







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Remodeling Company in Fate, TX
Home remodeling in Fate, TX, is a different job than remodeling older suburbs. Most houses here went up in the 2000s and 2020s, so the work we do is less about patching worn-out rooms and more about upgrading builder-grade finishes, adding space, and fixing the things that first-generation construction skipped. Fate is one of the fastest-growing small towns in North Texas, and the housing stock shows it. Call (844) 834-0609 for a free written estimate before any work starts.
Why Fate Homes Are Different
Fate sits on the Blackland Prairie, and the expansive clay soil under it shrinks and swells hard through Texas’s wet-dry cycles. That movement shows up in new slabs and foundations, which changes how we approach structural work and anything tied to a floor that may have shifted. Summer heat and the occasional hard freeze set the schedule for concrete pours, roofing, and exterior trim, so we plan around the calendar rather than fight it.
Because so much of Fate was built out within the last two decades, a lot of homes are now hitting the 15-to-20-year window where original builder-grade HVAC, roofing, and exterior trim fail around the same time. Subdivisions built in different phases often have inconsistent details from one street to the next, so we measure and verify instead of assuming the house next door is built the same way. That habit saves surprises once walls are open. Get a written price first; that’s the Garrison Standard.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Main Fate Services
Two jobs come up more than anything else for Fate homeowners: general contracting for additions and structural work, and kitchen remodeling in homes that are ready to move past builder-grade finishes.
General Contractor in Fate
General contracting in Fate is mostly additions, structural fixes, and coordinating trades on new single-family construction and the trim-out work that follows. The clay soil here means we verify foundation and framing before we build on top of anything, and the volume of active builds means scheduling subs takes planning. One crew, one point of contact, one written scope. For permits, sequencing, and inspections handled by one accountable contractor, see our General Contractor in Fate page.

Kitchen Remodeling in Fate
Kitchens in Fate tend to be recent enough that the cabinets and layout are sound, but the finishes are builder-grade and the lighting is thin. A remodel here is usually a cabinet, countertop, and island upgrade rather than a full gut, and we confirm substrate and wall condition first because clay movement can throw a cabinet run out of level. Specification runs on documented brands like KraftMaid and Wellborn cabinetry and Cambria surfaces. Full details on our Kitchen Remodeling in Fate page.

Bathroom Remodeling in Fate
Bathroom work in Fate often starts with a home that has a functional but dated tub-and-tile setup from its original build. We handle walk-in showers, tub-to-shower conversions, and vanity upgrades, and we check the waterproofing and rough-in before tile goes up, since a fast-built subdivision bathroom can hide details worth correcting. Premium fixtures from Kohler and Moen are part of the documented spec. See our Bathroom Remodeling in Fate page for scope and pricing.

Home Remodeling in Fate

Home remodeling in Fate solves a specific problem: houses built in the last two decades that are structurally fine but still wearing their original builder-grade finishes, fixtures, and trim. Add the clay soil moving under slabs and the simultaneous failure of roofs, HVAC, and exterior trim at the 15-to-20-year mark, and most Fate remodels are about upgrading thoughtfully while correcting what the first build left undone. We put every scope in writing through our Home Remodeling work, so the price you agree to is the price you get.
Home Renovation
Signs you need it
You’re looking at a room or a whole floor where the original builder finishes are tired, the trim is failing, and the layout no longer fits how you live in the house.
What it costs in Fate
A focused home renovation typically runs $14,000 – $45,000 for a primary room or a collection of rooms, and a broader whole-home remodel scales from there based on scope.
How we do it
We walk the space, confirm substrate and framing condition, write a line-item scope and price, then demo, rough-in, finish, and close clean with a signed guarantee in your hand.
Whole House Remodel
Signs you need it
The 15-to-20-year failures are stacking up at once – roof, exterior trim, and interior finishes all showing their age – and you’d rather fix it all in one coordinated pass.
What it costs in Fate
Whole-home remodels and additions run $45,000 – $130,000, and luxury-level whole-home work reaches into the $90,000 – $220,000 range when ADU or full reconfiguration is included.
How we do it
We sequence trades around the calendar and the wet-dry cycle, verify foundation and framing first on clay-soil lots, then execute to a written scope with the same crew accountability from demo to close.
What Home Remodeling Costs in Fate
| Item | Typical range in Fate |
|---|---|
| Home remodeling (primary rooms) | $14,000 – $45,000 |
| Home addition | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
Do you pull the permits for a Fate remodel?
Yes. We pull permits and schedule inspections as part of the scope, and we account for HOA architectural review where your subdivision requires it. That’s confirmed in writing before work starts, not after.
Will the price change once work starts on my Fate home?
No. You get a written price before any work begins, and it doesn’t move at the door. If we open a wall and find something the scope didn’t cover, we stop and quote the change in writing before proceeding.
Brands We Service in Fate
Our remodeling specifications run on documented name-brand materials – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures, GAF and James Hardie exterior products, Therma-Tru doors, and Belgard hardscaping – and we also work with Quikrete and Sakrete for concrete and masonry. Specifications are traceable, and requests for those brands move quickly. See our brands.
See the difference
Before
After
Before
After
Before
AfterPricing for Remodeling Company in Fate, TX
| Service | Typical range in Fate |
|---|---|
| Kitchen remodel | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Bathroom remodel | $9,000 – $28,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Home addition | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
| Garage conversion | $30,000 – $80,000 |
What pushes price up in Fate is foundation and slab correction on clay soil, foundation-verify work before an addition, and the premium finishes that replace builder-grade materials. Every number above is a range; your written price is fixed before work starts and doesn’t move.
Neighborhoods We Serve in Fate
We work across Fate’s subdivisions and the older streets near the original town center, and our crews are generally in the area most weekdays, so scheduling a free estimate is straightforward. Response times are consistent across the ZIP 75132 corridor. If you’re not sure whether your street falls inside our service area, call and we’ll confirm.
- Subdivisions along the FM 552 corridor
- Newer phases near downtown Fate
- Older ranch homes near the original town center
- Estates along the western edge of Fate
Service Area – Cities Near Fate
Fate sits in Rockwall County, and our independent local professionals also take on remodeling work in the nearby communities. If you’re just outside Fate, we can usually confirm coverage quickly. We also serve Royse City, TX, Rockwall, TX, Heath, TX, and Wylie, TX. Call with your address and we’ll tell you straight whether we can take the job.
Serving Fate, TX – Our Local Coverage Area
We serve Fate and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Remodeling Company in Fate
We typically schedule a free estimate within a few business days across most of Fate. Calls are answered by a live person, and you’ll get a written price before any work starts. Call (844) 834-0609 to set it up.
Yes. We pull permits, schedule inspections, and account for your subdivision’s HOA architectural review where it applies. Those requirements are confirmed in your written scope before work begins, so nothing surfaces after the crew has started.
We cover all of Fate, ZIP code 75132, including the subdivisions along the FM 552 corridor and the older streets near the original town center. If your address is just outside the city limits, call us and we’ll confirm coverage.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local construction pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Fate Customers Say
"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."
- Tricia S."Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."
- Cal P.












