A Bradford company - serving McKinney, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Cabinet Installation & Refacing in McKinney, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
New painted shaker cabinets with an organized deep drawer
A small remodeled galley kitchen with cabinets to the ceiling
A walk-in pantry with wood shelving
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
An open living space after a whole-home remodel
A finished backyard cottage with a small covered porch
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Cabinet Installation & Refacing in McKinney, TX

Cabinet installation and refacing in McKinney typically runs $4,200 to $9,500 for a standard 10-by-10 kitchen, with full new cabinet installation at the higher end and refacing (new doors, drawer fronts, and veneer over sound existing boxes) at the lower. Refacing keeps your current cabinet layout and boxes; installation replaces them outright. The choice usually comes down to whether your boxes are still square and solid or whether the layout itself is the problem you’re trying to solve.

We do both, and we tell you plainly which one your kitchen actually needs. If you’re planning a broader change to the room, start with our Kitchen Remodeling in McKinney page for the full scope; cabinets are one piece of a larger job and we’ll show you how the pieces fit. Call (844) 834-0609 and a live person picks up, day or night, to set up a free estimate.

What separates a squared-away cabinet job from a bad one isn’t the door style. It’s whether the boxes are plumb before the first screw goes in, whether the layout was measured against your actual appliances, and whether the person who quoted you shows up on install day. We put the price in writing before any work starts, and every completed project carries the 365-Day Done Right Promise: if the work fails inside a full year, we come back and correct it at no charge. Our technicians have up to 22 years of experience, and they’re background-checked and uniformed, so you know who’s in your home before the crew arrives.

Installers leveling a new base cabinet during a kitchen remodel

When You Need Cabinet Installation & Refacing

  • Your doors are hanging crooked or the boxes are pulling from the wall. In older McKinney homes, especially the 1990s and early-2000s builds around the historic square and along Virginia Parkway, we regularly see particleboard boxes that have swelled from years of humidity swings and no longer hold a hinge screw.
  • The layout fights you every day. A corner cabinet that blocks the dishwasher door, a pantry too shallow for a sheet pan, a peninsula that leaves no walkway between it and the fridge. If the boxes are fine but the arrangement isn’t, that’s a layout problem, and refacing won’t fix it. New installation will.
  • The finish is failing, not the cabinet. If the boxes are solid and square but the doors are dated, chipped, or a color you’ve outgrown, refacing gets you new doors and drawer fronts for roughly half to two-thirds the cost of tearing everything out.
  • You’re replacing appliances and the openings don’t fit. A new 36-inch range or a counter-depth refrigerator rarely drops into a 20-year-old opening. Cabinet work has to happen for the new appliance to sit right, and we measure against the actual unit before ordering.
  • Water damage under the sink or behind the dishwasher. A slow leak rots the cabinet base before you notice it. When we pull the doors, we check the substrate (the box material under the finish) and tell you whether it’s salvageable or has to go.
  • You’re selling or refreshing before a move. Refacing is the faster path when the goal is a clean, current kitchen without a four-week tear-out, and the written price and one-year guarantee carry over to the next owner’s peace of mind.

Our Cabinet Installation & Refacing Process

  1. On-site measure and layout review. We measure the actual room, not the drawing, and check the walls for plumb and the floor for level. In McKinney’s clay soils, slab movement shows up in cabinet runs, and a box set against an out-of-square wall has to be shimmed and scribed, not forced. You get a written price before any work starts.
  2. Material selection from a documented roster. We work with KraftMaid and Wellborn cabinetry, so every door, box, and finish has a manufacturer spec and warranty behind it. You pick the door style and finish; we confirm the exact model numbers on the quote so nothing gets swapped at the job site.
  3. Demo and substrate check. Old cabinets come out, and we inspect what’s behind them: the wall, the plumbing rough-in, the electrical. If a valve or an outlet needs to move for the new layout, that gets flagged and priced before we continue, not billed as a surprise later.
  4. Installation and leveling. New boxes go in plumb and level, screwed into studs, with the appliance openings sized to the units you actually bought. Refacing skips the tear-out: we level and repair the existing boxes, then apply new veneer, doors, and drawer fronts with matching hardware.
  5. Countertop, sink, and finish. If counters and a sink are part of the job, we sequence them so the cabinet run is final before the template. Cambria and Caesarstone surfaces get templated after the boxes are set, not before, which is the mistake that leaves a counter out of square with the cabinets.
  6. Clean close and written guarantee. Site swept, debris hauled, scope checked line by line, and a signed 365-Day Done Right Promise in your hand before we leave. If anything on that list doesn’t hold within the year, we return and correct it at no charge.
A second-story addition that matches the existing roofline

Cabinet Installation & Refacing Pricing in McKinney

Here’s what cabinet work actually runs in the McKinney market. These are ranges, and the written quote you get is the number that counts.

Scope Typical range What drives the number
Refacing (doors, drawer fronts, veneer over existing boxes) $4,200 – $6,800 Linear feet of cabinets, door style, hardware, whether boxes need repair
Full cabinet installation, stock or semi-custom $6,500 – $9,500 Box count, layout changes, plumbing/electrical relocation, appliance openings
Layout change (moving a sink, adding an island or pantry) Add $1,500 – $4,000 Rough-in work, new substrate, countertop re-template
Countertop replacement alongside cabinets $2,800 – $6,500 Material (Cambria and Caesarstone run higher than entry-level quartz), square footage, edge profile

Three things move the price most: the number of boxes, whether the layout changes, and the finish you choose. A reface with the same footprint and new hardware sits at the low end. A gut-and-reinstall that moves the sink and adds an island sits at the high end, and honestly, sometimes above it.

We don’t do “call for a quote” pricing. You get a written price before any work starts, it doesn’t move at the door, and the estimate is free. If a job needs something the initial walk-through didn’t catch, we tell you before we touch it and you decide. Call (844) 834-0609 for your free estimate.

FAQs – Cabinet Installation & Refacing

Is it cheaper to reface or replace my cabinets in McKinney?

Refacing is cheaper when your existing boxes are solid and your layout already works. Refacing in McKinney typically runs $4,200 to $6,800, while full installation runs $6,500 to $9,500, so the savings are real when the reface is appropriate. If the boxes are swollen, water-damaged, or the layout is the actual problem, refacing just puts new doors on a bad foundation, and we’ll tell you that straight. Call (844) 834-0609 for an exact quote, and the estimate is free.

How long does cabinet installation take?

A standard reface is usually two to four days on site, and a full installation of a typical McKinney kitchen runs about one to two weeks, plus countertop templating and installation if that’s part of the job. The timeline depends on box count, whether the layout changes, and material lead times on KraftMaid or Wellborn orders. We give you the schedule in writing up front so you know what to plan around.

Do you handle the countertops and sink too?

Yes. We sequence cabinets and counters together so the template happens after the boxes are final, which is the only way a quartz top lines up square with the cabinet run. Cambria and Caesarstone surfaces are part of our documented material roster, along with Kohler and Moen fixtures. If you’re putting in a new sink or faucet, we build that into the same written price.

What does the 365-Day Done Right Promise cover on a cabinet job?

It covers the work: if a door comes out of alignment, a drawer front fails, a hinge pulls, or any part of the install doesn’t hold within a full year of completion, we return and correct it at no charge. The manufacturer warranty on the cabinets themselves is separate and comes with the product. Between the two, your cabinets are covered from install day forward, and the signed guarantee is in your hand when we close the job.

Can you come today?

Estimates are usually scheduled within a few days, and we answer the phone around the clock to get you on the calendar. A live person picks up at (844) 834-0609, not a voicemail or a callback queue, and the estimate itself is free with the price in writing before any work starts.

If you want cabinets that are set plumb, priced in writing, and backed by a one-year guarantee you can hold in your hand, we’re ready. Bradford Remodeling Co McKinney runs on The Garrison Standard: a written price before any work starts, background-checked and uniformed technicians on every job, and the 365-Day Done Right Promise on every completed project. Our technicians have up to 22 years of experience and work with KraftMaid, Wellborn, Cambria, Kohler, and other documented brands so specs are traceable and quality isn’t left to guesswork. Whether you’re refacing a solid set of boxes or tearing out a layout that’s fought you for years, the first step is a free estimate and a straight number. Call (844) 834-0609 and a live person will pick up today.

Written by the team at Bradford Remodeling Co McKinney, serving McKinney.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in McKinney? Licensed & insured · free written estimates
Call (844) 834-0609
Local Service Coverage

Request a Free Estimate in McKinney

Tell us what you need - Bradford Remodeling Co McKinney responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch