







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Sachse
If you live in Sachse, you already know this town runs on two speeds. One side is brick tract homes on snug suburban lots; the other is acreage property where the driveway is long, unpaved, and holds water after a storm. A bathroom remodel here has to respect both. We scope every Sachse job around the real site conditions first: clay soil, drainage, septic setbacks, and county permitting where the parcel sits outside city limits. That’s how a remodel gets squared away instead of nickel-and-diming you mid-project. Call (844) 834-0609 and we’ll get you a written price before any work starts.
Why Bradford Remodeling Co McKinney Is Sachse’s Preferred Bathroom Remodeling Company

Homeowners in Sachse and the wider 75048 area call us because they’ve already been through a contractor who gave a rough number at the door, then let it climb once demolition opened up the floor. Bradford Remodeling operates under The Garrison Standard, which means the price you see is written down before the first tool comes out. No change orders that show up as a surprise. No allowances that quietly balloon.
Every completed bathroom remodel carries the 365-Day Done Right Promise: a full-year written guarantee. If the work fails inside that window – a leak at the shower pan, a vanity that pulls loose, a tile field that cracks – we come back and correct it at no charge. It’s all in writing, in your hand at job close.
A live person answers our phone around the clock, not a voicemail box or a callback queue. Crews are background-checked and uniformed, so you know who’s walking through your door before they arrive. Our technicians have up to 22 years of experience, and that know-how gets put to work the moment we walk a Sachse property.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Bathroom Remodeling Contractor in Sachse
Choosing a Bathroom Remodeling Contractor in Sachse means finding someone who understands that half the parcels in this town sit close to the Collin/Dallas county line and can fall under county rules rather than city rules. A full bathroom remodel here usually involves a tear-out to the studs or slab: pulling old tile and substrate, checking the subfloor for movement, rerouting the rough-in for a new shower valve, and rebuilding with proper waterproofing. A typical full bathroom remodel in Sachse runs $9,000 – $28,000, and a small bathroom remodel runs $5,000 – $12,000. You’ll want this when a 1990s-era bathroom is failing around the edges, when water intrusion has softened the subfloor, or when a 1970s ranch bath hasn’t been touched since it was built.
What a full tear-out covers
Demo down to framing and slab, new cement board and a rolled-on waterproof membrane in the wet zone, then back up with tile, fixtures, and a sealed finish. A written scope lines out every line before we start. Bathroom Remodeling from our team follows the same disciplined process on every Sachse job.
Small-bath updates and tight footprints
A hall bath or half bath under 50 square feet still needs a real rough-in and proper drying time, so the schedule runs similarly even when the budget is tighter. We work with vanities, tile, and fixtures from a documented roster of premium brands so the specifications hold up.
Walk In Shower in Sachse

A Walk In Shower in Sachse is often the first upgrade homeowners ask about once they’re past the tub-and-curtain years. It means a curbless or low-curb entry, a Schluter-type waterproofing system, a properly sloped pan, and either a tiled or solid-surface surround. A walk-in shower installation in Sachse runs $4,500 – $12,000, while a tub-to-shower conversion runs $3,500 – $10,000 and a shower replacement runs $3,000 – $8,500. You’ll want one when the existing tub is unused, when an older family member needs safer footing, or when you’re reclaiming floor space in a small bath.
Drainage and the shower pan
On Sachse’s black clay, slab movement near the wet wall is real. We check the shower pan drainage and the slab beneath it before we set tile, because a pan that drains against a shifting slab will fail. That’s part of the pre-work scope, not a change order later.
Frameless glass enclosures
A frameless glass shower enclosure needs a properly plumb wall and square opening to fit right. We brace and shim the framing during rough-in so the glass sits clean with no gaps or slams. Frameless glass typically adds to the shower installation number above based on size and glass type.
Trusted Brands We Service in Sachse
Every bathroom remodel we scope draws from a documented brand roster: KraftMaid and Wellborn cabinetry for vanity builds, Cambria and Caesarstone surfaces, Kohler and Moen fixtures, and Tile and fixtures as specified. We don’t keep parts on hand – no warehouse, no stockroom – but we specify builder-grade and premium brands like Boral for exterior touches where a shower vent or window needs it, and PGT or CGI for impact-rated glazing if a bathroom window opens to a windward side. Fast turnaround comes from good ordering and scheduling, not from stored inventory. Manufacturers’ warranties back our 365-Day Done Right Promise, so every specification is traceable.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Sachse Homes
- Slab movement traced to ponding water. On the east side of Sachse, long un-drained acreage driveways push water against the foundation after heavy rain, and the black clay swells and shrinks. We check grading and drainage before interior work on those parcels, or the shower pan and tile field fail again within a season.
- Skipped drainage assessment before the remodel. Homeowners often learn this the hard way when a new tile floor cracks a few months in. Scoping the drainage first, even when it adds a line item, prevents the recurring slab movement that tears a bathroom apart.
- Allowances that don’t cover the haul. On properties with long, unpaved driveways, material deliveries and spoils hauling cost more, and a contractor who priced a generic allowance will hit you with an overrun. We scope haul and access before quoting.
- County permits and septic setbacks. In the unincorporated-feeling pockets, converting a bath or adding a walk-in shower that shifts plumbing near a septic field or well requires county sign-off. We handle that paperwork up front so the inspection passes.
Pricing for Bathroom Remodeling in Sachse, TX
Bathroom remodeling in Sachse runs $9,000 – $28,000 for a full remodel, and pricing holds steady because we write it down before work starts. The biggest cost drivers here are site access, hauling over long unpaved driveways, drainage work on acreage lots, and whether county permits are required. A tight-footprint hall bath costs less than a primary bath with a walk-in shower and a custom vanity, and drainage corrections on clay soil add to the scope on the east side. We give you a written line-item estimate, free, so the number doesn’t shift at the door.
| Scope | Typical Sachse Range |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
Call (844) 834-0609 for a free written estimate.
We Also Serve Cities Near Sachse
Our Sachse coverage reaches the surrounding northeastern-metro towns: Murphy, Rowlett, Garland, and Wylie. If you’re in one of these neighboring cities and searching for Bathroom Remodeling in Sachse or your own town, we can walk your property and give you a written price. Call (844) 834-0609 to schedule.
Serving Sachse, TX – Our Local Coverage Area
We serve Sachse and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Sachse
Often yes. Sachse straddles the Collin/Dallas county line and sits near the Dallas/Rockwall line, so parcels outside city limits can require county sign-off, especially when plumbing shifts near a septic field or well. We pull the right permits and handle the inspection so the job closes clean. Call (844) 834-0609 and we’ll confirm what your parcel needs.
Expansive vertisol clay swells and shrinks with wet-dry cycles, driving slab movement that can crack tile and warp a shower pan. On the east side, pre-remodel grading and drainage corrections add to the scope and the price. Budgeting for a drainage assessment up front saves you a re-do later. Call for an exact quote – estimates are free.
Usually yes, but setbacks matter. If the shower plumbing runs near a septic field or well, county code may require sign-off or a re-route before the rough-in goes in. We scope the plumbing path and permit requirements before ordering fixtures. Call (844) 834-0609 to schedule a walk-through.
A full bathroom remodel runs $9,000 – $28,000 in Sachse, and a small bathroom remodel runs $5,000 – $12,000. Access, hauling, drainage, and permit needs move the number. Call (844) 834-0609 for a written line-item quote – the estimate is free.
We scope haul and access before quoting. Long unpaved driveways on Sachse acreage mean materials come in by smaller trucks or at a staging point, and spoils go out the same way. That cost gets written into the estimate, not added later. Call (844) 834-0609 to schedule your free estimate.
If you’re ready to price your bathroom remodel, call (844) 834-0609 today. We’ll walk your Sachse property, check the drainage and permit picture, and hand you a written price before any work starts. The estimate is free, the number is fixed in writing, and every job carries the 365-Day Done Right Promise.
Written by the team at Bradford Remodeling.











