







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Kitchen Remodeling in McKinney: What to Know First
We provide independent KraftMaid kitchen remodeling in McKinney, and a full kitchen typically runs $14,000 to $45,000 depending on cabinet scope, countertop material, and whether the layout moves. Most KraftMaid cabinet-and-countertop projects take three to six weeks from demo to final walkthrough. Every price we give is written before work starts, and every finished job carries the 365-Day Done Right Promise. If you own KraftMaid cabinetry and want it kept, matched, or replaced by a crew that knows the line, call (844) 834-0609 to schedule your free estimate.

How KraftMaid Products Fail – and How We Fix Them
KraftMaid builds a solid cabinet, but we’ve torn into enough McKinney kitchens to know exactly where these boxes, doors, and finishes give out first. Here are the five failures we see most, and what we do about each.
- Door and drawer finish wear on the Heirloom and Dalton lines. Painted and glazed finishes in these series hold up well until a McKinney summer pushes indoor humidity past 60% for weeks at a stretch. The glaze along the drawer front edge starts to craze, then flakes. We don’t spot-paint. We refinish or replace the doors as a set so the sheen matches across the run, matching the original KraftMaid finish code stamped inside the cabinet door.
- Particleboard box swelling near the sink and dishwasher. The standard-construction boxes KraftMaid uses in its mid-tier lines are fine dry, but a slow dishwasher leak or a sink caulk joint that fails soaks the deck and the stiles swell and delaminate. We pull the cabinet, replace the damaged boxes with plywood-construction units where the line allows, and re-caulk with a mold-resistant silicone rated for wet areas.
- Soft-close hinge and drawer-glide fatigue. KraftMaid’s soft-close hinges and undermount glides are good hardware, but after roughly a decade of daily use the dampers lose tension and doors slam. We replace with OEM KraftMaid hinges and glides, not aftermarket units, so the hardware stays warranty-consistent with the cabinet line.
- Sagging wall cabinets and failed anchors. In McKinney’s slab-on-grade homes, we regularly find wall cabinets hung on drywall anchors instead of into studs or blocking. Loaded with dishes, they pull loose at the top rail. We re-hang into studs or add blocking behind the drywall, then re-level the whole run so the reveal lines are even.
- Mismatched replacement doors ordered wrong. The most common homeowner mistake is ordering a replacement door online by eye instead of by the code inside the cabinet. You get the wrong overlay or wood grain and it never looks right. We read the code, confirm the series and finish, and order the correct part the first time.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our KraftMaid Kitchen Remodeling Process
- 1
On-site assessment. We measure the layout, read the KraftMaid model and finish codes inside the doors, and photograph every failure point: swollen boxes, failed hinges, cracked substrate under the countertop.
- 2
Written scope and price. Before any tool comes out, you get a line-item written price: which cabinets are being refaced, which are being replaced, what countertop material, what backsplash tile. That number doesn’t move at the door.
- 3
Parts decision. For a repair, we use OEM KraftMaid hinges, glides, and doors so the work stays consistent with the cabinet line. Where a full replacement makes more sense than a patch, we tell you plainly and price both.
- 4
Installation. Cabinets set and leveled, countertops templated and installed, backsplash tiled, flooring and trim finished to the documented scope.
- 5
Walkthrough and test. We open every door and drawer, check the soft-close, confirm the countertop seams, and clean the site so you’re left with a squared-away kitchen, not a punch list.
- 6
Written guarantee in hand. You get the signed 365-Day Done Right Promise. If anything fails inside that year, we come back and correct it at no charge.
What KraftMaid Kitchen Remodeling Costs in McKinney
| Scope | Typical Range |
|---|---|
| Full kitchen remodel (KraftMaid cabinets, counters, backsplash) | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| KraftMaid cabinet installation | $4,000 – $13,000 |
| Countertop installation (Cambria, Silestone, Caesarstone) | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
What moves the price: whether we’re keeping the KraftMaid boxes or replacing them, moving plumbing or electrical, and countertop material (a quartz surface costs more than laminate). A refacing job where the boxes are sound sits at the low end; a full gut with new cabinets and a moved island lands at the top. Every estimate is free and written, line by line, before work begins. Call (844) 834-0609 for your written price.
See the difference
Before
After
Before
After
Before
AfterWhy McKinney Homeowners Call Bradford Remodeling Co McKinney for KraftMaid Work
We’re the by-the-book contractor for homeowners who’ve been burned by no-shows, surprise invoices, and unfinished work. As an independent KraftMaid service provider, we’re not tied to the manufacturer, so we tell you straight whether a repair or a replacement is the right call. Our technicians have up to 22 years of experience and they know the KraftMaid series by name. A live person answers the phone, day or night, so you’re never stuck in a callback queue. And we back up our KraftMaid work with the documented brand roster we also install: Kohler and Moen fixtures, Cambria and Silestone surfaces, Toto, plus KraftMaid and Wellborn cabinetry, so every spec is traceable. Bradford Remodeling Co McKinney is part of the Garrison Partners family, independently owned and held to The Garrison Standard: written price, background-checked crew, and the 365-Day Done Right Promise on every job.
FAQs

Not if the work is done correctly. KraftMaid’s warranty stays intact when repairs use OEM hinges, glides, and doors and when the cabinet structure isn’t altered improperly. We use OEM parts specifically to keep you warranty-consistent. Call (844) 834-0609 to talk through your cabinet line before anything is ordered.
Yes. KraftMaid parts and finish-matched doors are available, and the key is ordering by the code stamped inside your cabinet door, not by eye. We read the code, confirm the series and finish, and order the correct part the first time. Call (844) 834-0609 for a free estimate.
If the boxes are solid and dry, refacing or replacing doors and hardware usually costs far less than a full replacement. If the boxes are swollen from a sink leak or the layout needs to change, replacement makes more sense. We price both so you can decide. Call (844) 834-0609 for your written quote.
A full kitchen generally runs $14,000 to $45,000 in McKinney, a small kitchen $9,000 to $20,000, and cabinet installation alone $4,000 to $13,000. Call (844) 834-0609 for an exact written quote, free of charge.
Most cabinet-and-countertop projects take three to six weeks from demo to final walkthrough, depending on whether the layout moves and what countertop material you choose. Call (844) 834-0609 to schedule your free estimate and a firm timeline.
Get Your KraftMaid Kitchen Squared Away
If your KraftMaid kitchen is showing its age, call Bradford Remodeling Co McKinney at (844) 834-0609 for a free estimate. You’ll get a written, line-item price before any work starts, a background-checked crew you can name, and a signed 365-Day Done Right Promise when the job closes. A live person answers around the clock. Call today for your free estimate.
Written by the team at Bradford Remodeling Co McKinney, serving McKinney and nearby areas.












