A Bradford company - serving McKinney, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Murphy, TX

Bathroom Remodeling in Murphy - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Permits handled, and the local pro we connect you with is licensed and insured.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
A low-threshold walk-in shower with a bench and grab bar
A powder room with botanical wallpaper and a stone sink
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A walk-in pantry with wood shelving
A remodeled laundry and mudroom with a bench, cubbies and painted cabinets
A built-in window seat in a bay window
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across Murphy

Bathroom remodeling in Murphy is renovation work, not new construction. The town is nearly built out, so nearly every project here means opening walls inside a house people are still living in. We plan for that: protected driveways, staged materials, tight scheduling, and a written scope before anything gets torn out. Our crews know the 1990s – early 2000s brick homes around the 75094 ZIP, the Clay soils under them, and what usually goes wrong behind a tub wall. Call (844) 834-0609 for a free written estimate.

Call (844) 834-0609

Why Bradford Remodeling Co McKinney Is Murphy’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

Murphy homeowners have mostly been through a bad remodel once already – the no-show week, the invoice that moved after the porch handshake, the crew that left a dumpster in the driveway for a month. We’re built against that. Bradford Remodeling operates under The Garrison Standard, which means every price is written and signed off before a single tool comes out, and every finished bathroom carries the 365-Day Done Right Promise: if the work fails inside that year, we come back and correct it at no charge.

Our technicians have up to 22 years of experience, they’re background-checked and uniformed, and a live person answers the phone 24/7 – not a queue, not a voicemail. We work from a documented roster of name-brand materials so what goes into your shower is traceable, not guessed at. If you live off Murphy Road near the high school or over by Maxwell Creek, you’ve likely seen a crew working a driveway with a plywood mat down. That’s how occupied-home remodels in Murphy should run. Call (844) 834-0609 to schedule your free estimate.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Tub to Shower Conversion in Murphy

A Tub to Shower Conversion in Murphy usually makes sense when the original garden tub has become a step-over hazard or a dust collector in a home you plan to stay in. The job runs $3,500 – $10,000 here, and most of the cost sits in the drain and valve rough-in, waterproofing, tile, and glass – not the tub you’re removing. Because so much of Murphy’s housing is wood-frame with plumbing buried in the original 1990s layouts, the conversion starts with opening the wall and confirming what’s behind it.

What the Conversion Actually Involves

A conversion means pulling the tub, reworking the drain to a shower configuration, setting a sloped pan, and waterproofing the walls before any tile goes up. The old tub cavity often hides soft subfloor near the drain, which gets replaced with cement board and a proper pan liner. Inspections are scheduled before the walls close so the rough-in plumbing and electrical are signed off while they’re still visible.

Permits and Inspection Sign-Off

Moving a drain or adding a shower valve is plumbing work that requires a permit and inspection in Murphy, even when the bathroom sits on an interior wall. Skipping that step feels faster and costs far more later, because a compliant conversion has paper behind it. A written quote should name the permit pull, the pan build, and the inspection sequence in the scope.

One Day Bath Remodel in Murphy

A remodeled family room with new windows and a window seat

A One Day Bath Remodel in Murphy is a fit for the smaller hall baths and guest baths in the 1990s brick homes off FM 544, where you want new surfaces, fixtures, and vanity without a full tear-out. These typically run $5,000 – $12,000 in Murphy, and they’re not a gut remodel – they’re a scheduled, sequenced swap of the visible layer: tub or shower surround, tile, fixtures, and vanity. The one-day label only holds when the substrate underneath is sound and the rough-in is already where it needs to be.

Where One-Day Remodels Work Best

A one-day bath gets tight when a walk-in shower surround, a vanity, and new fixtures are all on the same schedule and the existing drain is already correct. It’s the fastest path to a clean, modern bathroom when nothing is hiding behind the drywall. When soft subfloor or a mismatched drain turns up after demo, the scope changes – which is exactly why it’s written down first.

What Changes the Timeline

Hidden rot near the tub, a failed pan liner, or a shower drain that doesn’t line up with modern valve spacing will push the job past a day. A written scope with allowances for tile and fixtures, a draw schedule tied to milestones, and a punch list keeps that from turning into a surprise. Call (844) 834-0609 to schedule your free estimate.

Trusted Brands We Service in Murphy

We install premium, documented brands so the spec on your bathroom isn’t a guess: KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, and Kohler and Moen fixtures, among others on our approved list. We don’t stock parts – each project is ordered to spec, which is why the written price stays fixed and the material is traceable to a manufacturer warranty. Fast turnaround on bathroom work comes from disciplined scheduling, not from a stocked truck. When you hear “compliance” on this page, it’s the same discipline applied to permits, inspections, and product documentation. If you’re comparing brands or specifying a fixture, our Bathroom Remodeling team can walk you through what fits your Murphy bathroom.

Common Bathroom Remodeling Problems We See in Murphy Homes

  • Soft subfloor near the tub. Slow leaks behind a tub surround in a 1990s Murphy home often rot the subfloor before anyone sees a stain. The fix is new cement board and a proper pan – found during demo, before the price is finalized.
  • Permits skipped on interior walls. A bathroom on an interior wall still needs a permit for the plumbing and electrical rough-in. When the walls close before inspection, sign-off fails and the tile has to come back off.
  • Low-bid quotes with no allowances. A quote that excludes subfloor repair or fixture allowances looks cheaper until the change order lands. Once hidden rot shows up, the savings disappear.
  • Ventilation left as-is. The original 1990s exhaust fan often can’t clear steam from a larger shower, so moisture migrates into the adjacent bedroom wall cavity. Upgrading the vent is part of a compliant scope.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Bathroom Remodeling in Murphy, TX

A full bathroom remodel in Murphy typically runs $9,000 – $28,000, and the line items below show where the money lands. The range holds when the subfloor and rough-in are sound; hidden rot and added fixture allowances move it. We give you that written price before work starts, free, with no numbers that shift at the door. Here’s the honest Murphy breakdown:

Scope Murphy Price Range
Bathroom Remodel (full) $9,000 – $28,000
Tub-to-Shower Conversion $3,500 – $10,000
Walk-In Shower Installation $4,500 – $12,000
Shower Replacement $3,000 – $8,500
Bathroom Vanity Installation $800 – $3,000

A compliant quote names the permit pull, the subfloor spec, the waterproofing method, and the fixture allowances. A cheap one leaves those out and makes them change orders. Call (844) 834-0609 for an exact quote – estimates are free.

We Also Serve Cities Near Murphy

We work the same occupied-home remodels across the towns around us, so we understand the shared logistics: Sachse, Wylie, Fairview, and Lucas sit close enough that a crew in one soon knows the others. The conditions are similar – built-out neighborhoods, 1990s and 2000s homes, tight driveways. If you’re comparing options in Murphy or nearby, call (844) 834-0609.

Serving Murphy, TX – Our Local Coverage Area

We serve Murphy and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Bathroom Remodeling in Murphy

Get Your Murphy Bathroom Priced

A wide opening with a new beam where the kitchen wall was removed

Give us a call at (844) 834-0609 for a free written estimate on bathroom remodeling in Murphy. We’ll walk the bathroom, spell out the scope, name the permit and inspection steps, and hand you a fixed price before any work starts. Every finished project carries the 365-Day Done Right Promise. Estimates are free, and a live person answers the phone 24/7.

Written by the team at Bradford Remodeling Co McKinney.

Why Murphy Chooses Bradford Remodeling Co McKinney

We set the standard for bathroom remodeling in Murphy.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Murphy

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Murphy Customers Say

Trusted by homeowners across Murphy and surrounding areas.

★★★★★

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

Alan M.
★★★★★

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

Tricia S.
★★★★★

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

Cal P.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A remodeled primary suite with built-in wardrobes and a window seatA garage converted into a guest room and home officeNew painted shaker cabinets with an organized deep drawerA remodeled staircase with wood treads and a slim metal railingA small remodeled galley kitchen with cabinets to the ceilingA finished basement family room with a media wall and wet bar

More remodeling services in Murphy

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Murphy?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Murphy.

(844) 834-0609

Request a Free Estimate in Murphy

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch