A Bradford company - serving McKinney, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Full Bathroom Remodeling in McKinney, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A low-threshold walk-in shower with a bench and grab bar
A powder room with botanical wallpaper and a stone sink
A wood double vanity with two mirrors after a bathroom remodel
An open kitchen and dining area after a remodel
A whole-home remodel with the living, dining and kitchen areas opened up
A second-story addition that matches the existing roofline
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Full Bathroom Remodeling in McKinney, TX

A full bathroom remodeling in McKinney typically runs $14,000 to $32,000 for a standard hall or primary bath, and $30,000 to $55,000 and up when you move plumbing, expand the footprint, or specify premium stone and custom cabinetry. That’s a real range, not a teaser. It assumes a gut renovation: tub and shower out, vanity out, tile down to the substrate, new rough-in for plumbing and electrical where the layout changes, and everything rebuilt to current code.

We do these jobs as part of our Bathroom Remodeling work across McKinney, and we give you a written price before a single tool comes out. If you’re weighing a full remodel against a smaller scope, call (844) 834-0609 and a live person will pick up.

What makes a full remodel different from a cosmetic refresh is that it touches everything hidden: the rough-in, the substrate behind the tile, the venting, the framing around the window. In McKinney’s older neighborhoods near the Historic District, we regularly open a wall and find cast-iron drain fittings or galvanized supply lines that need replacing, which is why we build contingency into the written price instead of surprising you with a change order at the end.

A tile setter installing wall tile in a shower

When You Need Full Bathroom Remodeling

  • Your tile is cracked or the grout won’t stay put. Cracks that return after re-grouting usually point to a moving substrate under the floor – a soft subfloor or a failed mortar bed – and that means tearing out to the framing to fix it right.
  • You’ve got a slow leak you can’t trace. A water stain on the ceiling below the upstairs bath, or softness at the base of the tub, often means a failed shower pan or a leaking supply joint. In a house built before the mid-1990s, that’s the signal to open the wall rather than patch over it.
  • Your layout fights you every morning. A door that swings into the vanity, a tub you never use taking the only wall space, a shower with no clearance for a walker. Moving one wall or swapping the tub for a curbless shower changes how the room works.
  • The finishes are past their service life. Cultured marble yellowing, dated brass fixtures, a vanity cabinet with water-damaged toe kicks. Cosmetic updates can stretch a few more years, but when the structure behind them is failing, a full remodel is the practical route.
  • You’re aging in place or planning to. Curbless showers, blocking in the walls for future grab bars, and a taller comfort-height toilet are best built in during a full remodel, not retrofitted later.
  • You’re selling or updating before a move. A full remodel with documented materials gives a buyer something concrete to see, and the written guarantee travels with the completed work.

Our Full Bathroom Remodeling Process

We run every McKinney full bath on the same sequence, and you get the schedule in writing before demo day.

  1. Walkthrough and written scope. We measure the room, look at what’s behind the walls as far as we can see, and talk through what you want to keep. You get a written price and a written scope of exactly what’s included and what’s not. No numbers that move at the door.
  2. Material selections on a documented roster. We specify from brands with manufacturer specs and warranties that back our own guarantee – KraftMaid or Wellborn cabinetry, Cambria or Caesarstone surfaces, Kohler or Moen fixtures, and a solid-core door from Therma-Tru when the bath opens to a hallway. Picking from documented materials means the spec is traceable, not left to guesswork.
  3. Protection and demolition. Floors and adjacent rooms get protected before demo. We haul out to the curb, not to your garage, and we keep the site swept at the end of each day.
  4. Rough-in and inspections. New plumbing supply and drain lines, electrical, and exhaust venting go in before anything is closed up. McKinney follows the current International Residential Code, and inspections are part of the schedule, not an afterthought.
  5. Substrate, waterproofing, and tile. Cement backer board or a bonded waterproofing membrane goes down before tile, and the shower pan is flood-tested. This is the part nobody sees and the reason tile fails or doesn’t.
  6. Finishes and close. Cabinetry, counters, fixtures, paint, and trim. At close you get a clean site, a documented scope, and a signed written guarantee in your hand. That’s what squared away looks like.
A remodeled staircase with wood treads and a slim metal railing

Full Bathroom Remodeling Pricing in McKinney

Here’s how the money breaks down on a typical McKinney full bath. These are line-item ranges from jobs we’ve scoped in the area, not national averages.

Line item Typical range
Demolition and haul-away $900 – $2,200
Plumbing rough-in (relocate or replace) $1,800 – $5,500
Electrical and exhaust venting $800 – $2,000
Substrate, waterproofing, and tile $4,000 – $11,000
Vanity, cabinetry, and countertop $2,500 – $7,500
Fixtures (shower valve, tub, toilet, sink) $1,200 – $4,500
Paint, trim, and door $600 – $1,800

These ranges shift with a few things: whether the plumbing stays in place or moves, whether the floor is a soft subfloor over a crawl space or a slab (McKinney has both, often on the same street), tile size and pattern (a herringbone or a large-format 24×48 porcelain adds labor), and how much premium stone you specify. A tub-to-shower conversion with a curbless pan also costs more than a straight replacement because of the framing and waterproofing work.

We put the price in writing before any work starts. That’s not a sales room; it’s the price you’ll be billed. If you want a firm number on your actual room, call (844) 834-0609 for a free estimate.

If you’re keeping the same footprint and just refreshing finishes, our guide to bathroom remodeling in McKinney covers the lighter-scope options and how they compare.

What the 365-Day Done Right Promise Covers

Every completed full bathroom remodel we do carries a full-year written guarantee. If the work fails inside that 365-day window – a leak at a supply joint, tile that de-bonds, a door that won’t sit true – we come back and correct it at no charge. The guarantee is in writing and you hold a signed copy at close. It doesn’t cover damage from neglect or a fixture the manufacturer recalls, and we say that plainly up front so there’s no fine print later.

We’re part of the Garrison Partners family, independently owned and operated and held to The Garrison Standard, which is the framework behind every price and every promise we make. Our technicians have up to 22 years of experience, and every crew member is background-checked and uniformed, so you know who’s walking through your door before they arrive. A live person answers the phone around the clock.

FAQs – Full Bathroom Remodeling

How much does a full bathroom remodel cost in McKinney?

A full bathroom remodel in McKinney typically costs $14,000 to $32,000 for a standard hall or primary bath, and $30,000 to $55,000 and up when you move plumbing or expand the footprint. The biggest cost swings are plumbing relocation, tile complexity, and premium stone. Call (844) 834-0609 for a free written estimate on your room.

How long does a full bathroom remodel take?

Most full baths take three to six weeks from demo to close, depending on material lead times and whether inspections fall on a holiday. Custom cabinetry from KraftMaid or Wellborn can add a week or two on the front end if we’re ordering a specific door style. We give you the schedule in writing so you can plan around it.

Is it cheaper to repair or replace a failing bathroom?

For a single failed shower pan or a cracked tile field with a solid substrate underneath, a targeted repair is usually cheaper. Once the damage spreads to two or more systems – plumbing, waterproofing, and framing – a full remodel is the more cost-effective route because you’re paying for demo and access once instead of three times. Call (844) 834-0609 and we’ll tell you straight which side of that line your bath is on.

Can you come today?

We can take your call today and, in most cases, schedule a walkthrough within a few days. Same-day emergency visits are handled by a live person who can talk through the problem with you right now. Call (844) 834-0609 and a real person will pick up.

Full bath remodels often pair with other work in the same house. If you’re updating more than one room, we also handle kitchen remodeling, whole-home remodeling, and general contracting for additions and structural changes. Homeowners in neighboring Allen, Frisco, and Plano call us for the same scope. We also work with homeowners in Prosper and Celina, where new-build baths often need fixture and finish upgrades within the first few years. If your bath is part of a larger home remodeling plan, we can sequence the work so you’re not living in a construction zone longer than necessary.

Schedule Your Free Estimate

A full bathroom remodel done right is a written scope, a written price, and a written guarantee you hold when the job closes. That’s the standard we work to in McKinney, and it’s the reason homeowners call us instead of chasing a crew that no-shows. Call Bradford Remodeling Co McKinney at (844) 834-0609 for a free estimate – a live person answers, and we’ll give you the number in writing before any work starts.

Written by the team at Bradford Remodeling Co McKinney, serving McKinney.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in McKinney? Licensed & insured · free written estimates
Call (844) 834-0609
Local Service Coverage

Request a Free Estimate in McKinney

Tell us what you need - Bradford Remodeling Co McKinney responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch