







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Remodeling Company in Rowlett, TX
Home remodeling in Rowlett is shaped by two things most suburbs don’t have to deal with: a lakeside core full of 1980s houses sitting on clay that moves, and a north side that’s now old enough to need its first real remodel after twenty or thirty years of builder-grade finishes wearing out. We plan every Rowlett job around that reality, which means we look at the slab and the brick veneer before we talk finishes, and we put a written, itemized price in your hands before any work starts. Call (844) 834-0609 for a free estimate.
Why Rowlett Homes Are Different
Rowlett was mostly built out between the 1980s and the 2000s, and the eastern shore of Lake Ray Hubbard gave it a lakefront identity that shaped where the older, smaller houses sit – close to downtown Rowlett and the water – while the newer two-story brick-veneer tract homes dominate the north side.
The ground under the older lakeside blocks in 75088 is expansive Blackland Prairie clay. It swells when it’s wet and shrinks hard when it’s dry, and North Texas hands out both extremes in the same year. That cycle shows up in the brick as stairstep cracks running up the veneer and in door frames that have quietly gone out of square. It’s not a construction defect; it’s the slab moving.
Hail is the other constant. Spring storms routinely total roofs and siding, so storm restoration and foundation work run year-round alongside the kitchen and bathroom remodels. And because Rowlett has been actively redeveloping its downtown and waterfront, permitting along the lake and the Corps of Engineers shoreline carries rules that don’t apply a mile inland.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Main Rowlett Services
Most Rowlett homeowners who call us are weighing one of two projects: a general contracting job that fixes or extends the house, or a kitchen remodel that retires twenty-year-old cabinets and laminate.
General Contractor in Rowlett
A general contractor job here usually starts with a decision about the structure underneath. On older homes near the lake in 75088, we check slab movement and brick cracks before we commit to a room addition or a load-bearing wall change, because moving forward on a shifting slab only multiplies the repair later. North-side homes from the 1990s and 2000s tend to need less foundation work and more scope coordination – additions, garage conversions, roof replacements after hail. We sequence the trades, pull the permits the city requires, and hold the schedule in writing. For the full scope of what we coordinate, see General Contractor in Rowlett.

Kitchen Remodeling in Rowlett
Kitchens in Rowlett’s 1980s and 1990s subdivisions are reaching the end of their first life at the same time: oak cabinets with worn faces, dropped soffits, laminate counters, and a layout that closes off the cook from the room. Our work usually starts with cabinet layout and lighting before anything gets ordered. We build to a documented material list – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures – so the specification is traceable and you’re not guessing what’s going in your kitchen. Plenty of these kitchens also hide a slab crack under the tile, which we flag before demolition. Details are on Kitchen Remodeling in Rowlett.

Bathroom Remodeling in Rowlett
Bathrooms are the smallest jobs with the most that can go wrong, and in Rowlett the two culprits are water and movement. A 1990s tub surround that’s started to flex, a shower pan that’s leaking into the subfloor, or a vanity that’s pulled away from a wall that’s no longer plumb – all of these show up on a regular basis. We open the wall, confirm what’s behind it, and rebuild the substrate properly rather than tiling over a problem. Fixtures come from the Kohler and Moen lines, and the waterproofing gets checked before tile goes up. The full breakdown is on Bathroom Remodeling in Rowlett.

Home Remodeling in Rowlett

Home remodeling in Rowlett splits cleanly along the housing stock. On the older lakeside blocks near downtown and the water, the first question isn’t tile or cabinets – it’s whether the slab has moved, and whether the remedy gets folded into the project. On the north side, where 1990s and 2000s two-story homes dominate, the work is more about retiring builder-grade finishes and reworking layouts that no longer fit how people live. We approach Home Remodeling the same way either way: written scope, written price, and one standard held across every job.
Whole House Remodel
Signs you need it
You’re looking at a house where the kitchen, both bathrooms, flooring, and trim are all at the end of their useful life at once, and piecemeal updates would cost more in the long run than one coordinated project.
What it costs in Rowlett
A whole-house remodel in Rowlett typically lands in the $45,000 – $130,000 range for the structural and finish scope we’d quote as a single project, with the final number set by square footage and how much layout changes.
How we do it
We survey the slab and brick veneer first, document every existing condition, then sequence demolition, rough-in, substrate, and finishes room by room so the house stays livable as long as possible.
Home Renovation
Signs you need it
The layout works but the surfaces don’t – dated cabinets, worn flooring, hollow-core doors, and fixtures that were builder-standard when the house went up in the 1990s or 2000s.
What it costs in Rowlett
Targeted renovation work usually runs from the $9,000 – $20,000 band for a single room up through the $14,000 – $45,000 kitchen range when the scope grows, priced line by line before work starts.
How we do it
We scope by room, lock the material list to documented brands, and run the trades in a written order so nothing gets torn out before its replacement is on site.
What Home Remodeling Costs in Rowlett
| Item | Typical range in Rowlett |
|---|---|
| Home Addition | $45,000 – $130,000 |
| Garage Conversion | $30,000 – $80,000 |
| ADU Construction | $90,000 – $220,000 |
Does a Rowlett remodel need a permit, and who pulls it?
Yes – the City of Rowlett requires permits for structural, electrical, plumbing, and mechanical work, plus separate review for anything near the lake or in the floodplain. We pull the permits, schedule the inspections, and hand you the passed inspection record at close.
Can you remodel a Rowlett house that has foundation movement?
Often, yes – but the foundation gets addressed first. On older lakeside blocks in 75088 we document slab movement and brick cracks before demolition, because finishing a room over a slab that’s still moving wastes the work. Call (844) 834-0609 for a free estimate.
Brands We Service in Rowlett
We work from a documented roster of name-brand materials – GAF and James Hardie on exteriors, Therma-Tru doors, Boral trim, PGT and CGI windows – because manufacturer specifications and warranties back the work we do. No stocked parts on a truck; materials are ordered to your written scope. See our brands for the full list.
See the difference
Before
After
Before
After
Before
AfterPricing for Remodeling Company in Rowlett, TX
| Service | Typical range in Rowlett |
|---|---|
| Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Bathroom Remodel | $9,000 – $28,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Home Addition | $45,000 – $130,000 |
| Garage Conversion | $30,000 – $80,000 |
| ADU Construction | $90,000 – $220,000 |
| Roof Replacement | $8,000 – $20,000 |
| Window Replacement | $4,500 – $15,000 |
| Paver Patio Installation | $3,500 – $11,000 |
What pushes price up in Rowlett is what’s under the surface: slab stabilization on the older clay-soil stock, floodplain and shoreline permitting near the lake, and any layout change that touches structure. Every project gets a written, itemized price before work begins, and that number doesn’t move at the door.
Neighborhoods We Serve in Rowlett
We work across Rowlett’s 75088, 75030, and 75089 ZIP codes, from the older lakeside blocks near downtown Rowlett out to the newer subdivisions on the north side. The clay-soil conditions and permitting realities differ block to block, and we scope each job against what’s actually under that specific house. Wherever you are in Rowlett, we return calls the same way – a live person on the phone, not a queue.
- Downtown Rowlett and the lakeside core (75088)
- Waterview and the Lake Ray Hubbard shoreline
- North Rowlett subdivisions off Liberty Grove
- Dalrock Road corridor neighborhoods
- Southeast Rowlett near the PGBT
Service Area – Cities Near Rowlett
Rowlett sits at the meeting point of Dallas, Rockwall, and Collin counties, and we work the surrounding cities on the same written-scope basis. If you’re just outside Rowlett in Sachse, TX, Garland, TX, Wylie, TX, or Rockwall, TX, the clay-soil and hail considerations are largely the same, and the estimate process is identical.
Serving Rowlett, TX – Our Local Coverage Area
We serve Rowlett and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Remodeling Company in Rowlett
We schedule free estimates at a time that works for you, and a live person answers the phone whenever you call rather than routing you to voicemail. Reach us at (844) 834-0609 to lock in a visit.
We pull the permits the City of Rowlett requires and handle the inspections, including the extra review that applies near the lake and floodplain. If your subdivision has an HOA with material or exterior approvals, we build those into the written scope up front.
All of it – 75088, 75030, and 75089, from the older lakeside blocks near downtown to the newer north-side subdivisions. If you’re unsure whether your address falls inside the area, call (844) 834-0609 and we’ll confirm.
Every Rowlett project we take on gets the same three things: a written price before any work starts, background-checked and uniformed technicians on the job, and the 365-Day Done Right Promise – a full-year written guarantee, so if the work fails inside that window we come back and correct it at no charge. Our technicians have up to 22 years of experience, and we work from a documented roster of premium brands so specifications stay traceable. Call (844) 834-0609 for a free estimate.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local construction pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Rowlett Customers Say
"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."
- Tricia S."Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."
- Cal P.












