







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat Cabinet Refacing Costs in McKinney, TX – And When It’s the Wrong Move
Cabinet refacing in McKinney typically runs $4,500 to $9,000 for an average kitchen, using Wellborn or KraftMaid door and drawer fronts over a verified-sound box. Full cabinet replacement on the same footprint runs $14,000 to $22,000. The gap is real, and it holds only if your existing cabinet boxes pass inspection. That inspection is the part most price guides skip. Call (844) 834-0609 and we’ll tell you straight whether refacing is the right call for your kitchen.
A refacing job on a sound box is a smart buy. A refacing job on a swollen particleboard box in a 25-year-old Stonebridge Ranch home is money you’ll spend twice.

Why the Box Matters More Than the Door in McKinney
Most of McKinney’s master-planned subdivisions were built between 1992 and 2010, and the cabinetry from that era is overwhelmingly particleboard box construction with a melamine or vinyl wrap. These homes sit on post-tension slabs. That combination creates two failure patterns we see constantly.
- Vapor transmission through the slab. North Texas’ expansive Blackland Prairie clay moves with every wet-dry cycle, and post-tension slabs are designed to flex with it. Moisture migrating up through the slab reaches the cabinet floor and toe-kick first, where particleboard swells and delaminates. A home in Craig Ranch or Adriatica built in 2004 may look fine from the door side and be soft at the base.
- Under-sink leaks that went unnoticed for years. A slow drip behind a supply line or a failed disposal flange soaks the cabinet floor over months. The damage spreads under the veneer and into the drawer rails before anyone notices.
Refacing over a compromised box conceals the failure rather than correcting it. The new veneer adhesive needs a stable substrate to bond to. Over swollen particleboard, the bond fails, edges lift, and the job comes apart within a couple of years. That’s why the honest first step in any McKinney kitchen is a box-integrity assessment, not a door-and-veneer quote.
What a Legitimate Box-Integrity Check Covers
When we walk a McKinney kitchen for a refacing estimate, we check three things before we quote a number. These are the signs that tell us whether the substrate will hold new veneer.
- Delamination at the cabinet floor. We probe the bottom panel and the joints where it meets the sides. Soft spots, lifting edges, or a floor that flexes under hand pressure mean the box is compromised.
- Toe-kick moisture staining. Dark staining, bubbling wrap, or a musty smell at the base of the cabinets points to slab vapor or a long-running leak. We check this on every run, not just under the sink.
- Drawer-slide rail corrosion. Rusty or pitted slides tell us moisture has been present long enough to attack metal. A box that’s been wet that long usually won’t hold adhesive.
Our written scope document states explicitly whether each cabinet run passed or failed inspection, before any refacing price is confirmed. That’s The Garrison Standard in practice: the number on the page matches the condition of your kitchen, not a ballpark we revise at the door.

Refacing Cost Breakdown for a McKinney Kitchen
Here’s what the line items look like. These ranges hold for the average McKinney kitchen, roughly 20 to 30 linear feet of cabinetry, assuming a sound box.
| Item | Typical Range |
|---|---|
| Refacing, sound box, Wellborn/KraftMaid fronts | $4,500 – $9,000 |
| Cabinet installation (full replacement, same footprint) | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Full kitchen remodel (refacing plus counter, splash, island) | $14,000 – $45,000 |
These numbers are market-calibrated for McKinney. If you’re weighing refacing against a larger scope, our Kitchen Remodeling page lays out how the phases fit together, and the Kitchen Remodeling in McKinney page covers the local build conditions in more detail.
When Partial Replacement Beats Whole-Kitchen Replacement
If two or more cabinet runs fail inspection, the math shifts. Replacing only the failed sections and refacing the sound ones is often cheaper than tearing out the whole kitchen, and it should be priced as a separate line item so you can see exactly what you’re paying for.
Say your sink run and one base run under the cooktop are swollen, but the wall cabinets and the island are dry and solid. We’d scope replacement of the two failed runs and refacing of everything else. That mix usually lands well below full replacement, and you keep the doors you like on the runs that are sound. We won’t quote a mixed scope as one lump number; you’ll see the refacing line and the replacement line separately in the written price.
How We Work in McKinney Kitchens
Bradford Remodeling Co McKinney works with a documented roster of premium materials: KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures. Every brand carries manufacturer specifications and warranties that back our own guarantee, which means the specification is traceable. You’re not guessing what’s behind the door.
Our technicians have up to 22 years of experience, and they’re background-checked and uniformed on every job, so you know who’s walking through your door before the crew arrives. Every project gets a written price before work starts. Every completed project carries the 365-Day Done Right Promise: if the work fails within the guarantee period, we come back and correct it at no charge. At close, you get a clean site, a documented scope, and a signed written guarantee in your hand.
A live person answers the phone 24/7, not a voicemail or a callback queue. Bradford Remodeling is part of the Garrison Partners family, established in 2004 and held to The Garrison Standard, and each location is independently owned and operated.
FAQs
Cabinet refacing in McKinney typically runs $4,500 to $9,000 for an average kitchen using Wellborn or KraftMaid door and drawer fronts on a verified-sound box. That compares with $14,000 to $22,000 for full cabinet replacement on the same footprint. The refacing price only holds if the boxes pass inspection. Call (844) 834-0609 for an exact quote; estimates are free.
Refacing is usually cheaper, often by half or more, but only when the cabinet boxes are sound. In McKinney’s 1990s and 2000s tract homes, particleboard boxes can carry moisture damage from slab vapor transmission or old under-sink leaks, and refacing over a failed box comes apart within a couple of years. That’s why the box check comes first. Call (844) 834-0609 and we’ll inspect before we quote.
Three signs tell you the box won’t hold new veneer: delamination or soft spots at the cabinet floor, moisture staining or bubbling at the toe-kick, and corrosion on the drawer-slide rails. Any one of these means the substrate has been wet and failed. We check all three on every run and put the pass-or-fail result in writing before confirming a price. Call (844) 834-0609 to schedule the assessment.
Yes, same-week estimates are usually available, and a live person answers the phone 24/7 to schedule. We’ll inspect your cabinet boxes, document pass or fail per run, and give you a written price before any work starts. Call (844) 834-0609 for a free estimate.
Get a Written Price Before You Commit
Whether refacing makes sense for your McKinney kitchen comes down to the condition of the boxes under the doors. We’ll inspect, document what passed and what didn’t, and give you a written price with the scope spelled out. Call (844) 834-0609 for a free estimate. Live person, 24/7.
Written by the team at Bradford Remodeling Co McKinney, serving McKinney, TX.
What Our Customers Say
"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."
- Tricia S."Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."
- Cal P.












