







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable General Contractor Across Melissa
If you’re planning a remodel or an addition in Melissa, the first question is usually cost, and the second is who to trust with it. Most Melissa general contracting work here runs from a $9,000 small kitchen refresh up to $130,000 for a full home addition, and every project we take on starts with a written price before a single tool comes out. We work in the newer subdivisions off US 75, we know how fast Collin County inspectors move through this town, and we know what the engineered foundations under these homes will and won’t allow. Call (844) 834-0609 and a live person picks up, day or night.
Why Bradford Remodeling Co McKinney Is Melissa’s Preferred General Contractor Company

Melissa homeowners have been burned before. A crew that no-shows, a price that grows at the door, a job left half-finished with the site a mess. That’s the pattern The Garrison Standard exists to break, and it’s why we put every number in writing before work starts, background-check every technician who walks through your door, and back each completed project with the 365-Day Done Right Promise. If the work fails inside that first year, we come back and correct it at no charge.
Our technicians bring up to 22 years of experience to Melissa jobs, from builder-grade kitchen swaps to garage conversions with structural review. We answer the phone with a real person 24 hours a day, not a voicemail queue. When you call about a project on a lot north of the existing core, you get a straight answer about scope, inspection timing, and what the finished work will cost. That’s the whole pitch: squared away from the first estimate to the signed guarantee in your hand at close.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Construction Company in Melissa
A Construction Company working in Melissa does more than hang drywall. Here the job is shaped by what’s underneath: new single-family homes on expansive clay, post-tension slabs poured to an engineer’s design, and subdivisions still expanding north of the town’s original core. When a Melissa homeowner wants to remove a load-bearing wall, convert a garage, or pour a new patio slab, the work has to account for that engineered foundation or it won’t pass review. Home additions in Melissa typically run $45,000 – $130,000, and garage conversions land between $30,000 – $80,000.
Foundation and Structural Work
Because the clay here shifts hard between wet and dry seasons, builders won’t pour without a soil test, and post-tension slabs are standard even in new construction. Any remodel that touches a load-bearing element needs the foundation design verified first, with engineered drawings and sequenced inspections before demolition starts.
Additions and Conversions
A home addition or garage conversion in a newer Melissa subdivision almost always needs a revised scope, structural review in the permit, and careful sequencing so you don’t void the builder’s warranty. We pull the permits, pass the inspections, and document every stage.
Remodeling Contractor in Melissa

A Remodeling Contractor in Melissa spends most of the first conversation on the same topic: builder-grade finishes. These homes are new, and the cabinets, countertops, and fixtures that came with them are the first things owners want replaced. A full kitchen remodel in Melissa runs $14,000 – $45,000, a small kitchen remodel $9,000 – $20,000, and a bathroom remodel $9,000 – $28,000. Every one of those starts with a written line-item price, and the brand roster is documented: KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures.
Kitchens and Baths
Most Melissa kitchen upgrades start with the cabinet boxes and the countertop, since those are the builder-grade items that wear first. We spec products with manufacturer specs and warranties, so what goes in is traceable and covered on both ends.
Working Around the Warranty
Newer homes often still carry a builder warranty, and an unapproved structural or foundation change can void it. We check what’s covered before the first cut, plan the scope around it, and keep the paper trail clean.
Trusted Brands We Service in Melissa
We work with a documented roster of name-brand materials so specifications are traceable and quality isn’t left to guesswork. That includes Boral and PGT products on exterior and window work, and CGI and CWS materials where the scope calls for them, alongside KraftMaid, Wellborn, Cambria, Kohler, GAF, James Hardie, and Therma-Tru. We don’t stock parts locally, and we don’t pretend to. What we do is specify the right product for the job, order it against the written scope, and turn it around without the guesswork that drags a Melissa remodel into a second month.
See the difference
Before
After
Before
After
Before
AfterCommon General Contractor Problems We See in Melissa Homes
- Remodels that void the builder warranty. In Melissa’s newer subdivisions, homeowners often start work before checking what the builder warranty covers. An unapproved foundation or structural modification can kill that coverage, and the fix comes out of your pocket.
- HOA stop-work orders. Master-planned communities here enforce architectural review rules, and a crew that skips the approval gets the job shut down mid-build. Revisions and re-inspection cost real money and weeks.
- Concrete poured without a soil test. The expansive clay under Melissa shifts dramatically between wet and dry seasons, so a new slab poured without a soil test is a foundation problem waiting to happen.
- Load-bearing changes on an engineered foundation. New homes sit on post-tension slabs and piers, and a wall removal that ignores that design fails structural review. The scope has to be revised before demolition, not after.
Pricing for General Contractor in Melissa, TX
Here’s what the common first upgrades cost in Melissa’s market. A small kitchen remodel runs $9,000 – $20,000, a full kitchen remodel $14,000 – $45,000, and a bathroom remodel $9,000 – $28,000. Larger structural work runs higher: a home addition lands between $45,000 – $130,000, and a garage conversion between $30,000 – $80,000. What moves the number is foundation and structural review, permit and inspection timing, and the materials you choose. We give you a written price before any work starts, and that number doesn’t move at the door. Call (844) 834-0609 for a free estimate with a line-item breakdown.
| Project | Typical Melissa Range |
|---|---|
| Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Bathroom Remodel | $9,000 – $28,000 |
| Home Addition | $45,000 – $130,000 |
| Garage Conversion | $30,000 – $80,000 |
We Also Serve Cities Near Melissa
We take on projects across the surrounding Collin County area, including Anna, McKinney, Princeton, and Fairview. If you’re just outside Melissa and the work involves the same expansive clay and newer housing stock, the planning approach carries over. Learn more about our General Contractor services or see what we do for General Contractor in Melissa. Call for a free estimate in any of these towns.
Serving Melissa, TX – Our Local Coverage Area
We serve Melissa and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About General Contractor in Melissa
Yes. Kitchen remodels in Melissa that touch plumbing, electrical, or structural elements require a permit and inspection, and the town’s inspection schedule runs on its own rhythm as new plats come online. We pull the permits and pass the inspections as part of the written scope. Call (844) 834-0609 for an exact quote on your kitchen.
Keep the structural and foundation elements untouched, and route any change through the builder’s approval process before you start. Finish-level work like cabinets, countertops, and fixtures usually sits outside the structural warranty, which is where most Melissa upgrades belong. We verify what’s covered before the first cut. Estimates are free.
A small kitchen remodel in Melissa typically runs $9,000 – $20,000, and a full kitchen remodel $14,000 – $45,000. Cabinet and countertop replacement drives most of the cost, with KraftMaid and Wellborn boxes and Cambria or Caesarstone surfaces among the documented options. Call (844) 834-0609 for an exact line-item quote.
Master-planned communities in Melissa enforce architectural review, and a crew that skips approval can trigger a stop-work order and costly revisions. We check the HOA rules before the scope is finalized so the plan clears review the first time. Call for a free estimate and we’ll walk the requirements with you.
Melissa’s expansive clay shifts hard between wet and dry seasons, so additions here need proper soil testing and an engineered foundation design, often with piers and a post-tension slab. An engineer’s drawings and sequenced inspections keep the work sound and the builder warranty intact. Call (844) 834-0609 to plan your addition.
Every project we take on in Melissa closes the same way: a clean site, a documented scope, and a signed written guarantee in your hand. That’s the 365-Day Done Right Promise, and it holds for a full year after the last tool leaves. Call (844) 834-0609 today for a free estimate with a written price before any work starts.
Written by the team at Bradford Remodeling Co McKinney.











