A Bradford company - serving McKinney, TX
A remodeled home with a front porch on a quiet street at golden hour
Princeton, TX

Remodeling Company in Princeton - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one accountable point of contact. Permits handled, and the local pro we connect you with is licensed and insured.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A dining nook with a built-in banquette
A home office with a built-in desk and shelves
An open living space after a whole-home remodel
A remodeled living room with built-in shelves around the fireplace
A whole-home remodel with the living, dining and kitchen areas opened up
A low-threshold walk-in shower with a bench and grab bar
A walk-in pantry with wood shelving
A powder room with botanical wallpaper and a stone sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Remodeling Company in Princeton, TX

Home remodeling in Princeton means something different than it does two towns west. Most of the housing here went up after 2000, so the work is less about pulling out 1970s tile and more about finishing what a builder started, reworking a layout the first owner never got right, or adding square footage to a slab that’s still settling into North Texas clay. Bradford Remodeling writes the price before a tool comes out and backs every finished project with the 365-Day Done Right Promise. Call (844) 834-0609 for a free estimate.

Call (844) 834-0609

Why Princeton Homes Are Different

Princeton sits in the middle of a growth corridor, with subdivisions and acreage custom builds pushing into former farmland along US 380. That shapes the remodeling work. Housing stock is overwhelmingly new: brick-veneer, slab-on-grade tract homes plus scattered custom builds on multi-acre parcels, and very little pre-1980 inventory compared to older Collin County towns. We’re rarely gutting a 1950s kitchen. We’re reworking builder-grade finishes, opening up a wall the plan didn’t call for, or finishing a bonus room over the garage.

Two local conditions drive the rest. First, expansive black clay soil that shrinks and swells with wet-dry cycles, which means any remodel touching the slab or adding load needs drainage graded correctly and footing details respected. Second, the ongoing 380 widening corridor, which keeps reshaping access and frontage as lots are platted, so staging and material delivery on some Princeton jobs takes more planning than the work itself. Hail season and tornado-wind events also factor into anything exterior. Plan the site, then plan the build.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Main Princeton Services

Princeton homeowners call us about two things more than any other: full-scope remodeling and the general contracting that holds a project together from permit to final walkthrough.

General Contractor in Princeton

A general contractor on a Princeton job is the person who sequences trades, pulls permits with the city, and keeps a slab-on-grade build from turning into a change-order parade. Because so much local work is new construction and acreage builds, the GC role here leans toward coordinating foundation and framing details, utility taps, and the inspections that go with them. We put the full scope in writing before work starts. If your project needs a hand on the wheel, start with our General Contractor in Princeton page.

General Contractor in Princeton

Kitchen Remodeling in Princeton

Kitchens in Princeton’s newer subdivisions are usually solidly built but finish-grade: laminate counters, stock cabinets, a layout that assumed one cook and no island. Remodeling here is often about reworking the footprint, upgrading to KraftMaid or Wellborn cabinetry, and setting Cambria or Caesarstone surfaces that hold up to daily use. We handle the rough-in changes, the countertop templating, and the punch list. Full details live on our Kitchen Remodeling in Princeton page.

Kitchen Remodeling in Princeton

Bathroom Remodeling in Princeton

Bathroom work in Princeton tends to split two ways: tract homes where the original tub-and-shower combo is ready for a walk-in conversion, and custom builds where the finishes were specified but never quite finished. Either way, the job is waterproofing done right, drainage that accounts for slab movement, and fixtures from Kohler or Moen that won’t need replacing in five years. Our Bathroom Remodeling in Princeton page covers the scope in full.

Bathroom Remodeling in Princeton
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 834-0609

Home Remodeling in Princeton

A remodeled staircase with wood treads and a slim metal railing

Home remodeling in Princeton is shaped by two forces most homeowners here don’t expect. The housing stock is young, so the problem usually isn’t age – it’s a builder’s layout that never fit how the family actually lives, or finishes that looked fine at closing and wore out fast. Add expansive black clay under nearly every slab in 75407, and any remodel that changes load paths or adds square footage has to respect how that soil moves. Our Home Remodeling work starts with a written scope and a written price, and it ends with a signed 365-Day Done Right Promise in your hand.

Whole House Remodel

Signs you need it

You’re changing how the house flows – opening the kitchen to the living room, converting a formal dining room into a home office, adding a primary suite – and the work touches framing, plumbing, electrical, or the slab in more than one room.

What it costs in Princeton

A whole-house remodel in Princeton typically runs $45,000 – $130,000 depending on square footage and whether structural changes are involved.

How we do it

We walk the house, document every room and system, pull the city permits, sequence framing and mechanical rough-in before finishes, and hold each trade to the written scope until final inspection passes.

Luxury Home Remodeling

Signs you need it

You’re building or reworking an acreage custom home where the finishes need to match the architecture – stone surfaces, custom cabinetry, premium fixtures – and you want the specifications traceable, not left to a subcontractor’s guess.

What it costs in Princeton

Luxury remodeling in Princeton falls within our whole-house range of $45,000 – $130,000, scaled by the level of finish and any addition or ADU work.

How we do it

We lock the specification sheet with named brands before work begins, order materials against manufacturer specs and warranties, and keep the site clean and the price fixed through every phase.

What Home Remodeling Costs in Princeton

Item Typical range in Princeton
Whole house remodel $45,000 – $130,000
Home addition $45,000 – $130,000
ADU construction $90,000 – $220,000

Will the price change once remodeling starts in Princeton?

No. We give you a written price before any work starts, and that number holds. If you add scope later, it gets priced and approved in writing before we touch it. No surprise invoice at the door.

Does a Princeton remodel need a permit?

Yes, structural changes, additions, and any work touching plumbing or electrical require permits pulled with the city. We handle the permit and the inspections. Call (844) 834-0609 with your project scope and we’ll tell you what’s required.

Brands We Service in Princeton

We install a documented roster of name-brand materials – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures, GAF and James Hardie exterior products, Therma-Tru doors, and Belgard hardscaping, among others – so specifications are traceable and quality isn’t guesswork. We don’t stock parts; materials are ordered per job against manufacturer specs, and turnaround is set by the written schedule. See our brands for the full list.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Remodeling Company in Princeton, TX

Service Typical range in Princeton
Kitchen remodel $14,000 – $45,000
Small kitchen remodel $9,000 – $20,000
Bathroom remodel $9,000 – $28,000
Whole house remodel $45,000 – $130,000
Home addition $45,000 – $130,000
ADU construction $90,000 – $220,000
Garage conversion $30,000 – $80,000
Countertop installation $2,000 – $6,500
Cabinet installation $4,000 – $13,000
Walk-in shower installation $4,500 – $12,000

In Princeton, price climbs fastest with structural changes – opening a wall, adding square footage, or building on acreage where utility runs are longer than a subdivision lot allows. Foundation and drainage work on expansive clay adds cost that a homeowner in an older, settled neighborhood wouldn’t see. Every number above comes with a written price before work starts, and the price doesn’t move at the door.

Neighborhoods We Serve in Princeton

Princeton’s growth has spread across new subdivisions and acreage parcels throughout 75407, and our crews work all of it. We know the difference between a subdivision slab and a custom build on several acres, and we plan material staging and utility coordination accordingly.

  • Downtown Princeton and the older core near the rail line
  • Subdivisions along US 380
  • Acreage and custom builds on the rural east side
  • Newer tract neighborhoods to the north and west
  • Lots along the widening 380 corridor

We return calls the same business day across the area, and a live person answers the phone 24 hours a day.

Service Area – Cities Near Princeton

Princeton sits on the eastern edge of Collin County, and our crews work the surrounding towns as well. If you’re just outside Princeton, we can still help – we serve McKinney, TX, Fairview, TX, Lucas, TX, and Melissa, TX. The same written price and 365-Day Done Right Promise apply in every city we serve. Call to confirm coverage for your address.

Serving Princeton, TX – Our Local Coverage Area

We serve Princeton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Remodeling Company in Princeton

Ready to get started? Free estimates in Princeton
Call (844) 834-0609

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local construction pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Princeton Customers Say

★★★★★ 5.0 from 4+ reviews

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

How It Works in Princeton

Getting your construction project started is simple.

1

Call or Request a Free Estimate

Tell us about your construction project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A remodeled hall bathroom with subway tile and a floating vanityA garage converted into a guest room and home officeNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA small remodeled galley kitchen with cabinets to the ceilingA remodeled primary bathroom with a soaking tub and walk-in shower

More remodeling services in Princeton

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Princeton. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch