







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub to Shower Conversion Cost in McKinney, TX: What You’ll Actually Pay
A tub to shower conversion in McKinney runs $9,000-$28,000, but most standard master-bath conversions land between $6,000 and $11,500 once you account for drain relocation and finish selections. The variable that moves that number more than any other in McKinney is whether your tub drain aligns with a code-compliant shower drain location. Bradford Remodeling Co McKinney puts that answer in writing before demo, not as a change order on day two. For a written price on your specific bath, call (844) 834-0609. A live person answers, every time.

Why McKinney’s 1990s and 2000s Homes Make This a Different Job
Drive through Stonebridge Ranch, Craig Ranch, or Adriatica and you’re looking at 20- to 30-year-old master-planned tract homes built on post-tension slabs. That slab is the whole story of your conversion price.
Here’s what we find in almost every one of those baths. The original tub drain sits at the tub’s foot-end, typically 15 to 18 inches off the back wall. A shower drain centered in the new footprint lands 12 to 24 inches away from that rough-in. On a post-tension slab, you can’t just cut a hole and move it. The slab has tensioned cables in it, and drilling blind is how you turn a $6,000 conversion into a slab repair. That’s why Bradford pulls the slab map and schedules a core-drill as a scoped line item, priced upfront at $800-$2,200 depending on complexity. We’ve seen contractors skip the map and guess. We’ve also seen the bill. The local soil doesn’t help either – Blackland Prairie clay swells and shrinks hard across the North Texas wet-dry cycle, which is why foundation movement is the defining construction specialty around here. It’s also why we verify slab condition before a pan goes down.
Our technicians have up to 22 years of experience, and most of that time has been spent reading exactly these conditions. If you want the fuller picture of how we scope a bath from layout to finish, the Bathroom Remodeling page covers it.
What to Look for in a Tub-to-Shower Quote (and What Most Leave Out)
A conversion quote should read like a scope, not a wish. Here’s the comparison that matters when you’re holding bids side by side.
- Is the slab work priced, or hiding? If the quote doesn’t mention a slab map or core-drill for a center drain, it’s either not moving the drain or it will bill you later.
- Are all three walls specced for backer board and waterproof membrane to full shower height? A standard alcove tub sits in a 60-inch rough opening. A curbless shower in that same space needs a properly sloped pre-slope under the mortar bed plus full-height waterproofing. Skipping the pre-slope is the number one reason pans leak.
- Was the framing checked for moisture? McKinney’s hard-water supply means original framing behind old surrounds is often soft. That should be a scope line in the contract, not a surprise.
- Is the permit included? Drain relocation triggers a plumbing permit in most McKinney jurisdictions. Unpermitted drain work is a material disclosure item at resale – a real problem when you go to sell.
Bradford writes the price once, before any tool comes out. That’s The Garrison Standard: every price and every guarantee in writing, no numbers that move at the door. We work from a documented roster of name-brand materials – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures – so your specifications are traceable and the quality isn’t left to guesswork. Where framing needs rebuilding to accept a curbless pan, that’s a written line item you approve before we demo. For the full range of what a bath remodel can look like, see Bathroom Remodeling in McKinney.

What Does a Tub to Shower Conversion Cost in McKinney? Line by Line
Every conversion breaks into the same working parts. Here’s the realistic breakdown for a standard McKinney master-bath conversion. These are real dollar ranges, not a “call for pricing” hedge.
| Line Item | Typical Range |
|---|---|
| Demolition and slab/drain work (including core-drill and map) | $1,200-$2,800 |
| Mortar bed and waterproofing membrane | $600-$900 |
| Tile labor and materials | $1,800-$3,500 |
| Frameless glass enclosure | $1,400-$2,600 |
| Kohler or Moen fixtures | $400-$900 |
| Total range | $6,000-$11,500 |
Add drain relocation complexity, premium tile, or a full backer rebuild, and you climb toward the broader $9,000-$28,000 McKinney bathroom remodel range. Either way, the number you sign is the number you pay. Bradford includes the Collin County building permit where required, and it’s in the written price – not added after. If you want to keep your existing tub and add a separate shower, a walk-in shower installation is often the cleaner route.
Does the 365-Day Done Right Promise Cover a Conversion?
Yes, and specifically on the two things that go wrong most in shower conversions: pan waterproofing integrity and grout joint failure. Every completed Bradford project carries a full-year written guarantee. If either of those fails inside that window, we come back and correct it at no charge. No argument, no invoice. A signed written guarantee goes in your hand at job close, along with a clean site and documented scope. The crew that walks through your door is background-checked and uniformed, identities and conduct standards set at the Garrison Partners level. Live-person phone coverage runs 24/7 – no voicemail, no callback queue standing between you and a real answer.
We’re part of the Garrison Partners family, and every location is independently owned and operated under that same written standard. Around downtown McKinney’s historic square, exterior work needs design review through the preservation district – we plan that early when a bath build touches exterior walls or venting. If your project spans beyond the bath, our kitchen remodeling and home addition teams run the same playbook.
FAQs
Most McKinney tub to shower conversions run $6,000-$11,500 for a standard master bath, and $9,000-$28,000 for larger or more complex projects. Drain relocation on a post-tension slab is the biggest variable. Call (844) 834-0609 for an exact written quote – estimates are free.
No. A proper conversion with slab work, waterproofing cure time, and tile setting takes multiple days, and rushing the pre-slope or membrane is how pans fail. Bradford will give you a realistic schedule in writing before work starts. Call (844) 834-0609 to talk through timing.
Replacing a tub is usually cheaper upfront, but a conversion adds resale value and eliminates the tub-to-shower step risk many McKinney homeowners are already thinking about. We’ll show both numbers side by side. Call (844) 834-0609 for the comparison.
Often yes – specifically when the drain is relocated, which triggers a plumbing permit in most McKinney jurisdictions. Bradford includes the permit in the written price where required. Call (844) 834-0609 and we’ll tell you exactly what your project needs.
Get Your Written Price Before Anyone Swings a Hammer
The best time to find out what your conversion costs is before demo day, not after. Bradford Remodeling Co McKinney gives you a written price, a real guarantee, and a crew you can name before they arrive. Call (844) 834-0609 for a free estimate – we answer live, 24/7.
Written by the team at Bradford Remodeling Co McKinney, serving McKinney, TX.
What Our Customers Say
"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."
- Tricia S."Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."
- Cal P.












