A Bradford company - serving McKinney, TX
A remodeled home with a front porch on a quiet street at golden hour
Lucas, TX

Remodeling Company in Lucas - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one accountable point of contact. Permits handled, and the local pro we connect you with is licensed and insured.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
An open living space after a whole-home remodel
A remodeled living room with built-in shelves around the fireplace
A whole-home remodel with the living, dining and kitchen areas opened up
A remodeled family room with new windows and a window seat
A remodeled primary suite with built-in wardrobes and a window seat
A low-threshold walk-in shower with a bench and grab bar
A walk-in pantry with wood shelving
A powder room with botanical wallpaper and a stone sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Remodeling Company in Lucas, TX

Home remodeling in Lucas means working on large-lot custom homes where the house is only half the job – wells, septic, and long drives are the other half. Bradford Remodeling runs those jobs by the book: a written price before any tool comes out, background-checked and uniformed technicians on site, and the 365-Day Done Right Promise standing behind the finished work for a full year. Call (844) 834-0609 and a live person picks up, any hour. We’ll walk the property, talk through what you’re after, and hand you a real number in writing.

Call (844) 834-0609

Why Lucas Homes Are Different

Lucas sits in Collin County as a low-density, semi-rural enclave, and construction here is a hybrid of suburban homebuilding and rural infrastructure work. New custom homes go up on large acreage lots where city utilities simply don’t reach, so septic systems and private water wells are the norm rather than the exception, and every new home or addition needs a site-specific septic permit and soil evaluation through Collin County – a step that can add weeks to a timeline and that contractors working in sewer-served cities never have to factor in.

The ground underneath matters too. North Texas’ blackland clay shrinks and swells hard with seasonal moisture, which makes foundation design and drainage grading critical on every build and every room addition. The housing stock here is dominated by large-lot single-family custom homes built from the 1990s through the 2010s – a mix of ranch-style and two-story brick and stone houses on one-to-several-acre tracts, with detached shops, barns, and guest quarters common on the newer ones. Hail and high-wind storms push homeowners toward impact-resistant roofing and reinforced garage doors. None of that reads the same as a remodel in Plano or Allen, and we don’t price it that way.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Main Lucas Services

Lucas homeowners call us about two things more than any other: bringing an older custom home up to date, and reworking the spaces inside it that wear out first. Here’s where each one starts.

General Contractor in Lucas

On acreage lots, general contracting is coordination as much as carpentry. When we take on a General Contractor in Lucas project, the scope usually spans the house and the ground around it – a shop build, a guest quarters addition, a structural change that has to tie into a well or septic system that was permitted site-specifically through Collin County. We hold the schedule, pull and track the permits, and keep the trade sequence tight so a septic inspection doesn’t sit idle waiting on framing. Clay soil and drainage grading get sorted before foundations go in, not after. You get one written scope and one point of accountability for the whole job.

General Contractor in Lucas

Kitchen Remodeling in Lucas

Kitchens in Lucas’s 1990s and 2000s custom homes were built generous on square footage but often closed off, with a wall between the cook and the room. A Kitchen Remodeling in Lucas project usually means opening that wall, reworking the layout for how a family actually moves through it, and specifying cabinetry and surfaces that match the house’s scale – KraftMaid or Wellborn boxes, Cambria or Caesarstone tops. Because many of these homes run on well water, we plan the plumbing rough-in and any filtration needs before the first cabinet comes down. That order of operations saves tear-out later.

Kitchen Remodeling in Lucas

Bathroom Remodeling in Lucas

Bathrooms age faster than the rest of a custom home. A Bathroom Remodeling in Lucas job here frequently starts with a tub nobody uses and a shower that’s too small, so tub-to-shower conversions and walk-in showers are common. Frost-free hose bibs and well-fed plumbing mean we check supply pressure and water quality before specifying fixtures – Kohler and Moen trim holds up, but the rough-in behind it has to be right first. Tile work gets waterproofed properly at the substrate, not skimmed over. That’s the difference between a bathroom that looks finished and one that stays that way.

Bathroom Remodeling in Lucas
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 834-0609

Home Remodeling in Lucas

A home office with a built-in desk and shelves

Most of the homes we remodel in Lucas went up between the 1990s and the 2010s, and they were built well but to a different era’s taste – closed floor plans, dated finishes, and mechanical systems sized for a family that’s since changed shape. Add blackland clay that shifts with every wet and dry season, and the work here isn’t cosmetic. It’s structural and layout-level, done with drainage and foundation in mind. If you’re planning a full rework, our home remodeling hub lays out how we scope one.

Whole House Remodel

Signs you need it

You’re gutting more than two rooms at once, the layout no longer fits how the household lives, or the house has sat untouched since it was built and every system from cabinets to trim is due at the same time.

What it costs in Lucas

A whole-house remodel in Lucas typically lands in the $45,000 to $130,000 range for the structural and addition-heavy end, with kitchen and bath work inside that scope running $14,000 to $45,000 and $9,000 to $28,000 respectively depending on finish level.

How we do it

We walk the property and grade the drainage first, write a room-by-room scope with a fixed price, pull the permits, sequence trades so mechanical and rough-in work lands before finishes, and close with a clean site and a signed 365-Day Done Right Promise in your hand.

Home Renovation

Signs you need it

The bones are sound but the surfaces and systems are tired – original cabinets, worn flooring, a kitchen wall that should have come down a decade ago, and a bathroom that’s down to one working shower.

What it costs in Lucas

Renovation-scale work in Lucas runs from about $9,000 for a compact kitchen or small bath up through $45,000 for a full kitchen, with cabinet installation at $4,000 to $13,000 and countertops at $2,000 to $6,500 as the line items that move the total most.

How we do it

We document what stays and what goes, specify materials from our named brand roster so the spec is traceable, protect the rest of the house during tear-out, and stage the work so you keep a working kitchen and bath for as long as possible.

What Home Remodeling Costs in Lucas

Item Typical range in Lucas
Kitchen Remodel $14,000 – $45,000
Bathroom Remodel $9,000 – $28,000
Home Addition $45,000 – $130,000

Will the price change once work starts in Lucas?

No. Bradford gives you a written price before any work begins, and that number doesn’t move at the door. If the scope genuinely changes mid-project – you add a room, you upgrade a finish – we write the change before we build it. No surprise invoices.

Do you pull the permits for a Lucas remodel?

Yes. We pull and track the permits the work requires, and on acreage lots that includes coordinating the site-specific septic permit and soil evaluation Collin County requires for additions. Permits and inspections are part of the written scope, not a line item added later.

Brands We Service in Lucas

We specify and install from a documented roster of name-brand materials – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures, GAF and James Hardie exterior products, Therma-Tru doors, and Belgard hardscaping among them. We don’t stock parts or keep them on a truck, so brand material lead times drive turnaround: expect standard cabinetry and surfaces to add weeks, not days, to the schedule. See the full list on our brands page.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Remodeling Company in Lucas, TX

Every figure below is a typical range for Lucas, not a teaser. Your written price comes after we walk the property.

Service Typical range in Lucas
Kitchen Remodel $14,000 – $45,000
Small Kitchen Remodel $9,000 – $20,000
Cabinet Installation $4,000 – $13,000
Countertop Installation $2,000 – $6,500
Backsplash Installation $800 – $2,500
Kitchen Island Installation $3,000 – $10,000
Bathroom Remodel $9,000 – $28,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Home Addition $45,000 – $130,000
ADU Construction $90,000 – $220,000
Garage Conversion $30,000 – $80,000

What pushes cost up in Lucas is usually structural, not cosmetic: septic and soil evaluation on an addition, drainage grading and foundation work for blackland clay, and long driveway approaches that complicate equipment access. Adding a second story or extending the footprint past a well line can move a project a full tier. Our upfront-price commitment means you get that number in writing before the first permit is filed – no numbers that magically grow once the crew shows up.

Neighborhoods We Serve in Lucas

We work across Lucas and the acreage tracts around it, from the established custom-home streets to the newer builds further out. Because lots are large and spread out, scheduling is the real variable here: a job on a long private drive takes more lead time to stage than one on a short one, and we build that into the calendar rather than discovering it on day one. One response window covers the whole city.

  • Country Club area and established Lucas custom-home streets
  • Acreage tracts off Lucas Road and surrounding county roads
  • Newer large-lot builds with detached shops and guest quarters
  • Ranch-style and two-story brick and stone homes on one-to-several-acre lots

Service Area – Cities Near Lucas

Lucas shares a border with several Collin County communities, and we work them all with the same written-price discipline. Homeowners in Fairview, TX and Murphy, TX call us for the same remodeling work that keeps Lucas busy, and the larger cities nearby – McKinney, TX and Wylie, TX – are part of the same service area. If you’re on the edge of any of them and aren’t sure we cover you, call and ask. We’ll tell you straight.

Serving Lucas, TX – Our Local Coverage Area

We serve Lucas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Remodeling Company in Lucas

Ready to get started? Free estimates in Lucas
Call (844) 834-0609

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local construction pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Lucas Customers Say

★★★★★ 5.0 from 4+ reviews

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

How It Works in Lucas

Getting your construction project started is simple.

1

Call or Request a Free Estimate

Tell us about your construction project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A remodeled hall bathroom with patterned floor tile and painted wallsA small remodeled galley kitchen with cabinets to the ceilingA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodelA finished backyard cottage with a small covered porchA remodeled primary bathroom with a soaking tub and walk-in shower

More remodeling services in Lucas

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Lucas. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch