







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Remodeling Company in Anna, TX
Home remodeling in Anna is mostly a story about new houses that need to become the right house. This town is growing fast along the US-75 corridor north of McKinney, and most of the work we do here is on homes built in the last decade or two, where slab foundations, brick veneer, and an open floor plan are the starting point rather than the ending point. What makes an Anna job different is the ground the house sits on: blackland clay that swells when it’s wet and shrinks hard in the summer, so drainage, grading, and the way a slab moves matter on every project. We put the price in writing before any work starts, and every finished job carries our 365-Day Done Right Promise. Call (844) 834-0609 to set up a free estimate.
Why Anna Homes Are Different
Most Anna housing went up in the 2000s and later, which means the typical project starts with good bones and a builder-grade finish package. You’re not saving a 1960s floor plan. You’re reworking an open layout that one builder repeated across a few hundred homes, and doing it so your house doesn’t read like the neighbor’s. Large-lot single-family homes with slab-on-grade foundations and brick or stone veneer are the norm, and a lot of them still sit inside a builder warranty window, so the order of operations matters when you alter anything structural.
The ground is the other half of the story. Blackland prairie clay under the slab shrinks and swells through North Texas wet-dry cycles, and the summer heat pulls moisture out of it fast. On the former pasture and ranch parcels being converted into subdivisions around Anna, the soil profile runs deeper and less uniform than it does on older developed land, which is why grading and drainage get as much attention as tile. Houses here also sit inside active HOAs that review exterior changes, so plans need to clear the architectural committee before the first board comes down. Get those two things right – soil and approvals – and the remodel goes quietly.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Main Anna Services
The two calls we get most from Anna homeowners are about opening up a builder-standard kitchen and rebuilding a bathroom that was finished to a price point. Both have their own dedicated pages.
General Contractor in Anna
A general contractor in Anna coordinates the whole job: the trades, the sequencing, the inspections, and the written scope that keeps everybody building to the same drawing. On the new-build-heavy streets here, that usually means tying an addition or a reworked wall system back into a slab-on-grade foundation and a brick veneer exterior without leaving a seam. It also means pulling the permits and scheduling the inspections rather than leaving that to you. We write the price before work starts and hold to it. Read more about our General Contractor in Anna work.

Kitchen Remodeling in Anna
Kitchens in Anna tend to be the one room where builder-grade shows most: the same cabinet box, the same laminate counter, the same lighting plan as the house two doors down. Reworking one here is usually about opening the wall to the living area, moving the island, and upgrading the surfaces and fixtures to something that holds up. The clay ground underneath doesn’t affect a kitchen directly, but a slab that has moved can throw a cabinet run out of level, and we check for that before anything is ordered. See our Kitchen Remodeling in Anna page for the full scope.

Bathroom Remodeling in Anna
Bathrooms in this housing stock are the second place a builder’s budget shows – a tub/shower combo where a walk-in shower belongs, a vanity that’s undersized for the room. Because Anna homes are mostly newer, the plumbing rough-in is usually sound and the job is a finish-and-fixture rebuild rather than a re-pipe. The tile work is where it gets careful: slab movement under a bathroom floor will telegraph through a rigid tile layout if the substrate isn’t prepped right. Our Bathroom Remodeling in Anna page covers what that prep involves.

Home Remodeling in Anna

Home remodeling in Anna usually solves a specific problem: a house that was built fast and finished to a price point, now sitting on ground that moves with the seasons. Homes here are overwhelmingly new – large-lot single-family in subdivisions built since the 2000s, slab-on-grade, brick and stone veneer – so the work is rarely about saving old materials. It’s about taking a builder’s standard layout and making it fit how you actually live, on a foundation that needs watching. If you want the full scope of what we do, our Home Remodeling page lays it out.
Whole House Remodel
Signs you need it
You’re planning to change three or more rooms at once, or the layout fights you every day – a closed-off kitchen, a hallway you don’t need, a primary suite that’s smaller than the house deserves.
What it costs in Anna
A whole-home remodel in Anna is a large project, and the closest supplied figure for a scope this size is our home addition range of $45,000 – $130,000; a full-house rework at the top end runs above that, and we put the exact number in writing after we walk the house.
How we do it
We walk the house with you, write a room-by-room scope and a fixed price, pull the permits, sequence the trades so demolition and rough-in don’t overlap with finish work, and close with a clean site and a signed 365-Day Done Right Promise in your hand.
Home Renovation
Signs you need it
One or two rooms need real work – a kitchen and a bath, a flooring and trim package, or a finish upgrade across the main living area – without touching the structure.
What it costs in Anna
Renovation pricing depends on which rooms are in scope; a kitchen remodel runs $14,000 – $45,000 and a bathroom remodel runs $9,000 – $28,000, so a two-room renovation here typically lands between those figures.
How we do it
We measure the rooms, check the slab and subfloor for movement, write the scope and price, then work room by room so you keep at least one bathroom and a working kitchen through most of the job.
What Home Remodeling Costs in Anna
| Item | Typical range in Anna |
|---|---|
| Kitchen remodel | $14,000 – $45,000 |
| Bathroom remodel | $9,000 – $28,000 |
| Home addition | $45,000 – $130,000 |
Do you pull the permits for a remodel in Anna?
Yes. We pull the permits and schedule the inspections, and we coordinate with your HOA’s architectural review on exterior changes before work begins. On newer Anna homes still inside a builder warranty window, we sequence the work so you don’t void coverage you may still need. Call (844) 834-0609 for a free estimate.
Will the price change once work starts in Anna?
No. You get a written price before any work starts, and that number holds unless you ask us to change the scope in writing. If we open a wall and find something the walk-through couldn’t show, we stop and price it with you before proceeding. Estimates are free.
Brands We Service in Anna
We install and work with a documented roster of name-brand materials – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures, GAF roofing, James Hardie siding, and Therma-Tru doors among them, plus window lines from Boral and PGT. That means every spec is traceable and manufacturer warranties back our own. We don’t stock parts on trucks; materials are ordered to the written scope. See our brands for the full list.
See the difference
Before
After
Before
After
Before
AfterPricing for Remodeling Company in Anna, TX
| Service | Typical range in Anna |
|---|---|
| Kitchen remodel | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Bathroom remodel | $9,000 – $28,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Home addition | $45,000 – $130,000 |
| Garage conversion | $30,000 – $80,000 |
| ADU construction | $90,000 – $220,000 |
What pushes price up in Anna is almost always the ground and the approvals: extra grading or drainage work where the blackland clay sits uneven on a former pasture parcel, and higher-end cabinetry and counter surfaces where you’re upgrading past builder grade. We give you a written price before any work starts, itemized so you can see where the money goes, and it doesn’t move at the door.
Neighborhoods We Serve in Anna
We work throughout Anna and the ZIP 75409 area, including the newer subdivisions going up along the US-75 corridor and the established streets closer to the center of town. Because these are large new-build neighborhoods spreading north, we plan site visits around the drive time from the corridor so you get a firm appointment window rather than a vague “sometime today.” Request a free estimate and we’ll confirm timing for your address.
- Subdivisions along the US-75 corridor
- Newer master-planned neighborhoods in north Anna
- Established streets near the center of Anna
- Custom homes on larger lots east of US-75
Service Area – Cities Near Anna
Anna sits in a stretch of fast-growing Collin County towns, and we work the whole area. Some of the calls come from neighbors just up or down the corridor: homeowners in Melissa, TX to the south and Princeton, TX to the east are dealing with the same clay and the same new-build finish packages. We also take work in McKinney, TX, the larger city to the south, and Fairview, TX to the east. If you’re unsure whether your address is in range, call and we’ll confirm.
Serving Anna, TX – Our Local Coverage Area
We serve Anna and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Remodeling Company in Anna
We schedule estimates along the US-75 corridor on a set route, so most Anna requests get a firm appointment window within a few business days. We confirm the time by phone and keep it. Call (844) 834-0609 and we’ll get you on the schedule. Estimates are free.
We pull the permits and schedule inspections, and we help you prepare the submittal for your HOA’s architectural review on exterior changes. Anna’s newer subdivisions all have active HOAs that review things like additions, fence lines, and exterior finishes, so we sort that before any work begins.
Yes, and we’re careful about it. A lot of Anna homes are still inside a builder warranty window, so we sequence the work to avoid voiding coverage you may still need, and we document what we touch. Call us and we’ll walk your situation before quoting.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local construction pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Anna Customers Say
"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."
- Tricia S."Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."
- Cal P.












