A Bradford company - serving McKinney, TX
A remodeled home with a front porch on a quiet street at golden hour
Fate, TX

Remodeling Company in Fate - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one accountable point of contact. Permits handled, and the local pro we connect you with is licensed and insured.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A remodeled family room with new windows and a window seat
A remodeled primary suite with built-in wardrobes and a window seat
A remodeled staircase with wood treads and a slim metal railing
A finished basement family room with a media wall and wet bar
A remodeled laundry and mudroom with a bench, cubbies and painted cabinets
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A finished backyard cottage with a small covered porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Remodeling Company in Fate, TX

Home remodeling in Fate, TX, is a different job than remodeling older suburbs. Most houses here went up in the 2000s and 2020s, so the work we do is less about patching worn-out rooms and more about upgrading builder-grade finishes, adding space, and fixing the things that first-generation construction skipped. Fate is one of the fastest-growing small towns in North Texas, and the housing stock shows it. Call (844) 834-0609 for a free written estimate before any work starts.

Call (844) 834-0609

Why Fate Homes Are Different

Fate sits on the Blackland Prairie, and the expansive clay soil under it shrinks and swells hard through Texas’s wet-dry cycles. That movement shows up in new slabs and foundations, which changes how we approach structural work and anything tied to a floor that may have shifted. Summer heat and the occasional hard freeze set the schedule for concrete pours, roofing, and exterior trim, so we plan around the calendar rather than fight it.

Because so much of Fate was built out within the last two decades, a lot of homes are now hitting the 15-to-20-year window where original builder-grade HVAC, roofing, and exterior trim fail around the same time. Subdivisions built in different phases often have inconsistent details from one street to the next, so we measure and verify instead of assuming the house next door is built the same way. That habit saves surprises once walls are open. Get a written price first; that’s the Garrison Standard.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Main Fate Services

Two jobs come up more than anything else for Fate homeowners: general contracting for additions and structural work, and kitchen remodeling in homes that are ready to move past builder-grade finishes.

General Contractor in Fate

General contracting in Fate is mostly additions, structural fixes, and coordinating trades on new single-family construction and the trim-out work that follows. The clay soil here means we verify foundation and framing before we build on top of anything, and the volume of active builds means scheduling subs takes planning. One crew, one point of contact, one written scope. For permits, sequencing, and inspections handled by one accountable contractor, see our General Contractor in Fate page.

General Contractor in Fate

Kitchen Remodeling in Fate

Kitchens in Fate tend to be recent enough that the cabinets and layout are sound, but the finishes are builder-grade and the lighting is thin. A remodel here is usually a cabinet, countertop, and island upgrade rather than a full gut, and we confirm substrate and wall condition first because clay movement can throw a cabinet run out of level. Specification runs on documented brands like KraftMaid and Wellborn cabinetry and Cambria surfaces. Full details on our Kitchen Remodeling in Fate page.

Kitchen Remodeling in Fate

Bathroom Remodeling in Fate

Bathroom work in Fate often starts with a home that has a functional but dated tub-and-tile setup from its original build. We handle walk-in showers, tub-to-shower conversions, and vanity upgrades, and we check the waterproofing and rough-in before tile goes up, since a fast-built subdivision bathroom can hide details worth correcting. Premium fixtures from Kohler and Moen are part of the documented spec. See our Bathroom Remodeling in Fate page for scope and pricing.

Bathroom Remodeling in Fate
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 834-0609

Home Remodeling in Fate

A dining nook with a built-in banquette

Home remodeling in Fate solves a specific problem: houses built in the last two decades that are structurally fine but still wearing their original builder-grade finishes, fixtures, and trim. Add the clay soil moving under slabs and the simultaneous failure of roofs, HVAC, and exterior trim at the 15-to-20-year mark, and most Fate remodels are about upgrading thoughtfully while correcting what the first build left undone. We put every scope in writing through our Home Remodeling work, so the price you agree to is the price you get.

Home Renovation

Signs you need it

You’re looking at a room or a whole floor where the original builder finishes are tired, the trim is failing, and the layout no longer fits how you live in the house.

What it costs in Fate

A focused home renovation typically runs $14,000 – $45,000 for a primary room or a collection of rooms, and a broader whole-home remodel scales from there based on scope.

How we do it

We walk the space, confirm substrate and framing condition, write a line-item scope and price, then demo, rough-in, finish, and close clean with a signed guarantee in your hand.

Whole House Remodel

Signs you need it

The 15-to-20-year failures are stacking up at once – roof, exterior trim, and interior finishes all showing their age – and you’d rather fix it all in one coordinated pass.

What it costs in Fate

Whole-home remodels and additions run $45,000 – $130,000, and luxury-level whole-home work reaches into the $90,000 – $220,000 range when ADU or full reconfiguration is included.

How we do it

We sequence trades around the calendar and the wet-dry cycle, verify foundation and framing first on clay-soil lots, then execute to a written scope with the same crew accountability from demo to close.

What Home Remodeling Costs in Fate

Item Typical range in Fate
Home remodeling (primary rooms) $14,000 – $45,000
Home addition $45,000 – $130,000
ADU construction $90,000 – $220,000

Do you pull the permits for a Fate remodel?

Yes. We pull permits and schedule inspections as part of the scope, and we account for HOA architectural review where your subdivision requires it. That’s confirmed in writing before work starts, not after.

Will the price change once work starts on my Fate home?

No. You get a written price before any work begins, and it doesn’t move at the door. If we open a wall and find something the scope didn’t cover, we stop and quote the change in writing before proceeding.

Brands We Service in Fate

Our remodeling specifications run on documented name-brand materials – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures, GAF and James Hardie exterior products, Therma-Tru doors, and Belgard hardscaping – and we also work with Quikrete and Sakrete for concrete and masonry. Specifications are traceable, and requests for those brands move quickly. See our brands.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Remodeling Company in Fate, TX

Service Typical range in Fate
Kitchen remodel $14,000 – $45,000
Small kitchen remodel $9,000 – $20,000
Cabinet installation $4,000 – $13,000
Countertop installation $2,000 – $6,500
Bathroom remodel $9,000 – $28,000
Walk-in shower installation $4,500 – $12,000
Home addition $45,000 – $130,000
ADU construction $90,000 – $220,000
Garage conversion $30,000 – $80,000

What pushes price up in Fate is foundation and slab correction on clay soil, foundation-verify work before an addition, and the premium finishes that replace builder-grade materials. Every number above is a range; your written price is fixed before work starts and doesn’t move.

Neighborhoods We Serve in Fate

We work across Fate’s subdivisions and the older streets near the original town center, and our crews are generally in the area most weekdays, so scheduling a free estimate is straightforward. Response times are consistent across the ZIP 75132 corridor. If you’re not sure whether your street falls inside our service area, call and we’ll confirm.

  • Subdivisions along the FM 552 corridor
  • Newer phases near downtown Fate
  • Older ranch homes near the original town center
  • Estates along the western edge of Fate

Service Area – Cities Near Fate

Fate sits in Rockwall County, and our independent local professionals also take on remodeling work in the nearby communities. If you’re just outside Fate, we can usually confirm coverage quickly. We also serve Royse City, TX, Rockwall, TX, Heath, TX, and Wylie, TX. Call with your address and we’ll tell you straight whether we can take the job.

Serving Fate, TX – Our Local Coverage Area

We serve Fate and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Remodeling Company in Fate

Ready to get started? Free estimates in Fate
Call (844) 834-0609

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local construction pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Fate Customers Say

★★★★★ 5.0 from 4+ reviews

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

How It Works in Fate

Getting your construction project started is simple.

1

Call or Request a Free Estimate

Tell us about your construction project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A wide opening with a new beam where the kitchen wall was removedA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with patterned floor tile and painted wallsA small remodeled galley kitchen with cabinets to the ceilingA low-threshold walk-in shower with a bench and grab barA walk-in pantry with wood shelving

More remodeling services in Fate

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Fate. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch