







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWalk-In Showers & Shower Remodeling in McKinney, TX
A walk-in shower remodel in McKinney, TX typically runs $6,500 to $18,000, with most curbless tile conversions landing between $9,000 and $14,000. The number moves based on tile choice, whether the drain has to be relocated, and whether we’re cutting the slab for a true zero-threshold entry. We write that price down before a single tile comes off the wall, and it doesn’t move at the door.
Walk-in showers matter in McKinney for reasons a generic contractor won’t explain. Our soil is expansive Blackland Prairie clay, and foundation movement here is a real thing. A shower pan that was tiled flat against a floor that has shifted is a leak waiting to happen. We build the pan, set the slope, and waterproof the substrate to manufacturer spec first, then tile. The result is a shower that performs as well in year eight as it did on day one, backed by the 365-Day Done Right Promise in writing.
This work sits inside our Bathroom Remodeling practice, and our name-brand material roster (Kohler and Moen fixtures, documented tile and waterproofing systems) means every spec is traceable. If you’ve been burned by a no-show or a surprise invoice, call (844) 834-0609 and a live person picks up, day or night.

When You Need Walk-In Showers & Shower Remodeling
Most homeowners don’t call us until something forces the decision. These are the situations we see most often in McKinney and the surrounding neighborhoods:
- The step-over has become a hazard. A tub-shower combo with a 15-inch wall is the leading cause of bathroom falls for homeowners over 60. If a parent or grandparent is now steadying themselves on a towel bar, it’s time.
- The tile is failing at the curb or on the floor. Cracked grout, loose tile, or a soft spot near the drain usually means water has been getting behind the substrate. In older McKinney homes (pre-1990s builds especially), a failed pan can mean rot in the framing below.
- The shower is small and dark. A standard 32-inch prefab unit in a 1980s or 1990s McKinney ranch home feels like a closet. A walk-in with a glass panel, a linear drain, and lighter tile opens the room without changing the footprint.
- The drain is slow and keeps backing up. Recurring slow drains in a tiled shower often point to a pan that wasn’t sloped correctly or a waterproofing layer that’s trapping water. Re-tiling over a bad pan just kicks the problem down the road.
- You’re planning to age in place. A curbless, zero-threshold shower with a fold-down seat and a properly placed grab bar is the single most requested aging-in-place upgrade we do in McKinney. It’s built to code and it looks like a spa, not a hospital.
- You’ve got a leak showing up downstairs. A water stain on the ceiling below the shower is the loudest signal in the house. Stop using the shower and call us. That’s a waterproofing failure, and it needs a rebuild, not a patch.
Our Walk-In Showers & Shower Remodeling Process
Here’s exactly how a shower remodel runs with us, from the first phone call to the signed guarantee in your hand:
- On-site assessment and written scope. We inspect the existing shower, the subfloor, the drain, and the surrounding walls. Then we hand you a written price with line items for demo, rough-in, waterproofing, tile, glass, and fixtures. No number moves after that.
- Demo and substrate inspection. We tear out the old pan and tile and check the framing for rot or water damage. If we find something hidden, you see it before we price the fix. The substrate (the structural layer under the tile) gets assessed, not assumed.
- Rough-in and waterproofing. New drain, valve, and supply lines are set. Then the waterproofing goes in: a bonded membrane or a foam board system, installed to the manufacturer’s spec, with the correct slope to the drain. This is the layer that makes or breaks the shower, and it’s never rushed.
- Tile, glass, and fixtures. Tile goes down over the cured membrane. Glass panels and doors are templated after tile so the fit is exact. Kohler or Moen fixtures are set to spec. We walk the ceiling and walls for plumb before we call it done.
- Final walk-through and signed guarantee. We clean the site, haul the debris, and show you the finished shower working. Then you get the signed 365-Day Done Right Promise: if the work fails within a year, we come back and correct it at no charge.
Our technicians bring up to 22 years of experience to a job, and every one of them is background-checked and uniformed, so you know who’s in your house before the crew pulls up.

Walk-In Showers & Shower Remodeling Pricing in McKinney
Prices below reflect typical McKinney work for a standard shower footprint in an existing bathroom. Your written estimate is the real number; these ranges are here so you can budget before you call.
| Scope | Typical range |
|---|---|
| Prefab walk-in unit replaced in kind (no tile) | $3,500 – $6,000 |
| Tiled walk-in shower, standard curb, existing drain | $6,500 – $10,500 |
| Curbless / zero-threshold conversion, slab cut | $10,000 – $16,000 |
| Frameless glass panels and door (installed) | $1,400 – $3,200 |
| Linear drain conversion | $900 – $1,800 |
| Aging-in-place package (seat, grab bars, curbless) | $2,000 – $5,000 added |
Three things move the McKinney price up. Slab work: a true curbless shower means cutting and plumbing the concrete slab to drop the drain, which is labor and permits. Waterproofing system choice: a bonded membrane runs less than a full foam-board system, and both are priced clearly. Tile: large-format porcelain and natural stone cost more in material and in cutting time; a mosaic pan requires more grout lines and more labor.
You’ll get a written price before any work starts. That’s non-negotiable on our side, and it’s part of The Garrison Standard, the framework every Garrison Partners location operates under. We’re part of the family established in 2004 and independently owned and operated. Call (844) 834-0609 for a free estimate. A real person answers, 24/7.
Key takeaways:
- Most McKinney tiled walk-in shower remodels land between $6,500 and $14,000.
- Curbless is the upgrade that adds the most, and why matters. It’s the accessibility feature.
- Every price is written before work starts. No door-step repricing.
- Every completed shower carries the 365-Day Done Right Promise in writing.
FAQs – Walk-In Showers & Shower Remodeling
How much does a walk-in shower remodel cost in McKinney?
A walk-in shower remodel in McKinney typically costs $6,500 to $18,000, with a tiled conversion of an existing shower running $9,000 to $14,000. Curbless conversions and natural stone push toward the top of that range; prefab unit replacement sits at the low end. Call (844) 834-0609 for an exact written quote. Estimates are free.
Can you convert my tub to a walk-in shower?
Yes. Tub-to-shower conversions are one of our most common McKinney jobs, and they usually run $7,500 to $13,000 depending on tile, drain location, and whether the valve has to be moved. We pull permits where the plumbing rough-in changes, reroute the drain, and build the pan and waterproofing to spec. The price is written down before we start. Call (844) 834-0609 to schedule an assessment.
Will a curbless shower work with my foundation?
Usually yes, but it depends on the slab and the floor framing. A true zero-threshold shower means dropping the drain into the slab, and in McKinney’s expansive clay soil, we check that the surrounding foundation hasn’t shifted before we cut. If the slab has moved, we’ll tell you and recommend a curb with a low threshold instead. We don’t sell curbless where the foundation won’t support it.
Is it cheaper to repair or replace my shower?
A repair is cheaper when the failure is in a single area (one cracked tile, a failed seal, a bad valve). Replacing is the smarter call when waterproofing has failed across the pan, when tile is loose in multiple spots, or when the shower has been leaking long enough to reach the subfloor. We inspect before we quote, so you get the right answer for the condition, not a sales pitch. Call (844) 834-0609 and we’ll walk you through what we can see.
When the work is done, the site is clean, the scope is documented, and a signed 365-Day Done Right Promise is in your hand. That’s what “squared away” looks like at close. For the full picture of what else we do in a bathroom, see our Bathroom Remodeling in McKinney page and the home page for the broader practice. Reach out at (844) 834-0609 for a free estimate, and a live person will pick up.
Written by the team at Bradford Remodeling Co McKinney, serving McKinney.


