A Bradford company - serving McKinney, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
Kitchen Remodeling · Melissa, TX

Kitchen Remodeling in Melissa - Fixed Price, Set Finish Date

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Permits handled, and the local pro we connect you with is licensed and insured.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
A small remodeled galley kitchen with cabinets to the ceiling
A walk-in pantry with wood shelving
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A galley kitchen opened up to the dining room with a new peninsula
A wide opening with a new beam where the kitchen wall was removed
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled primary suite with built-in wardrobes and a window seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Kitchen Remodeling Across Melissa

Kitchen remodeling in Melissa typically runs $14,000 to $45,000, and most of the kitchens we see here don’t need a gut job. They need the builder-grade finishes swapped out and the layout kept intact. That’s the first-upgrade cycle running through every subdivision north of the existing core along US 75.

Call (844) 834-0609

We know this town’s rhythm. New plats mean inspections move on the county’s schedule, not yours, and homes still inside a builder warranty need work that doesn’t touch what the builder still covers. When you call (844) 834-0609, a live person answers and we start with a written price before a single tool comes out.

Why Bradford Remodeling Co McKinney Is Melissa’s Preferred Kitchen Remodeling Company

Installers leveling a new base cabinet during a kitchen remodel

The homeowners who call us in Melissa have usually been through a no-show or a surprise invoice somewhere else. They want a number in writing and a crew that shows up when scheduled. That’s the whole reason we run on The Garrison Standard: every price and every guarantee documented before work starts, and the 365-Day Done Right Promise covering each completed project for a full year. If the work fails inside that window, we come back and correct it at no charge.

Our technicians have up to 22 years of experience, and every person who walks through your door is background-checked and uniformed. Identity matters when a stranger walks into your home on a Tuesday morning, and the standards are set at the Garrison Partners level, not left to individual job sites. We handle cabinets, counters, backsplash, islands, and full design work across the kitchens in Melissa, from first-upgrade refreshes in Zip 75454 to partial remodel work for owners who bought a newer home that needs the finish line crossed.

Response time across Melissa is straightforward: call us, and we’ll work around the inspection and construction schedule that keeps this town busy. When a project requires a permit and inspection, we’re ready for that, and the local pro is licensed and insured as the state requires. Our pricing comes with a written commitment, always.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Kitchen Design in Melissa

Kitchen Design in Melissa starts with a reality check most homeowners here appreciate: how much of the existing kitchen is worth keeping. Because the housing stock is overwhelmingly builder-grade construction from the last two decades, most design work here isn’t about gutting an old kitchen. It’s about reworking the finish package on a sound box.

We look at the cabinet boxes, subfloor, and plumbing rough-in first. If they’re sound, we design a semi-custom front, quartz or granite tops from Cambria or Caesarstone, and a tile backsplash that runs wall to wall without opening the layout. Design work for a Melissa first upgrade runs within the $14,000 – $45,000 full-remodel band, with a partial scope landing lower. A written design and price comes before any cabinet is ordered.

Working With the Existing Layout

Keeping the load-bearing layout alone is what protects a builder warranty in a still-active Melissa development. We design around the plumbing and structural elements the builder still covers, so nothing gets touched that would trigger a warranty claim.

Material and Finish Selection

We work from a documented roster of name-brand materials so specifications stay traceable. Cabinetry comes from KraftMaid and Wellborn, surfaces from Cambria and Caesarstone, fixtures from Kohler and Moen, so the design has real product names attached, not allowances left vague until selection day.

Kitchen Renovation in Melissa

A remodeled living room with built-in shelves around the fireplace

Kitchen Renovation in Melissa usually means re-facing or replacing cabinet doors and drawer fronts, dropping in new counters, and resetting the backsplash, all without a full tear-out. Where a Melissa homeowner wants a new island or a partial rework, that scope lives here too. A full kitchen renovation in Melissa runs $14,000 – $45,000, and a small or partial kitchen remodel runs $9,000 – $20,000. A typical renovation call starts with builder-grade boxes and laminate counters in a home less than fifteen years old, where the homeowner wants semi-custom fronts and stone tops while steering away from structural changes.

We confirm the existing boxes, subfloor, and plumbing rough-in are sound enough to keep, then re-face or replace doors and fronts while leaving the load-bearing layout alone so the warranty stays intact. Where HOA or architectural approval is required, we verify it before ordering materials so the project doesn’t stall at inspection sign-off.

Refacing Versus Full Replacement

Most Melissa first-upgrade kitchens only need doors, drawer fronts, and counters. A full tear-out needlessly risks the warranty. Cabinet installation runs $4,000 – $13,000 depending on whether we’re refacing or replacing the run.

Counters, Backsplash, and Islands

Countertop installation runs $2,000 – $6,500. A quartz or granite island runs $3,000 – $10,000, and backsplash installation runs $800 – $2,500. We size each line item in writing before a material gets ordered.

Trusted Brands We Service in Melissa

We specify from a documented roster of premium brands so quality is traceable. That means Schluter waterproofing systems under tile, Grohe and Kohler fixtures, and GAF products where the work touches the exterior. We don’t claim to stock parts locally. What we do is specify real brands with manufacturer specs and warranties backing our own guarantee, then order materials against a signed written price. Turnaround on a first-upgrade kitchen is generally faster than a full gut remodel because the finish package is what’s changing, not the bones of the house.

Common Kitchen Remodeling Problems We See in Melissa Homes

  • Replacing the whole cabinet run without checking the boxes. A Melissa builder-grade kitchen usually only needs doors, drawer fronts, and counters. A full tear-out needlessly risks the warranty.
  • Pulling permits for plumbing or electrical without coordinating with the builder. In homes still inside their builder warranty, this voids coverage on rough-in and structural elements the warranty still covers.
  • Skipping HOA/architectural committee approval on exterior-visible changes. A backsplash visible through a window, exterior venting, or a layout change can get stopped mid-project at inspection sign-off if approval wasn’t secured first.
  • Signing a contract with vague allowances on countertops and cabinets. The change order at material selection shocks the budget on a first-upgrade kitchen. We write the price before work starts to prevent that.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Kitchen Remodeling in Melissa, TX

Here’s what a Melissa kitchen remodel actually runs, and we put it in writing before any work starts. A full kitchen remodel runs $14,000 – $45,000. A small or partial kitchen remodel runs $9,000 – $20,000. Cabinet installation runs $4,000 – $13,000. Countertop installation runs $2,000 – $6,500. Backsplash installation runs $800 – $2,500. A kitchen island installation runs $3,000 – $10,000.

What moves the number: whether you reface or replace cabinet boxes, whether you keep the layout intact, and which counter material you select. Keeping the load-bearing layout alone usually keeps the project in the lower half of the band. Every estimate is free, and every price is a written number with no change orders at the door.

Item Melissa Price Range
Kitchen Remodel $14,000 – $45,000
Small Kitchen Remodel $9,000 – $20,000
Cabinet Installation $4,000 – $13,000
Countertop Installation $2,000 – $6,500
Backsplash Installation $800 – $2,500
Kitchen Island Installation $3,000 – $10,000

We Also Serve Cities Near Melissa

We also work in the neighboring towns around here: Anna, McKinney, Princeton, and Fairview. If you’re on the edge of a new plat or just across the line, the same written pricing and 365-Day Done Right Promise apply. Our Kitchen Remodeling team handles every first-upgrade and partial rework across the area. Call (844) 834-0609 to schedule a free estimate, and we’ll bring the same crew chief ethos to your kitchen.

Serving Melissa, TX – Our Local Coverage Area

We serve Melissa and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Kitchen Remodeling in Melissa

Schedule Your Free Melissa Kitchen Remodeling Estimate

A single-story rear room addition with tall windows and a new patio

Call (844) 834-0609 to schedule your free estimate. We’ll put the price in writing, spell out exactly what the 365-Day Done Right Promise covers and for how long, and confirm the scope before a single tool comes out. When the job is squared away, you get a clean site, a documented scope, and a signed written guarantee in your hand. Whether you’re re-facing builder-grade cabinets in a newer Melissa development or planning a fuller Kitchen Remodeling in Melissa, we’ll give you the straight number first.

Written by the team at Bradford Remodeling Co McKinney.

Why Melissa Chooses Bradford Remodeling Co McKinney

We set the standard for kitchen remodeling in Melissa.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Melissa

Getting your kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Melissa Customers Say

Trusted by homeowners across Melissa and surrounding areas.

★★★★★

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

Alan M.
★★★★★

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

Tricia S.
★★★★★

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

Cal P.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A second-story addition that matches the existing rooflineA walk-in shower with large-format tile and a built-in nicheA remodeled family room with new windows and a window seatA garage converted into a guest room and home officeA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled staircase with wood treads and a slim metal railing

More remodeling services in Melissa

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Kitchen Remodeling in Melissa?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Melissa.

(844) 834-0609

Request a Free Estimate in Melissa

Tell us about your kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch