A Bradford company - serving McKinney, TX
A remodeled home with a front porch on a quiet street at golden hour
Murphy, TX

Remodeling Company in Murphy - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one accountable point of contact. Permits handled, and the local pro we connect you with is licensed and insured.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A remodeled staircase with wood treads and a slim metal railing
A finished basement family room with a media wall and wet bar
A remodeled laundry and mudroom with a bench, cubbies and painted cabinets
A built-in window seat in a bay window
A dining nook with a built-in banquette
A finished backyard cottage with a small covered porch
A remodeled primary bathroom with a soaking tub and walk-in shower
A single-story rear room addition with tall windows and a new patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Remodeling Company in Murphy, TX

Murphy is fully built out, so nearly every project here is a remodel, an addition, or a rebuild on a lot that already has a house on it. Most of the homes we work on are 1990s and early-2000s brick builds whose original owners are now ready for a kitchen, a bath, or a better layout. We put the price in writing before any work starts. Call (844) 834-0609 for a free estimate.

Call (844) 834-0609

Why Murphy Homes Are Different

Murphy sits on the North Texas blackland prairie, and the expansive clay under these homes moves with the seasons. That movement shows up in construction as foundation concerns, out-of-level floors, and doors and windows that no longer square up. We plan for it rather than discover it mid-job. Summers are hot and dry, spring brings hail and high wind, and both put real stress on roofs and exteriors. The housing stock is overwhelmingly two-story brick with composition shingle roofs and standard wood-frame construction, which means interior remodels, room additions, and roof or exterior upgrades are the bulk of what gets built. Because there’s almost no vacant land left and Murphy is nearly surrounded by Parker, Wylie, and Plano, work happens on occupied homes with neighbors watching. Staging, driveway protection, and tight-lot logistics get planned before the first board comes off the truck.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Main Murphy Services

Two requests come up more than any other in Murphy: bringing a general contractor in to manage a multi-trade remodel or addition, and reworking the kitchen or bath in a home that’s ready for its second generation of finishes.

General Contractor in Murphy

A general contractor runs the whole job – schedule, trades, inspections, and the paperwork that ties it together. In Murphy that usually means a room addition, a layout change, or a project touching more than one trade, and the clay soil underneath often means foundation work is part of the scope rather than a surprise. We write the scope and price before work begins and coordinate every trade against one schedule. For a project spanning structural, electrical, plumbing, and finish work, start with our General Contractor in Murphy page.

General Contractor in Murphy

Kitchen Remodeling in Murphy

Most Murphy kitchens we see were built with the house in the 1990s or early 2000s, so the cabinets are tired, the lighting is thin, and the layout fights the way people actually cook now. A kitchen remodel here means new cabinetry, counters, backsplash, lighting, and often moving a wall or an island to open the space to the family room. Everything gets specified on paper first, from cabinet brand to counter edge. Our Kitchen Remodeling in Murphy page covers the full scope and pricing.

Kitchen Remodeling in Murphy

Bathroom Remodeling in Murphy

Bathrooms in these homes take a beating from hard water and years of daily use, and the original tile and fixtures are usually past their service life. A Murphy bathroom remodel ranges from a vanity and fixture refresh to a full gut with a walk-in shower, new waterproofing, and updated plumbing rough-in. We plan tile layout and waterproofing details before demolition so there are no mid-job changes. See our Bathroom Remodeling in Murphy page for the full breakdown.

Bathroom Remodeling in Murphy
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 834-0609

Home Remodeling in Murphy

A remodeled living room with built-in shelves around the fireplace

Home remodeling in Murphy almost always means updating a 1990s or early-2000s brick home that the original owners have lived in and are now ready to change. The work isn’t new construction on fresh ground – it’s second-generation remodeling inside a finished neighborhood, which changes how we stage, protect, and sequence the job. Our Home Remodeling work starts with a written scope and price, so you know the number before anything gets torn out.

Home Renovation

Signs you need it

You’re seeing original finishes from the 1990s holding up a house you otherwise love, with a layout that no longer fits how you live.

What it costs in Murphy

A home renovation in Murphy typically runs from about $9,000 for a single-room refresh up to $130,000 for a large addition or whole-house scope, depending on how many rooms and systems are touched.

How we do it

We walk the house, document what stays and what goes, price the scope in writing, then sequence demolition, rough-in, inspection, and finish work room by room so you keep a livable house as long as possible.

Whole House Remodel

Signs you need it

The house works structurally but every room is dated at once, or you’re reworking the floor plan and want one crew managing the whole scope.

What it costs in Murphy

A whole house remodel in Murphy generally falls between $45,000 and $130,000, with structural changes or additions pushing toward the top of that range and cosmetic-only rework landing lower.

How we do it

We build one master schedule across all trades, sequence the work so plumbing and electrical rough-in happen before finishes, pull and pass inspections in order, and protect driveways and staging areas on these tight Murphy lots.

What Home Remodeling Costs in Murphy

Item Typical range in Murphy
Home addition $45,000 – $130,000
Garage conversion $30,000 – $80,000
Kitchen remodel $14,000 – $45,000

Do I need a permit for a home remodel in Murphy?

Yes – most remodels involving structural, electrical, plumbing, or mechanical work in Murphy require a permit and inspection. We pull the permits, coordinate the inspections, and don’t close out a job until they pass.

Can you remodel my Murphy home while we live in it?

In most cases yes. We phase the work and seal off active areas so you keep a functioning kitchen or bath, though whole-house projects sometimes call for a short stay elsewhere during the heaviest demolition.

Brands We Service in Murphy

Our projects specify documented name-brand materials – Schluter waterproofing under tile, Grohe fixtures, GAF roofing on exterior work, among others – so specs are traceable and manufacturer warranties back our own. We don’t stock parts; brands are ordered to the job, which keeps turnaround predictable. See our brands for the full roster.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Remodeling Company in Murphy, TX

Service Typical range in Murphy
Home addition $45,000 – $130,000
ADU construction $90,000 – $220,000
Garage conversion $30,000 – $80,000
Kitchen remodel $14,000 – $45,000
Small kitchen remodel $9,000 – $20,000
Bathroom remodel $9,000 – $28,000
Walk-in shower installation $4,500 – $12,000
Tub-to-shower conversion $3,500 – $10,000

What pushes price up in Murphy is usually structural once walls open – foundation correction over the shifting clay, moving load-bearing walls, or upgrading old wiring and plumbing to meet current code on a 1990s home. Every job gets a written price before work starts, and that number doesn’t move at the door. All completed work carries the 365-Day Done Right Promise, and if it fails inside that window we come back and correct it at no charge.

Neighborhoods We Serve in Murphy

We work throughout Murphy’s 75094 ZIP, on occupied-home remodels where the neighbors are watching and staging has to stay tight. Driveways get protected, dumpsters get placed where they won’t block the street, and cleanup happens daily rather than at job close. Expect a quick callback to set up your free estimate anywhere in the city.

  • Maxwell Creek area
  • Timbers Nature Preserve area
  • Murphy Park and central neighborhoods
  • Lakeside and southern Murphy
  • Homes bordering Parker and Wylie

Service Area – Cities Near Murphy

Murphy is bordered by Parker, Wylie, and Plano, and we regularly take on remodeling work in the towns around it. If you’re just outside the Murphy line, we cover Sachse, TX, Wylie, TX, Fairview, TX, and Lucas, TX. Call to confirm your address and set up a free estimate.

Serving Murphy, TX – Our Local Coverage Area

We serve Murphy and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Remodeling Company in Murphy

Ready to get started? Free estimates in Murphy
Call (844) 834-0609

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local construction pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Murphy Customers Say

★★★★★ 5.0 from 4+ reviews

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

How It Works in Murphy

Getting your construction project started is simple.

1

Call or Request a Free Estimate

Tell us about your construction project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA wide opening with a new beam where the kitchen wall was removedA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityA garage converted into a guest room and home office

More remodeling services in Murphy

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Murphy. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch