A Bradford company - serving McKinney, TX
An open living room and dining area after a whole-home remodel

Home Renovation Cost Per Square Foot in McKinney - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one accountable point of contact. Permits handled, and the local pro we connect you with is licensed and insured.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A dining nook with a built-in banquette
A home office with a built-in desk and shelves
An open living space after a whole-home remodel
A remodeled living room with built-in shelves around the fireplace
A whole-home remodel with the living, dining and kitchen areas opened up
A finished backyard cottage with a small covered porch
A remodeled primary bathroom with a soaking tub and walk-in shower
A single-story rear room addition with tall windows and a new patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Home Renovation Cost Per Square Foot in McKinney, TX: What the Number Actually Tells You

Most McKinney renovation budgets land between $80 and $200 per square foot for whole-home work, with kitchens running $14,000-$45,000 and full bathroom remodels at $9,000-$28,000. But that range is a starting screen, not a price. Here’s the problem: a 2,400 sq ft home in Stonebridge Ranch and a 2,400 sq ft Victorian near the courthouse square carry nearly identical square footage and renovation costs that can differ by 40% or more. Foundation type decides which one you’re in, and no per-square-foot average accounts for it. Call (844) 834-0609 for a written, room-by-room price before anything starts.

A finished basement family room with a media wall and wet bar

Why Two McKinney Homes With the Same Square Footage Price So Differently

Square footage measures floor area. It doesn’t measure what’s underneath the floor, and in McKinney that’s where the money hides.

The city splits into two construction worlds. Nearly everything built from the 1990s through the 2010s in Stonebridge Ranch, Craig Ranch, and Adriatica sits on post-tension slabs – concrete poured over tensioned steel cables that hold the slab together under load. Pre-1950s homes around the historic downtown square are pier-and-beam: a wood floor structure lifted on piers with a crawl space underneath, which makes plumbing and electrical access a different job entirely. A contractor pricing by the square foot can’t know which world your house lives in, and that’s the first assumption that collapses.

Blackland Prairie clay runs under all of it. The soil swells when North Texas gets its spring soaking and shrinks through the dry summer, and that movement shows up as sticking doors and slab cracks across 20- to 30-year-old tract homes in Stonebridge Ranch. A foundation repair quote often needs drainage or soaker-hose correction before it’s warrantable at all. Budget for a renovation that skips this step and you’re budgeting on a foundation that’s still moving.

The Two Costs a Per-Square-Foot Average Never Shows You

Post-tension slabs: you can’t just cut

Rerouting plumbing under a post-tension slab isn’t a matter of hammering out concrete. The tensioned cables inside are under load, and cutting one wrong can compromise the whole slab. Any penetrations require a PT cable map – the as-built drawing of where those cables run – plus engineered sign-off on the cut before the saw comes out.

That’s real cost, and it’s a line item that per-square-foot averages don’t carry. We price it up front because it isn’t optional. Our technicians have up to 22 years of experience with exactly this kind of work, and they know which 1990s Craig Ranch floor plans run cables where.

Historic district: design review adds time

Exterior work inside McKinney’s historic preservation district near the 1800s courthouse square goes through the city’s design review process. That means submitted drawings, a review cycle, and possibly material substitutions the commission requires – say, a window profile or siding type that matches the district’s character. Any of that changes both your schedule and your material budget. A generic cost-per-square-foot article has never heard of design review, so it can’t warn you.

A wood double vanity with two mirrors after a bathroom remodel

McKinney Renovation Cost Ranges by Project

These are the ranges we work from in McKinney. Treat them as your first screen, then let a written scope narrow them to a fixed number.

Project McKinney Cost Range
Kitchen Remodel $14,000-$45,000
Small Kitchen Remodel $9,000-$20,000
Cabinet Installation $4,000-$13,000
Countertop Installation $2,000-$6,500
Backsplash Installation $800-$2,500
Kitchen Island Installation $3,000-$10,000
Bathroom Remodel $9,000-$28,000
Small Bathroom Remodel $5,000-$12,000
Walk-In Shower Installation $4,500-$12,000
Tub-to-Shower Conversion $3,500-$10,000
Home Addition $45,000-$130,000
Garage Conversion $30,000-$80,000
Roof Replacement $8,000-$20,000
Window Replacement $4,500-$15,000

Common Local Scenarios We Price Every Week

Here’s what the per-square-foot averages miss, phrased the way it actually walks in the door:

  • A 1990s Stonebridge Ranch kitchen remodel where the sink has to move. That means cutting the post-tension slab, pulling the cable map, and getting the engineered sign-off before plumbing reroutes. The kitchen itself prices at $14,000-$45,000, and the slab work is the variable the square-foot number can’t see.
  • A pier-and-beam bath near the historic square. A walk-in shower runs $4,500-$12,000, but the substrate – the structural layer under the tile – has to handle floor movement the crawl space creates. Get that wrong and the tile cracks in two seasons.
  • An exterior renovation inside the design review district. Roof replacement at $8,000-$20,000 and window work at $4,500-$15,000. Both go through preservation review before ordering, so the calendar is part of the cost.
  • A Craig Ranch home with quarterly energy bills. Attic insulation and radiant-barrier work has become a steady McKinney niche as attic heat loads climb through the dry summers.
  • Doors sticking after a dry summer. That’s often the foundation, not the doors. We’ll flag it before a remodel proceeds, because refinishing a floor over a moving slab is money spent twice.

How to Use a Square-Foot Range Without Getting Burned

Use the number to screen. Then demand a written, room-by-room fixed scope before signing anything.

The reason “allowances” inflate so badly on some bids is that the spec was never nailed down. A per-square-foot estimate built on a generic allowance gives way the moment you pick a real cabinet. Our answer is a documented brand roster: KraftMaid and Wellborn cabinetry, Cambria and Silestone surfaces, GAF and James Hardie for the exterior. Your written price is based on named products with real manufacturer specs, not a placeholder that floats upward at selection.

That’s the discipline behind The Garrison Standard – Bradford Remodeling Co McKinney operates as an independently owned and operated member of the Garrison Partners family, established in 2004, held to the same written-price framework. Every project starts with a written price before any work begins. Every completed project carries the 365-Day Done Right Promise: if the work fails inside a full year, we return and correct it at no charge. Background-checked, uniformed technicians have their identity and conduct standards set at the Garrison Partners level, so you know who’s walking through the door. And a live person answers the phone around the clock – no voicemail, no callback queue. If you’ve been burned by no-shows and surprise invoices, that’s what a squared-away close looks like: clean site, documented scope, signed written guarantee in your hand.

FAQs

Get a Written Price on Your McKinney Renovation

Stop guessing at square-foot averages. Call (844) 834-0609 for a free estimate and a room-by-room written scope based on your actual foundation type and materials – no numbers that move at the door, backed by the 365-Day Done Right Promise.

Written by the team at Bradford Remodeling Co McKinney, serving McKinney, TX.

What Our Customers Say

★★★★★ 5.0 from 4+ reviews

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A small remodeled galley kitchen with cabinets to the ceilingA low-threshold walk-in shower with a bench and grab barA walk-in pantry with wood shelvingA powder room with botanical wallpaper and a stone sinkA remodeled kitchen with a waterfall island and wood cabinetsA walk-in shower with large-format tile and a built-in niche

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in McKinney? Licensed & insured · free written estimates
Call (844) 834-0609

Request a Free Estimate

Tell us what's going on in McKinney. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch