







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Murphy
Bathroom remodeling in Murphy is renovation work, not new construction. The town is nearly built out, so nearly every project here means opening walls inside a house people are still living in. We plan for that: protected driveways, staged materials, tight scheduling, and a written scope before anything gets torn out. Our crews know the 1990s – early 2000s brick homes around the 75094 ZIP, the Clay soils under them, and what usually goes wrong behind a tub wall. Call (844) 834-0609 for a free written estimate.
Why Bradford Remodeling Co McKinney Is Murphy’s Preferred Bathroom Remodeling Company

Murphy homeowners have mostly been through a bad remodel once already – the no-show week, the invoice that moved after the porch handshake, the crew that left a dumpster in the driveway for a month. We’re built against that. Bradford Remodeling operates under The Garrison Standard, which means every price is written and signed off before a single tool comes out, and every finished bathroom carries the 365-Day Done Right Promise: if the work fails inside that year, we come back and correct it at no charge.
Our technicians have up to 22 years of experience, they’re background-checked and uniformed, and a live person answers the phone 24/7 – not a queue, not a voicemail. We work from a documented roster of name-brand materials so what goes into your shower is traceable, not guessed at. If you live off Murphy Road near the high school or over by Maxwell Creek, you’ve likely seen a crew working a driveway with a plywood mat down. That’s how occupied-home remodels in Murphy should run. Call (844) 834-0609 to schedule your free estimate.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Tub to Shower Conversion in Murphy
A Tub to Shower Conversion in Murphy usually makes sense when the original garden tub has become a step-over hazard or a dust collector in a home you plan to stay in. The job runs $3,500 – $10,000 here, and most of the cost sits in the drain and valve rough-in, waterproofing, tile, and glass – not the tub you’re removing. Because so much of Murphy’s housing is wood-frame with plumbing buried in the original 1990s layouts, the conversion starts with opening the wall and confirming what’s behind it.
What the Conversion Actually Involves
A conversion means pulling the tub, reworking the drain to a shower configuration, setting a sloped pan, and waterproofing the walls before any tile goes up. The old tub cavity often hides soft subfloor near the drain, which gets replaced with cement board and a proper pan liner. Inspections are scheduled before the walls close so the rough-in plumbing and electrical are signed off while they’re still visible.
Permits and Inspection Sign-Off
Moving a drain or adding a shower valve is plumbing work that requires a permit and inspection in Murphy, even when the bathroom sits on an interior wall. Skipping that step feels faster and costs far more later, because a compliant conversion has paper behind it. A written quote should name the permit pull, the pan build, and the inspection sequence in the scope.
One Day Bath Remodel in Murphy

A One Day Bath Remodel in Murphy is a fit for the smaller hall baths and guest baths in the 1990s brick homes off FM 544, where you want new surfaces, fixtures, and vanity without a full tear-out. These typically run $5,000 – $12,000 in Murphy, and they’re not a gut remodel – they’re a scheduled, sequenced swap of the visible layer: tub or shower surround, tile, fixtures, and vanity. The one-day label only holds when the substrate underneath is sound and the rough-in is already where it needs to be.
Where One-Day Remodels Work Best
A one-day bath gets tight when a walk-in shower surround, a vanity, and new fixtures are all on the same schedule and the existing drain is already correct. It’s the fastest path to a clean, modern bathroom when nothing is hiding behind the drywall. When soft subfloor or a mismatched drain turns up after demo, the scope changes – which is exactly why it’s written down first.
What Changes the Timeline
Hidden rot near the tub, a failed pan liner, or a shower drain that doesn’t line up with modern valve spacing will push the job past a day. A written scope with allowances for tile and fixtures, a draw schedule tied to milestones, and a punch list keeps that from turning into a surprise. Call (844) 834-0609 to schedule your free estimate.
Trusted Brands We Service in Murphy
We install premium, documented brands so the spec on your bathroom isn’t a guess: KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, and Kohler and Moen fixtures, among others on our approved list. We don’t stock parts – each project is ordered to spec, which is why the written price stays fixed and the material is traceable to a manufacturer warranty. Fast turnaround on bathroom work comes from disciplined scheduling, not from a stocked truck. When you hear “compliance” on this page, it’s the same discipline applied to permits, inspections, and product documentation. If you’re comparing brands or specifying a fixture, our Bathroom Remodeling team can walk you through what fits your Murphy bathroom.
Common Bathroom Remodeling Problems We See in Murphy Homes
- Soft subfloor near the tub. Slow leaks behind a tub surround in a 1990s Murphy home often rot the subfloor before anyone sees a stain. The fix is new cement board and a proper pan – found during demo, before the price is finalized.
- Permits skipped on interior walls. A bathroom on an interior wall still needs a permit for the plumbing and electrical rough-in. When the walls close before inspection, sign-off fails and the tile has to come back off.
- Low-bid quotes with no allowances. A quote that excludes subfloor repair or fixture allowances looks cheaper until the change order lands. Once hidden rot shows up, the savings disappear.
- Ventilation left as-is. The original 1990s exhaust fan often can’t clear steam from a larger shower, so moisture migrates into the adjacent bedroom wall cavity. Upgrading the vent is part of a compliant scope.
See the difference
Before
After
Before
After
Before
AfterPricing for Bathroom Remodeling in Murphy, TX
A full bathroom remodel in Murphy typically runs $9,000 – $28,000, and the line items below show where the money lands. The range holds when the subfloor and rough-in are sound; hidden rot and added fixture allowances move it. We give you that written price before work starts, free, with no numbers that shift at the door. Here’s the honest Murphy breakdown:
| Scope | Murphy Price Range |
|---|---|
| Bathroom Remodel (full) | $9,000 – $28,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
A compliant quote names the permit pull, the subfloor spec, the waterproofing method, and the fixture allowances. A cheap one leaves those out and makes them change orders. Call (844) 834-0609 for an exact quote – estimates are free.
We Also Serve Cities Near Murphy
We work the same occupied-home remodels across the towns around us, so we understand the shared logistics: Sachse, Wylie, Fairview, and Lucas sit close enough that a crew in one soon knows the others. The conditions are similar – built-out neighborhoods, 1990s and 2000s homes, tight driveways. If you’re comparing options in Murphy or nearby, call (844) 834-0609.
Serving Murphy, TX – Our Local Coverage Area
We serve Murphy and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Murphy
Yes – a bathroom remodel in Murphy that moves plumbing or electrical requires a permit and inspection, even on an interior wall. The rough-in plumbing and electrical are inspected before the walls close, and the finished work is checked against the approved scope. Skipping that step is why so many interior-wall bathrooms fail sign-off once the tile is up. Call (844) 834-0609 for a written scope that names the permit pull.
Ask for the product documentation and the permit record, because compliance in Murphy is proven by paper, not a verbal promise. A compliant quote names the permit pull, the waterproofing and substrate spec, and lists fixtures from a documented brand set with manufacturer warranties behind them. If a quote doesn’t name the permit and the inspection sequence, it isn’t priced to pass. Call (844) 834-0609 for a quote you can verify line by line.
Soft subfloor near the tub drain and a rough-in that doesn’t match modern shower valve spacing are the two most common triggers in a 1990s Murphy conversion. Both are found after demo, and both are legitimate change orders when a written scope spelled out the allowance for them. A quote without those allowances hides the cost until later. Call (844) 834-0609 and we’ll price the conversion with those contingencies written in.
A one-day bath scope in Murphy should name the substrate and pan build, the tile and fixture allowances, the draw schedule tied to milestones, and a punch list for the close. It should also carry a written price before work starts and the 365-Day Done Right Promise in writing, so the guarantee is in your hand, not a memory. Anything short of that will cost you later. Call (844) 834-0609 for a scope you can hold us to.
Documented compliance – permit records, inspection sign-off, and product warranties – is what an insurer asks for if you file a water-damage claim on a remodeled bathroom. A permitted, inspected remodel gives the insurer a paper trail that an unpermitted one doesn’t, and it can protect your coverage when a shower pan or supply line fails. Keep the paperwork with the guarantee. Call (844) 834-0609 to schedule your free estimate.
Get Your Murphy Bathroom Priced

Give us a call at (844) 834-0609 for a free written estimate on bathroom remodeling in Murphy. We’ll walk the bathroom, spell out the scope, name the permit and inspection steps, and hand you a fixed price before any work starts. Every finished project carries the 365-Day Done Right Promise. Estimates are free, and a live person answers the phone 24/7.
Written by the team at Bradford Remodeling Co McKinney.











