A Bradford company - serving McKinney, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Countertop Installation Cost in McKinney - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one accountable point of contact. Permits handled, and the local pro we connect you with is licensed and insured.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A small remodeled galley kitchen with cabinets to the ceiling
A walk-in pantry with wood shelving
A remodeled kitchen with a waterfall island and wood cabinets
A remodeled staircase with wood treads and a slim metal railing
A low-threshold walk-in shower with a bench and grab bar
A finished basement family room with a media wall and wet bar
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Countertop Installation Cost in McKinney, TX: What the Quote Should Actually Include

Countertop installation in McKinney typically runs $2,000 to $6,500 for the countertop itself, and a full kitchen remodel that includes new surfaces lands between $14,000 and $45,000. Call (844) 834-0609 for a written, upfront price. But here’s what the number on most quotes leaves out: after a dry Texas summer, a surprising share of McKinney’s cabinets aren’t plumb anymore, and that gap doesn’t show up until demo day. The cost isn’t just the slab. It’s what’s underneath it.

Installers leveling a new base cabinet during a kitchen remodel

Why McKinney Cabinets Get Racked Out of Level Before You Even Order Stone

McKinney sits on Blackland Prairie clay, the expansive soil that swells with spring rain and shrinks through a hot, dry North Texas summer. That wet-dry cycle works on a post-tension slab constantly. In the master-planned subdivisions built through the 1990s and 2000s, the base cabinet runs can drift 3/8″ to 5/8″ out of level over the years, and you won’t notice until someone pulls a level across the tops.

That drift is the hidden line item. Before a single slab is templated, the cabinets have to be brought back to plumb, which means shimming, resetting, or refacing the run so the stone has something true to sit on. Skip it and you get a countertop that looks flat but rocks under a coffee cup, or a seam that pops within a year. In Stonebridge Ranch and Craig Ranch, we account for this in the written price, typically an added $300 to $600, so it doesn’t surface as a “surprise” once your old tops are in the dumpster. This is why we do a cabinet-level check as the first step, not the last.

The historic homes around the 1800s courthouse square tell a different story. There, the framing is older and often hand-built, and any exterior-facing work inside the historic preservation district needs design review before it starts. Countertops themselves are usually interior, but if your scope touches a window, an exterior door, or anything visible from the street, plan for that review time in your schedule.

What Drives the Price of Quartz vs. Granite in McKinney

Material choice is the single biggest lever on cost, and the two brands we spec most, Cambria and Caesarstone, behave differently from granite in ways that affect your final number.

  • Quartz (Cambria, Caesarstone): Factory-consistent thickness and a non-porous surface mean fewer waste cuts and no sealing. Pricing holds steady because the slab comes off a controlled line, not out of the ground in unpredictable blocks. That consistency is why a quartz quote is easier to lock in.
  • Granite: A natural slab. Thickness, veining, and fissures vary block to block, so waste cuts are higher and the fabricator works around what the stone gives them. Beautiful, but less predictable on price.

Under or over either one, the plumbing disconnect and reconnect matters. We reinstall your Kohler or Moen fixtures on the new surface as a line item, not a verbal promise. Same for tear-out and disposal of the old tops.

A remodeled family room with new windows and a window seat

Countertop Installation Cost Breakdown for McKinney

Here’s how the numbers land for a typical McKinney kitchen. Your written price will line-item each of these before any work starts.

Line Item Cost Range
Countertop installation (material + labor) $2,000 - $6,500
Cabinet-level check and shim/refacing adjustment $300 - $600
Templating and fabrication lead time Included (10-14 days)
Plumbing disconnect/reconnect (Kohler/Moen) Included
Tear-out and disposal of old tops Included
Backsplash installation $800 - $2,500
Kitchen island installation (if adding one) $3,000 - $10,000
Full kitchen remodel (surfaces + cabinetry + scope) $14,000 - $45,000

Fabrication lead time is part of the budget, too. Cambria and Caesarstone fab shops serving Collin County typically need 10 to 14 days from template to install. If your timeline is tight, that window is the one to plan around, not the install day itself. For the full scope of what a new surface fits into, see our Kitchen Remodeling page.

The Written Price, the Guarantee, and What “Squared Away” Looks Like

Bradford Remodeling Co McKinney works under The Garrison Standard: every price is in writing before a single tool comes out, and it doesn’t move at the door. That written price includes the cabinet-level check, the templating, the tear-out, and the plumbing reconnect, so there’s no line that appears after demo. Our technicians have up to 22 years of experience, and every job is background-checked and uniformed, so you know who’s walking through your door.

Every completed countertop carries the 365-Day Done Right Promise. If the work fails within that year, we come back and correct it at no charge. This is where the guarantee earns its keep on a stone install: grout joint separation and edge delamination are covered, in writing, before you sign. Get the contractor to state that on paper, not over the phone. When the job closes, you have a clean site, a documented scope, and a signed guarantee in your hand.

If your project reaches past the countertops into cabinetry or a full layout change, that’s where our Kitchen Remodeling in McKinney work picks up. Start from the home page to see the full range of what we take on.

FAQs

Get a Written Price Before Anything Is Ordered

Don’t let the cabinet-level check become the number that appears after demo. Bradford Remodeling Co McKinney puts every line in writing, from templating to plumbing reconnect, and backs it for a full year. Call (844) 834-0609 for a free estimate, and a live person answers, day or night.

Written by the team at Bradford Remodeling Co McKinney, serving McKinney, TX.

What Our Customers Say

★★★★★ 5.0 from 4+ reviews

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A remodeled hall bathroom with patterned floor tile and painted wallsA powder room with botanical wallpaper and a stone sinkA remodeled laundry and mudroom with a bench, cubbies and painted cabinetsA built-in window seat in a bay windowA dining nook with a built-in banquetteA home office with a built-in desk and shelves

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in McKinney? Licensed & insured · free written estimates
Call (844) 834-0609

Request a Free Estimate

Tell us what's going on in McKinney. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch