







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Melissa
If you’ve priced a bathroom remodel in Melissa, TX and gotten three wildly different numbers, you’re not alone. Most full bathroom remodels here run $9,000 – $28,000, and the gap between bids usually comes down to what’s behind the drywall, not the tile you picked. We work with homeowners throughout 75454 – from the newer phases off US 75 to established blocks near the Melissa city core – and we know the construction rhythm this town runs on. Call (844) 834-0609 for a free estimate, and you’ll get a written, line-item price before a single tool comes out.
Why Bradford Remodeling Co McKinney Is Melissa’s Preferred Bathroom Remodeling Company

Melissa is a fast-growing Collin County town, and that shapes everything about how we work here. New subdivisions are pushing north of the existing core, so most bathrooms we see were finished in the last few years and still carry original builder finishes. That’s a different job than remodeling a 1980s bath, and it needs a crew that understands new-home construction as well as renovation.
We’re part of the Garrison Partners family and held to The Garrison Standard: every price is written before work starts, every technician is background-checked and uniformed, and a live person answers the phone around the clock. Our technicians have up to 22 years of experience, and every completed project carries the 365-Day Done Right Promise – if the work fails inside a full year, we return and correct it at no charge.
Homeowners in Melissa call us because the first number they hear is the number they pay. No repricing at the door, no surprise line items after demolition. The written price and the written guarantee are both in your hand at job close, along with a clean site.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
One Day Bath Remodel in Melissa
A One Day Bath Remodel in Melissa is exactly what the name says: a single-day refresh that replaces the fixtures and surfaces homeowners notice most, skipping full demolition. It fits the newer builder-grade bath where the layout works fine but the cultured marble and stock hardware feel dated from day one. Typical scope covers a vanity swap, fixtures, and surface updates; a small bathroom remodel of this kind runs $5,000 – $12,000 in Melissa, and a vanity installation alone is $800 – $3,000. This is not a shower rebuild – if the pan is cracked or the valve needs replacing, you’re into a multi-day job and we’ll tell you plainly on the walkthrough.
What a One Day Bath Covers
Vanity and countertop, faucet and fixtures, mirror, lighting, and paint – the visible layer. We don’t touch the rough-in or the subfloor on a one-day job. If anything behind the wall looks compromised, the scope changes in writing before we continue.
When a Faster Refresh Makes Sense
If the tile is sound, the shower drains clean, and the layout stays put, a one-day refresh gives you the biggest visual change per dollar. Most newer Melissa homes fit that description. Homes with visible caulk separation at the surround should get the wall opened first.
Bathroom Remodeling Contractor in Melissa

Hiring a Bathroom Remodeling Contractor in Melissa means hiring someone who knows that bathrooms here sit on post-tension slabs over expansive clay. That clay moves between wet and dry seasons, and a tile job that ignores it will crack at the grout lines within a couple of years. A full remodel runs $9,000 – $28,000 here, with walk-in shower installation at $4,500 – $12,000 and tub-to-shower conversion at $3,500 – $10,000. The written price locks the scope before demolition, and any change gets a change order you approve in writing first.
Sequencing Permits and Inspections
Permits get pulled, and rough-in inspections happen before the drywall closes. In Melissa’s newer plats, inspection scheduling follows the town’s own pace, so we build that into the timeline rather than promising a date we can’t hold. Skipping the inspection is a problem at resale – buyers’ inspectors flag unpermitted work.
Working Around Builder Warranties
If your home is still under the original builder warranty, moving a load-bearing wall or altering the rough-in without written approval can void it. We keep the structural work untouched where the warranty matters and document everything we do, so the protection survives the remodel.
Trusted Brands We Service in Melissa
We specify from a documented roster: KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures. On exterior-adjacent work and window-related bath projects, Boral and PGT products come up, and CWS supplies show up in our specs where they fit the build. These are materials with manufacturer specs and warranties that back our own guarantee. We don’t stock parts on a truck, and we won’t tell you otherwise – what we do is order the right product with a known lead time and schedule the install around it, so turnaround stays predictable. Call (844) 834-0609 to talk through specs.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Melissa Homes
- Caulk separation at cultured marble surrounds. As the clay soil shifts seasonally, the joint between surround and tub or pan opens. Left alone, water gets behind the panel and the fix grows from caulk to new surround.
- Cracked shower pans from slab deflection. A post-tension slab that flexes slightly can crack a fiberglass pan. The repair isn’t a patch – it’s a waterproofed shower system with a crack-isolation membrane underneath.
- Builder-grade stock oak vanities. These are the first thing homeowners replace. The wood veneer and hardware age fast, and the size rarely matches what the room can actually hold.
- Unpermitted prior work from resale flips. In a fast-building town, some bathrooms get touched up before a sale without inspection. Buyers’ inspectors catch it, and the cost lands on the new owner.
Pricing for Bathroom Remodeling in Melissa, TX
Melissa bathroom pricing reflects the clay soil and newer housing stock: tile work here needs a crack-isolation membrane over the post-tension slab, and that’s a real line item. A full remodel runs $9,000 – $28,000. A small bathroom remodel is $5,000 – $12,000, walk-in shower installation is $4,500 – $12,000, and tub-to-shower conversion is $3,500 – $10,000. Shower replacement alone is $3,000 – $8,500. Vanity installation is $800 – $3,000. What moves the number: tile selection, glass enclosures, moving plumbing, and whether the rough-in needs correction. Every estimate is free, and the price is written before work starts – call (844) 834-0609.
| Service | Price Range (Melissa) |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
We Also Serve Cities Near Melissa
We work with homeowners in Anna, McKinney, Princeton, and Fairview, along with our Bathroom Remodeling in Melissa service area. If you’re in any of these and want a written price, our Bathroom Remodeling team handles the same disciplined process throughout the region. Call (844) 834-0609 to get one scheduled.
Serving Melissa, TX – Our Local Coverage Area
We serve Melissa and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Melissa
It can, if you move a load-bearing wall or alter the plumbing rough-in without written approval from the original builder. A cosmetic remodel – tile, vanity, fixtures – usually stays clear of warranty terms, but always confirm the specific language in your builder’s documents first. We sequence the work to protect the warranty where it’s still active and document everything we touch. Call (844) 834-0609 and we’ll walk through your situation before we quote.
Most bathroom remodels that move plumbing, electrical, or structural elements require a permit and rough-in inspection from the town before the drywall closes. A cosmetic swap like a vanity or fixtures typically doesn’t. We pull the permit and schedule the inspection as part of the job, so nothing gets flagged at resale. Call (844) 834-0609 to confirm what your project needs.
Measure the wall clearance on both sides of the current vanity and leave 15 inches minimum between the vanity edge and the toilet or shower. Most builder-grade baths in Melissa fit a 48- to 60-inch vanity. A vanity installation runs $800 – $3,000 depending on size and countertop. Call (844) 834-0609 for a free measurement and a written price.
Shower replacement in Melissa runs $3,000 – $8,500, with a walk-in shower installation at $4,500 – $12,000 when you add frameless glass and a new valve. Cultured marble goes to tile, the pan gets a waterproofed system, and a crack-isolation membrane goes over the slab. Call (844) 834-0609 for an exact quote – estimates are free.
Interior work usually doesn’t require HOA approval, but any exterior change – window, vent, or added skylight – almost always does. Some Melissa HOAs also require notification for permitted interior projects. We’ll tell you what to check before we start. Call (844) 834-0609 and we’ll help you sort the paperwork from the work.
If your Melissa bathroom is due for a real upgrade, start with the number, not the sales pitch. Call (844) 834-0609 for a free estimate, and we’ll put a written price and the 365-Day Done Right Promise in your hand before anyone picks up a tool.
Written by the team at Bradford Remodeling Co McKinney.











