







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat It Costs to Hire a General Contractor in McKinney, TX
Hiring a general contractor in McKinney typically runs $14,000-$45,000 for a full kitchen remodel, $45,000-$130,000 for a home addition, and $9,000-$28,000 for a bathroom. Those are the construction numbers. What most quotes leave out is the cost of a scope that ignores the ground under the house. Call Bradford Remodeling Co McKinney at (844) 834-0609 for a written price before any work starts.
Most McKinney homeowners get a GC quote that looks complete, then a wet spring proves it wasn’t. The slab shifts, the new tile cracks, and the drainage correction nobody priced becomes the change order that eats the budget. In a town built on Blackland Prairie clay, a contractor’s markup matters far less than whether the written scope is right.

Why the Ground Under a McKinney House Changes the Price
McKinney sits on expansive clay that swells when it’s wet and shrinks hard through a dry Texas summer. Around Stonebridge Ranch and Craig Ranch, the master-planned subdivisions built from the 1990s into the 2010s rest on post-tension slabs, and those slabs move with the soil. After a dry stretch you’ll see doors that stick and hairline cracks open across a garage floor. That movement is the local tell, and it’s the reason a remodel touching floors, doors, or tile in one of those homes needs a drainage and soaker-hose assessment priced into the job from day one.
Skip that line item and the GC is marking up a scope that was flawed before the first tool came out. The finish work can fail inside a year, and the warranty argument starts. Downtown McKinney, where the 1800s courthouse square sits inside a strict historic preservation district, adds a second variable: exterior work there goes through design review, which affects schedule and cost on its own.
What that means in dollars: a scope with drainage correction built in costs more upfront, but it removes the change-order surprise tied to soil conditions the contractor already knew about. A written price with the assessment included is the difference between a fixed number and a number that moves at the door.
Three Ways Contractors Price a Job – and Which One Protects You
Ask how the number is built, not just what it is. General contractors in McKinney generally use one of three cost structures, and they behave very differently when soil movement forces a scope change in month two.
- Flat fee. One number for the whole project. Simple, but when a scope gap appears, the contractor has to protect the fee, and the conversation about who pays gets harder.
- Cost-plus percentage. Materials and labor plus a set markup. Transparent on paper, but every surprise adds to the bill, so a foundation or drainage discovery inflates the total with the markup on top.
- Fixed-price written contract. A defined scope and a defined price, signed before work starts. When the scope is priced correctly, including the clay-related line items, this is the structure that keeps a McKinney homeowner from paying for someone else’s miss.
Bradford Remodeling works on the fixed-price written contract, and The Garrison Standard makes that non-negotiable: a written price before any work begins, every time, no numbers that move at the door. You know your number before the crew arrives, and you know exactly who is walking through the door, because technicians are background-checked and uniformed on every job.

What a General Contractor Costs in McKinney, by Project
These ranges reflect McKinney market pricing for common scopes. Slab-adjacent work – floors, structural changes, anything that ties into a post-tension foundation – runs 15-25% higher to warranty correctly, because the drainage and soil assessment is part of doing the job right rather than a line added later.
| Project | Typical Range |
|---|---|
| Kitchen remodel | $14,000-$45,000 |
| Small kitchen remodel | $9,000-$20,000 |
| Bathroom remodel | $9,000-$28,000 |
| Walk-in shower installation | $4,500-$12,000 |
| Home addition | $45,000-$130,000 |
| ADU construction | $90,000-$220,000 |
| Garage conversion | $30,000-$80,000 |
Cosmetic refreshes – cabinets, counters, a Kohler or Moen fixture swap – sit at the low end of those ranges and rarely touch the slab. Structural and slab-adjacent scopes sit at the high end and need the assessment line built in. For a closer look at specific build types, see our pages on home remodeling and additions.
What the 365-Day Done Right Promise Actually Covers
Most contractors give you a one-year verbal workmanship warranty. Ask what happens when a deferred failure shows up – clay movement that cracks a tile floor eight months after a remodel – and the conversation usually gets vague. Bradford’s 365-Day Done Right Promise is written, on every project, for a full year. If the work fails inside that window, we come back and correct it at no charge.
The difference matters most in a city where the ground keeps moving. Verbal coverage depends on someone remembering the conversation and agreeing it was their fault. Written coverage means the homeowner is holding the terms at job close, alongside a documented scope and a signed guarantee, on a clean site. That is what squared away looks like. Material specs are traceable too – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, GAF and James Hardie exterior products, Therma-Tru doors – so when something does need correcting, the manufacturer specs and warranties are already on record.
FAQs About Hiring a General Contractor in McKinney
Most McKinney GC projects fall between $9,000 for a small kitchen or bathroom refresh and $130,000 or more for a full home addition, with the price tied to the written scope rather than a flat markup. Slab-adjacent work runs 15-25% higher to warranty correctly because drainage and soil assessment is priced in. Call (844) 834-0609 for an exact written quote – estimates are free.
A fixed-price written contract protects a McKinney homeowner better when soil conditions force a scope change mid-project, because the price is set and the scope is defined before work starts. Cost-plus passes every surprise – and the markup on it – straight to you. Bradford builds the drainage assessment into the original scope so the fixed number holds.
Same-day estimates are often available depending on schedule, and a live person answers the phone 24/7 at (844) 834-0609 – no voicemail, no callback queue. Our technicians have up to 22 years of experience with both historic homes near the downtown square and post-tension slab homes in Craig Ranch.
The 365-Day Done Right Promise covers completed work for a full year in writing, including corrections if the work fails within that window. The cleanest way to protect that coverage is to price drainage and soil correction into the original scope so the finish work isn’t fighting moving clay. Call (844) 834-0609 to talk through what your project’s guarantee would cover.
Get a Written Price Before Any Work Starts
In McKinney, the right GC is the one whose written scope accounts for the clay under your house. Bradford Remodeling works to the fixed-price written contract, a documented material roster, and the 365-Day Done Right Promise. Call (844) 834-0609 for a free estimate and a written price, before a single tool comes out.
Written by the team at Bradford Remodeling Co McKinney, serving McKinney, TX.
What Our Customers Say
"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."
- Tricia S."Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."
- Cal P.












