A Bradford company - serving McKinney, TX
A remodeled home with a front porch on a quiet street at golden hour
Anna, TX

Remodeling Company in Anna - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one accountable point of contact. Permits handled, and the local pro we connect you with is licensed and insured.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A remodeled living room with built-in shelves around the fireplace
A whole-home remodel with the living, dining and kitchen areas opened up
A remodeled family room with new windows and a window seat
A remodeled primary suite with built-in wardrobes and a window seat
A remodeled staircase with wood treads and a slim metal railing
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A wide opening with a new beam where the kitchen wall was removed
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Remodeling Company in Anna, TX

Home remodeling in Anna is mostly a story about new houses that need to become the right house. This town is growing fast along the US-75 corridor north of McKinney, and most of the work we do here is on homes built in the last decade or two, where slab foundations, brick veneer, and an open floor plan are the starting point rather than the ending point. What makes an Anna job different is the ground the house sits on: blackland clay that swells when it’s wet and shrinks hard in the summer, so drainage, grading, and the way a slab moves matter on every project. We put the price in writing before any work starts, and every finished job carries our 365-Day Done Right Promise. Call (844) 834-0609 to set up a free estimate.

Call (844) 834-0609

Why Anna Homes Are Different

Most Anna housing went up in the 2000s and later, which means the typical project starts with good bones and a builder-grade finish package. You’re not saving a 1960s floor plan. You’re reworking an open layout that one builder repeated across a few hundred homes, and doing it so your house doesn’t read like the neighbor’s. Large-lot single-family homes with slab-on-grade foundations and brick or stone veneer are the norm, and a lot of them still sit inside a builder warranty window, so the order of operations matters when you alter anything structural.

The ground is the other half of the story. Blackland prairie clay under the slab shrinks and swells through North Texas wet-dry cycles, and the summer heat pulls moisture out of it fast. On the former pasture and ranch parcels being converted into subdivisions around Anna, the soil profile runs deeper and less uniform than it does on older developed land, which is why grading and drainage get as much attention as tile. Houses here also sit inside active HOAs that review exterior changes, so plans need to clear the architectural committee before the first board comes down. Get those two things right – soil and approvals – and the remodel goes quietly.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Main Anna Services

The two calls we get most from Anna homeowners are about opening up a builder-standard kitchen and rebuilding a bathroom that was finished to a price point. Both have their own dedicated pages.

General Contractor in Anna

A general contractor in Anna coordinates the whole job: the trades, the sequencing, the inspections, and the written scope that keeps everybody building to the same drawing. On the new-build-heavy streets here, that usually means tying an addition or a reworked wall system back into a slab-on-grade foundation and a brick veneer exterior without leaving a seam. It also means pulling the permits and scheduling the inspections rather than leaving that to you. We write the price before work starts and hold to it. Read more about our General Contractor in Anna work.

General Contractor in Anna

Kitchen Remodeling in Anna

Kitchens in Anna tend to be the one room where builder-grade shows most: the same cabinet box, the same laminate counter, the same lighting plan as the house two doors down. Reworking one here is usually about opening the wall to the living area, moving the island, and upgrading the surfaces and fixtures to something that holds up. The clay ground underneath doesn’t affect a kitchen directly, but a slab that has moved can throw a cabinet run out of level, and we check for that before anything is ordered. See our Kitchen Remodeling in Anna page for the full scope.

Kitchen Remodeling in Anna

Bathroom Remodeling in Anna

Bathrooms in this housing stock are the second place a builder’s budget shows – a tub/shower combo where a walk-in shower belongs, a vanity that’s undersized for the room. Because Anna homes are mostly newer, the plumbing rough-in is usually sound and the job is a finish-and-fixture rebuild rather than a re-pipe. The tile work is where it gets careful: slab movement under a bathroom floor will telegraph through a rigid tile layout if the substrate isn’t prepped right. Our Bathroom Remodeling in Anna page covers what that prep involves.

Bathroom Remodeling in Anna
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 834-0609

Home Remodeling in Anna

A built-in window seat in a bay window

Home remodeling in Anna usually solves a specific problem: a house that was built fast and finished to a price point, now sitting on ground that moves with the seasons. Homes here are overwhelmingly new – large-lot single-family in subdivisions built since the 2000s, slab-on-grade, brick and stone veneer – so the work is rarely about saving old materials. It’s about taking a builder’s standard layout and making it fit how you actually live, on a foundation that needs watching. If you want the full scope of what we do, our Home Remodeling page lays it out.

Whole House Remodel

Signs you need it

You’re planning to change three or more rooms at once, or the layout fights you every day – a closed-off kitchen, a hallway you don’t need, a primary suite that’s smaller than the house deserves.

What it costs in Anna

A whole-home remodel in Anna is a large project, and the closest supplied figure for a scope this size is our home addition range of $45,000 – $130,000; a full-house rework at the top end runs above that, and we put the exact number in writing after we walk the house.

How we do it

We walk the house with you, write a room-by-room scope and a fixed price, pull the permits, sequence the trades so demolition and rough-in don’t overlap with finish work, and close with a clean site and a signed 365-Day Done Right Promise in your hand.

Home Renovation

Signs you need it

One or two rooms need real work – a kitchen and a bath, a flooring and trim package, or a finish upgrade across the main living area – without touching the structure.

What it costs in Anna

Renovation pricing depends on which rooms are in scope; a kitchen remodel runs $14,000 – $45,000 and a bathroom remodel runs $9,000 – $28,000, so a two-room renovation here typically lands between those figures.

How we do it

We measure the rooms, check the slab and subfloor for movement, write the scope and price, then work room by room so you keep at least one bathroom and a working kitchen through most of the job.

What Home Remodeling Costs in Anna

Item Typical range in Anna
Kitchen remodel $14,000 – $45,000
Bathroom remodel $9,000 – $28,000
Home addition $45,000 – $130,000

Do you pull the permits for a remodel in Anna?

Yes. We pull the permits and schedule the inspections, and we coordinate with your HOA’s architectural review on exterior changes before work begins. On newer Anna homes still inside a builder warranty window, we sequence the work so you don’t void coverage you may still need. Call (844) 834-0609 for a free estimate.

Will the price change once work starts in Anna?

No. You get a written price before any work starts, and that number holds unless you ask us to change the scope in writing. If we open a wall and find something the walk-through couldn’t show, we stop and price it with you before proceeding. Estimates are free.

Brands We Service in Anna

We install and work with a documented roster of name-brand materials – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures, GAF roofing, James Hardie siding, and Therma-Tru doors among them, plus window lines from Boral and PGT. That means every spec is traceable and manufacturer warranties back our own. We don’t stock parts on trucks; materials are ordered to the written scope. See our brands for the full list.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Remodeling Company in Anna, TX

Service Typical range in Anna
Kitchen remodel $14,000 – $45,000
Small kitchen remodel $9,000 – $20,000
Cabinet installation $4,000 – $13,000
Countertop installation $2,000 – $6,500
Backsplash installation $800 – $2,500
Bathroom remodel $9,000 – $28,000
Walk-in shower installation $4,500 – $12,000
Home addition $45,000 – $130,000
Garage conversion $30,000 – $80,000
ADU construction $90,000 – $220,000

What pushes price up in Anna is almost always the ground and the approvals: extra grading or drainage work where the blackland clay sits uneven on a former pasture parcel, and higher-end cabinetry and counter surfaces where you’re upgrading past builder grade. We give you a written price before any work starts, itemized so you can see where the money goes, and it doesn’t move at the door.

Neighborhoods We Serve in Anna

We work throughout Anna and the ZIP 75409 area, including the newer subdivisions going up along the US-75 corridor and the established streets closer to the center of town. Because these are large new-build neighborhoods spreading north, we plan site visits around the drive time from the corridor so you get a firm appointment window rather than a vague “sometime today.” Request a free estimate and we’ll confirm timing for your address.

  • Subdivisions along the US-75 corridor
  • Newer master-planned neighborhoods in north Anna
  • Established streets near the center of Anna
  • Custom homes on larger lots east of US-75

Service Area – Cities Near Anna

Anna sits in a stretch of fast-growing Collin County towns, and we work the whole area. Some of the calls come from neighbors just up or down the corridor: homeowners in Melissa, TX to the south and Princeton, TX to the east are dealing with the same clay and the same new-build finish packages. We also take work in McKinney, TX, the larger city to the south, and Fairview, TX to the east. If you’re unsure whether your address is in range, call and we’ll confirm.

Serving Anna, TX – Our Local Coverage Area

We serve Anna and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Remodeling Company in Anna

Ready to get started? Free estimates in Anna
Call (844) 834-0609

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local construction pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Anna Customers Say

★★★★★ 5.0 from 4+ reviews

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

- Alan M.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

- Cal P.

How It Works in Anna

Getting your construction project started is simple.

1

Call or Request a Free Estimate

Tell us about your construction project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A low-threshold walk-in shower with a bench and grab barA wood double vanity with two mirrors after a bathroom remodelA finished backyard cottage with a small covered porchA remodeled primary bathroom with a soaking tub and walk-in showerA single-story rear room addition with tall windows and a new patioAn open kitchen and dining area after a remodel

More remodeling services in Anna

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Anna. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch