from living room to kitchen, and daylight reaching the front of the house.

The problem: a load-bearing wall between the living room and kitchen cut the house in half and blocked light from the rear windows. Removing it isn’t a carpentry task, it’s a structural one. What we did: we had a structural engineer size a beam for the span, pulled the required McKinney permit, installed the header and posts on proper footings, passed the framing inspection, and then finished both rooms with continuous flooring so the transition reads clean. The result: one open living space with the load carried correctly and inspection paperwork on record. Any wall you’re told is “probably not load-bearing” deserves the same check before a saw goes anywhere.

Home Remodel: Water Damage Repair and Upstairs Rebuild

Two professional contractors installing custom kitchen cabinets during a home remodel.
Before: water-stained ceiling below an upstairs bathroom, with drywall that had begun to sag.
Professional contractor installing a marble kitchen countertop during a home remodel
After: new drywall, primer and paint blended to the room, and rebuilt closet framing below.

The problem: a ceiling stain below an upstairs bathroom where the source was never pinned down. Old water damage that keeps reappearing usually comes from a slow seep, not a burst pipe, and it lets mold take hold in the framing. What we did: we opened the ceiling to find the source, repaired the plumbing and the rotted framing, replaced the wet drywall, and repainted the ceiling to blend the room. The result: a ceiling that stays dry and framing that’s sound. We document the repair with a written scope and a signed guarantee so the homeowner knows what was opened and what was fixed.

Kitchen Remodel: Wellborn Cabinetry and a Working Triangle

Professional construction worker applying mortar for kitchen subway tile installation
Before: narrow galley layout, worn vinyl flooring, and appliances placed so the work triangle didn’t function.
professional bathroom remodeling service
After: Wellborn cabinetry, repositioned appliances, and durable flooring that ties the galley together.

The problem: a galley kitchen where the range, sink, and refrigerator were scattered so far apart that cooking meant constant crisscrossing. The flooring was worn vinyl over a subfloor with visible low spots. What we did: we planned the layout around a proper work triangle (the distance between sink, stove, and fridge), installed Wellborn cabinetry to fit the new positions, and leveled the subfloor before laying new flooring. The result: a galley that actually works, with storage that reaches the ceiling instead of stopping at the top of the old cabinets.

Whole-Home Remodel: Aging-in-Place Bathroom Conversion

Two contractors framing a doorway during professional bathroom remodeling project.
Before: a standard high-curb shower and a narrow doorway that made the room hard to use safely.
Contractors framing a new interior wall during bathroom remodeling
After: curbless shower with grab bars, a wider door opening, and slip-resistant flooring.

The problem: a master bathroom with a high-curb shower and a narrow doorway that a homeowner wanted to keep using at home safely as they got older. What we did: we converted the shower to a curbless entry with a properly waterproofed pan, installed grab bars anchored into blocking behind the tile, and widened the door opening to a standard accessible width. The result: a bathroom that keeps its resale value while making daily use safer. Aging-in-place work like this depends on blocking and waterproofing done correctly the first time, which is exactly what the 365-Day Done Right Promise is there to cover.

Want Results Like These?

Call (844) 834-0609 for a free estimate on your McKinney remodel. You’ll get a written price before any work starts, a live person answers the phone any hour of the day, and every finished project carries the 365-Day Done Right Promise. Galley kitchen, load-bearing wall, or a shower that needs rebuilding, we’ll walk the space with you and tell you what it takes.

Written by the team at Bradford Remodeling Co McKinney.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in McKinney? Licensed & insured · free written estimates
Call (844) 834-0609
Local Service Coverage

Request a Free Estimate in McKinney

Tell us what you need - Bradford Remodeling Co McKinney responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch