







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterGeneral Contractor vs Handyman in McKinney, TX: Which One Do You Actually Need?
Choose a handyman for cosmetic fixes that need no permit, and choose a licensed general contractor for anything that touches your slab, your plumbing rough-in, your electrical panel, or your roofline. That’s the honest bottom line for general contractor vs handyman. In McKinney, the dividing line is sharper than most homeowners realize, because a handyman in Texas cannot legally pull a structural or plumbing permit, which makes any post-tension slab work unwarrantable and uninsurable when done off the books. If you’re not sure which side of that line your project sits on, call (844) 834-0609 and we’ll help you sort it out before you spend a dollar.

Why Slab Work Is the Bright Line in McKinney
Consider what happened to a homeowner in Stonebridge Ranch. A handyman patched the slab cracks in a hallway and re-tiled the floor over the patch. No permit, no post-tension cable survey, no engineering review. Six months later a supply line failed under that slab and the water ran into the open cracks. The homeowner filed a claim and it was denied, because the earlier work hadn’t been performed by a licensed contractor under permit. The re-tile was cosmetic. The slab crack wasn’t.
That’s the whole argument in one story. McKinney’s master-planned subdivisions, Stonebridge Ranch and Craig Ranch chief among them, sit on post-tension slabs. A post-tension slab isn’t poured concrete with rebar like the older homes around the downtown square. It’s a slab with tensioned steel cables running through it under load. If a repair or remodel cuts into or penetrates that slab, the cables need to be located and mapped first, and the work needs a permit and a licensed contractor. A handyman who drills an anchor or breaks out tile without a cable survey is one bad strike away from a cable that whips through a room. A trained professional with the right tools doesn’t guess at this.
The local soil makes it worse. North Texas’ expansive Blackland Prairie clay swells and shrinks hard with the wet-dry cycle, and a dry summer will crack the ground around a slab and shift the whole structure enough to stick doors and open hairline cracks. That’s normal here. What matters is that a foundation repair quote often needs drainage or soaker-hose correction to be warrantable at all, and that’s engineering work, not handyman work.
What a Texas Handyman Can and Can’t Legally Do
Texas doesn’t license handymen as a trade. A handyman can do incidental repairs and maintenance that don’t require a permit, and that’s a genuinely useful limit. What they can’t do is pull the permits that plumbing, structural, and electrical work require, because a permit is held by a licensed professional. Here’s how the line falls on the ground:
- Handyman territory: hanging a door, patching drywall, replacing a faucet, swapping an outlet, installing a backsplash, re-grouting tile, painting, and trim carpentry. Cosmetic, non-structural, no permit.
- Licensed general contractor territory: anything cutting into a post-tension slab (crack repair, plumbing reroute under the slab, foundation drainage), any structural change such as removing a wall, full bathroom and kitchen remodels where plumbing and electrical move, roof replacement, home additions, and ADU or garage conversion work.
- The gray zone: a “simple” bathroom update that moves a drain line. The tile is cosmetic; the drain isn’t. That job needs a licensed GC, not a handyman with a tile saw.
Bradford Remodeling Co McKinney handles kitchens, bathrooms, roofs, and whole-home remodels under a written price before work begins. Our technicians have up to 22 years of experience, and we use the trade’s real words, then explain them plainly so nobody gets talked past. If your project is a two-hour faucet swap, we’ll tell you a handyman is the right call.

Written Guarantee vs. “I’ll Come Back and Fix It”
A handyman’s promise to return is verbal. Ours is legal. Every completed Bradford project carries the 365-Day Done Right Promise: a full-year written guarantee that if the work fails inside that window, Bradford comes back and corrects it at no charge. That document has standing. It’s the difference between a handshake and a record, and insurance companies, warranty providers, and future buyers all know the difference.
The same applies to the paper trail. Bradford includes a written price before any work starts, every time, under what we call The Garrison Standard, and the crew is background-checked and uniformed so you know exactly who’s coming through the door. When the job closes, you hold a clean site, a documented scope, and a signed written guarantee. That’s what squared away looks like.
When We Refer the Work Out Instead
Honest scope-setting means telling you when we’re not the right fit. Sometimes a job is better served by a single licensed trade specialist, and we say so. We hand HVAC to a licensed HVAC specialist, structural engineering and foundation warranty decisions to a licensed engineer, and small cosmetic tasks to a handyman when that’s genuinely the correct answer. Under The Garrison Standard, an honest referral isn’t a lost sale, it’s the trust in writing. The customer who gets the right answer comes back for the bigger job.
| Job | Who Should Do It | Typical McKinney Range |
|---|---|---|
| Backsplash install | Handyman | $800-$2,500 |
| Bathroom vanity swap | Handyman or GC (if plumbing moves) | $800-$3,000 |
| Small bathroom remodel | Licensed GC | $5,000-$12,000 |
| Full kitchen remodel | Licensed GC | $14,000-$45,000 |
| Roof replacement | Licensed GC | $8,000-$20,000 |
| Slab crack repair | Licensed GC + engineer | Scope-dependent |
| Home addition | Licensed GC | $45,000-$130,000 |
Key Takeaways
- A handyman in Texas can’t legally pull a structural or plumbing permit, so any post-tension slab work needs a licensed GC.
- Cosmetic, non-structural, no-permit tasks are fair game for a handyman.
- A written 365-Day guarantee has legal standing; a verbal “I’ll fix it” does not.
- Every Bradford project starts with a written price and ends with a signed guarantee.
FAQs
A handyman can replace a faucet or swap a shutoff valve, but anything that reroutes pipe, cuts into a slab, or requires a permit must go to a licensed contractor. In McKinney, under-slab plumbing reroutes are the most common job that crosses the line, and it’s the one that most often voids a future insurance claim when done without a permit. Call (844) 834-0609 if you’re unsure which side your project falls on, and we’ll tell you straight.
A handyman is cheaper only if the project is cosmetic and no plumbing, electrical, or structural work moves. A small bathroom remodel in McKinney runs $5,000-$12,000 with a licensed GC and a written price, and a full bathroom remodel runs $9,000-$28,000. That figure includes the permit, the inspection, and the written guarantee, which is the part a handyman’s price never covers. Call (844) 834-0609 for an exact written quote before work starts.
Because McKinney’s newer subdivisions sit on post-tension slabs, and cutting into one requires a permit, a cable survey, and a licensed contractor. The expansive clay soil here is constantly shifting slabs, so crack repair, plumbing reroutes, and drainage correction are common. Insurance won’t cover a failure traced to unpermitted work, and foundations fixed without drainage correction often aren’t warrantable. That’s a permit-and-license job, not a handyman job.
The 365-Day Done Right Promise is a full-year written guarantee on every completed project: if the work fails inside that window, Bradford returns and corrects it at no charge. It’s in your hand at job close, along with a documented scope and a written price. Call (844) 834-0609 for a free estimate and to see the guarantee in writing before any work starts.
Get a Straight Answer in McKinney
If you’d rather have it looked at, Bradford Remodeling Co McKinney offers a no-pressure assessment in McKinney for any project on either side of the line. We’ll tell you whether you need a licensed contractor or a handyman, put the price in writing if it’s ours to do, and back the work with the 365-Day Done Right Promise. Call (844) 834-0609 for a free estimate.
Written by the team at Bradford Remodeling Co McKinney, serving McKinney, TX.


