A Bradford company - serving McKinney, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Garland, TX

Bathroom Remodeling in Garland - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Permits handled, and the local pro we connect you with is licensed and insured.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
A low-threshold walk-in shower with a bench and grab bar
A powder room with botanical wallpaper and a stone sink
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A remodeled primary suite with built-in wardrobes and a window seat
A garage converted into a guest room and home office
New painted shaker cabinets with an organized deep drawer
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across Garland

Bathroom remodeling in Garland typically runs $9,000 – $28,000 for a full remodel, and $5,000 – $12,000 for a smaller hall bath. If you own a 1950s – 70s brick-veneer ranch off Broadway or near downtown Garland, the number that matters most isn’t the finish package – it’s what’s under the floor and how the work gets documented. We work Garland every week, from the older blocks around 75040 and 75041 to the duplex-heavy streets near 75042, and we know the clay, the cast iron, and the permit trail that goes with a bathroom in this city. Call (844) 834-0609 for a free written estimate.

Call (844) 834-0609

Why Bradford Remodeling Co McKinney Is Garland’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

Garland is a remodel-and-repair market, not a new-build one. The housing here went up mostly between 1950 and 1975, and the bathrooms in those homes are reaching the end of their second or third useful life. That shifts the whole job. We scope the drain, check the subfloor and framing, and bring the rough-in up to current code before anyone sets tile. Every price is written before work starts, and every completed project carries the 365-Day Done Right Promise – if it fails inside that year, we come back and correct it at no charge.

Garland customers get background-checked, uniformed technicians, so you know who’s walking through the door before the crew arrives. A live person answers the phone 24/7, not a voicemail. Our technicians have up to 22 years of experience, and they’ve seen what Garland’s expansive blackland clay does to a pier-and-beam bathroom when nobody levels it first.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Bathroom Remodeling Companies in Garland

Bathroom Remodeling Companies working in Garland face a different scope than firms in Frisco or Prosper, because most Garland bathrooms sit over either a pier-and-beam crawlspace or a post-tension slab, and both move with the wet-dry clay cycles. A Garland homeowner needs this work when the tile around the toilet or shower pan starts cracking, when the drain runs slow, or when a 1960s bath simply won’t survive another decade. Full remodels here run $9,000 – $28,000; small bathrooms run $5,000 – $12,000.

When to Call a Remodeler Instead of a Handyman

The moment a job touches the drain, the subfloor, or the electrical rough-in, it belongs with a licensed remodeler, not a handyman. Garland inspectors want plumbing and electrical permits pulled for those changes and signed off before the walls close. A handyman can swap a vanity; he can’t warranty a shower pan over clay-shifted framing.

What a Compliant Scope Includes

A compliant quote names the substrate, the waterproofing membrane, the exhaust fan CFM, and the GFCI locations. It shows the inspection schedule. If a quote doesn’t list those items, the price is missing work, not saving you money.

Bathroom Renovation in Garland

A galley kitchen opened up to the dining room with a new peninsula

Bathroom Renovation in Garland means bringing a 50- to 70-year-old wet core up to current code and making it hold under North Texas soil movement – and here’s the part most guides miss: because so many Garland bathrooms are original 1950s – 70s tile-over-slab or pier-and-beam wet cores, a compliant remodel usually requires opening the subfloor to address clay-soil movement or corroded cast iron before any new shower pan or tile can be warrantied. That step is rarely needed in the newer metro suburbs, and it’s where a Garland budget can move. Renovation costs land at $9,000 – $28,000 for a full bath and $5,000 – $12,000 for a small one.

Cast Iron Drains and Clay Movement

The original cast-iron drain in a Garland ranch is often corroded or bellied by now. We scope it with a camera before committing to a pan or tile, because a warranty over a failing drain is a promise we can’t keep on your behalf.

Rough-In Upgrades That Pass Inspection

Electrical rough-in means GFCI protection at every wet location and a properly sized exhaust fan vented to the exterior. Plumbing rough-in means new supply lines and a correctly sloped drain. Both get permitted, both get inspected, and both stay documented.

Trusted Brands We Service in Garland

We install a documented roster of name-brand materials so every specification is traceable, including Schluter waterproofing systems, Sterling shower surrounds and bases, Grohe fixtures, and GAF products where exterior work connects. We don’t stock parts locally and we don’t claim to – what we do is source the specified product and install it to the manufacturer’s published instructions, which is what keeps the manufacturer warranty valid alongside our own. That traceability matters in Garland, where an insurance adjuster or a future buyer may ask what membrane went in and when.

Common Bathroom Remodeling Problems We See in Garland Homes

  • Tile cracks and shower pans leak within a year. The subfloor was never leveled or repaired after clay-soil movement, and the original cast-iron drain was left in place. The tile is the symptom, not the cause.
  • The project stalls mid-remodel. The contract lacked a draw schedule tied to inspection sign-off, and the homeowner finds out too late that the tile and fixture allowances were set unrealistically low.
  • A cheap quote skips permits and rough-in upgrades. No GFCI, no properly vented exhaust fan, no inspections. The bathroom fails inspection or can’t be insured without costly change orders.
  • Pier-and-beam joists out of level. Common in Garland’s older homes after wet-dry cycles. Setting a shower pan on a deflecting floor is a guaranteed callback.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Bathroom Remodeling in Garland, TX

Here’s what bathroom work runs in Garland’s market, line by line. These are real ranges, not a teaser. A full bathroom remodel runs $9,000 – $28,000; a small bathroom remodel runs $5,000 – $12,000. What moves the number: whether the subfloor has to open, whether the drain is replaced, tile selection, and how much plumbing moves. A pier-and-beam home with clay movement will sit higher in the range than a slab home with sound framing. We give a written price before any work starts, with a draw schedule tied to inspection sign-off, so nothing moves at the door. Call for a free written estimate.

Service Garland Price Range
Bathroom Remodel $9,000 – $28,000
Small Bathroom Remodel $5,000 – $12,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Shower Replacement $3,000 – $8,500
Bathroom Vanity Installation $800 – $3,000

We Also Serve Cities Near Garland

We work the surrounding communities on the same written-price standard: Garland homeowners often ask us about Sachse, Rowlett, Murphy, and Wylie, and those jobs run to the same scope discipline and 365-Day Done Right Promise. If you’re in any of them, call and we’ll give you a straight range for your market.

Serving Garland, TX – Our Local Coverage Area

We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Bathroom Remodeling in Garland

Get Your Written Bathroom Remodel Price in Garland

A remodeled family room with new windows and a window seat

Bradford Remodeling Co McKinney connects Garland homeowners with independent local professionals who do the work, held to The Garrison Standard: a written price before any work starts, background-checked uniformed technicians, and the 365-Day Done Right Promise covering every completed project for a full year. No numbers that move at the door, no surprise invoices, no unfinished site. Call (844) 834-0609 today for a free estimate on Bathroom Remodeling in Garland.

Written by the team at Bradford Remodeling Co McKinney.

Why Garland Chooses Bradford Remodeling Co McKinney

We set the standard for bathroom remodeling in Garland.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Garland

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Garland Customers Say

Trusted by homeowners across Garland and surrounding areas.

★★★★★

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

Alan M.
★★★★★

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

Tricia S.
★★★★★

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

Cal P.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A finished basement family room with a media wall and wet barA walk-in pantry with wood shelvingA remodeled laundry and mudroom with a bench, cubbies and painted cabinetsA built-in window seat in a bay windowA dining nook with a built-in banquetteA single-story rear room addition with tall windows and a new patio

More remodeling services in Garland

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Garland?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Garland.

(844) 834-0609

Request a Free Estimate in Garland

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch