







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Garland
Bathroom remodeling in Garland typically runs $9,000 – $28,000 for a full remodel, and $5,000 – $12,000 for a smaller hall bath. If you own a 1950s – 70s brick-veneer ranch off Broadway or near downtown Garland, the number that matters most isn’t the finish package – it’s what’s under the floor and how the work gets documented. We work Garland every week, from the older blocks around 75040 and 75041 to the duplex-heavy streets near 75042, and we know the clay, the cast iron, and the permit trail that goes with a bathroom in this city. Call (844) 834-0609 for a free written estimate.
Why Bradford Remodeling Co McKinney Is Garland’s Preferred Bathroom Remodeling Company

Garland is a remodel-and-repair market, not a new-build one. The housing here went up mostly between 1950 and 1975, and the bathrooms in those homes are reaching the end of their second or third useful life. That shifts the whole job. We scope the drain, check the subfloor and framing, and bring the rough-in up to current code before anyone sets tile. Every price is written before work starts, and every completed project carries the 365-Day Done Right Promise – if it fails inside that year, we come back and correct it at no charge.
Garland customers get background-checked, uniformed technicians, so you know who’s walking through the door before the crew arrives. A live person answers the phone 24/7, not a voicemail. Our technicians have up to 22 years of experience, and they’ve seen what Garland’s expansive blackland clay does to a pier-and-beam bathroom when nobody levels it first.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Bathroom Remodeling Companies in Garland
Bathroom Remodeling Companies working in Garland face a different scope than firms in Frisco or Prosper, because most Garland bathrooms sit over either a pier-and-beam crawlspace or a post-tension slab, and both move with the wet-dry clay cycles. A Garland homeowner needs this work when the tile around the toilet or shower pan starts cracking, when the drain runs slow, or when a 1960s bath simply won’t survive another decade. Full remodels here run $9,000 – $28,000; small bathrooms run $5,000 – $12,000.
When to Call a Remodeler Instead of a Handyman
The moment a job touches the drain, the subfloor, or the electrical rough-in, it belongs with a licensed remodeler, not a handyman. Garland inspectors want plumbing and electrical permits pulled for those changes and signed off before the walls close. A handyman can swap a vanity; he can’t warranty a shower pan over clay-shifted framing.
What a Compliant Scope Includes
A compliant quote names the substrate, the waterproofing membrane, the exhaust fan CFM, and the GFCI locations. It shows the inspection schedule. If a quote doesn’t list those items, the price is missing work, not saving you money.
Bathroom Renovation in Garland

Bathroom Renovation in Garland means bringing a 50- to 70-year-old wet core up to current code and making it hold under North Texas soil movement – and here’s the part most guides miss: because so many Garland bathrooms are original 1950s – 70s tile-over-slab or pier-and-beam wet cores, a compliant remodel usually requires opening the subfloor to address clay-soil movement or corroded cast iron before any new shower pan or tile can be warrantied. That step is rarely needed in the newer metro suburbs, and it’s where a Garland budget can move. Renovation costs land at $9,000 – $28,000 for a full bath and $5,000 – $12,000 for a small one.
Cast Iron Drains and Clay Movement
The original cast-iron drain in a Garland ranch is often corroded or bellied by now. We scope it with a camera before committing to a pan or tile, because a warranty over a failing drain is a promise we can’t keep on your behalf.
Rough-In Upgrades That Pass Inspection
Electrical rough-in means GFCI protection at every wet location and a properly sized exhaust fan vented to the exterior. Plumbing rough-in means new supply lines and a correctly sloped drain. Both get permitted, both get inspected, and both stay documented.
Trusted Brands We Service in Garland
We install a documented roster of name-brand materials so every specification is traceable, including Schluter waterproofing systems, Sterling shower surrounds and bases, Grohe fixtures, and GAF products where exterior work connects. We don’t stock parts locally and we don’t claim to – what we do is source the specified product and install it to the manufacturer’s published instructions, which is what keeps the manufacturer warranty valid alongside our own. That traceability matters in Garland, where an insurance adjuster or a future buyer may ask what membrane went in and when.
Common Bathroom Remodeling Problems We See in Garland Homes
- Tile cracks and shower pans leak within a year. The subfloor was never leveled or repaired after clay-soil movement, and the original cast-iron drain was left in place. The tile is the symptom, not the cause.
- The project stalls mid-remodel. The contract lacked a draw schedule tied to inspection sign-off, and the homeowner finds out too late that the tile and fixture allowances were set unrealistically low.
- A cheap quote skips permits and rough-in upgrades. No GFCI, no properly vented exhaust fan, no inspections. The bathroom fails inspection or can’t be insured without costly change orders.
- Pier-and-beam joists out of level. Common in Garland’s older homes after wet-dry cycles. Setting a shower pan on a deflecting floor is a guaranteed callback.
See the difference
Before
After
Before
After
Before
AfterPricing for Bathroom Remodeling in Garland, TX
Here’s what bathroom work runs in Garland’s market, line by line. These are real ranges, not a teaser. A full bathroom remodel runs $9,000 – $28,000; a small bathroom remodel runs $5,000 – $12,000. What moves the number: whether the subfloor has to open, whether the drain is replaced, tile selection, and how much plumbing moves. A pier-and-beam home with clay movement will sit higher in the range than a slab home with sound framing. We give a written price before any work starts, with a draw schedule tied to inspection sign-off, so nothing moves at the door. Call for a free written estimate.
| Service | Garland Price Range |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
We Also Serve Cities Near Garland
We work the surrounding communities on the same written-price standard: Garland homeowners often ask us about Sachse, Rowlett, Murphy, and Wylie, and those jobs run to the same scope discipline and 365-Day Done Right Promise. If you’re in any of them, call and we’ll give you a straight range for your market.
Serving Garland, TX – Our Local Coverage Area
We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Garland
Yes – plumbing and electrical changes in a Garland bathroom require permits and inspection sign-off. The city inspects the rough-in before walls close, and that signed inspection record is what an insurer or adjuster looks for if you ever file a claim tied to the bathroom.
Interior bathroom work itself doesn’t carry a wind-load requirement, but anything touching the exterior envelope – a vented exhaust termination, a window in a wet wall, or roof-adjacent work – has to meet Garland’s storm and wind-load detailing. That’s where GAF products and proper flashing enter the scope.
You open the subfloor, check the joists for level and rot, and correct the framing before setting any pan or tile. In a pier-and-beam Garland home, leveling and drainage come first; the tile is the last step, not the first. Skip that order and the pan will fail.
A code-compliant Garland quote lists the substrate and waterproofing membrane, GFCI locations, exhaust fan CFM and termination, the permit and inspection schedule, and a draw schedule tied to each inspection. If those items aren’t written down, the quote is incomplete.
A permitted, documented remodel usually helps at claim time because the work is on record with the city, while unpermitted work can complicate a claim. Premium changes vary by carrier; the permit trail is what protects you either way. Call (844) 834-0609 for a free estimate.
Get Your Written Bathroom Remodel Price in Garland

Bradford Remodeling Co McKinney connects Garland homeowners with independent local professionals who do the work, held to The Garrison Standard: a written price before any work starts, background-checked uniformed technicians, and the 365-Day Done Right Promise covering every completed project for a full year. No numbers that move at the door, no surprise invoices, no unfinished site. Call (844) 834-0609 today for a free estimate on Bathroom Remodeling in Garland.
Written by the team at Bradford Remodeling Co McKinney.











