







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWalk-In Shower Cost in McKinney, TX: What Moves the Number
A walk-in shower in a McKinney home costs between $6,500 and $18,000 installed. Our benchmark range for the wider bathroom work that includes it runs $9,000-$28,000. If a contractor hands you a range that wide and stops there, you’ve learned nothing. Call (844) 834-0609 and we’ll tell you which of three tiers your shower actually falls into, with the line items behind it – including the one about your slab that most crews don’t bring up until demo day.

Why the Drain Is the First Question, Not the Tile
Most walk-in shower quotes ignore the single biggest cost variable in McKinney. If your new shower position moves the drain more than 12 inches, someone has to core through a post-tension slab – and that means pulling the tensioning map from the original engineer first, then core-drilling on that guide. No map, no safe cut. In Collin County this step runs $800-$2,200, and it’s non-negotiable.
That’s why we quote the drain scenario before we quote a single tile. When the scope needs it, it goes into the written price at signing – not onto a change order after the floor is open. Homeowners in Stonebridge Ranch and Craig Ranch sit on post-tension slabs from the 1990s through the 2010s, so this question comes up on most of the showers we look at, not a few.
Slab conditions feed the spec on the other end too. Blackland Prairie clay swells and shrinks hard through the North Texas wet-dry cycle, and a shower pan poured on a moving slab has no room for sloppy slope. The correct spec for a curbless shower is 1/4 inch per foot to a linear drain, and that slope gets set in the mortar bed before tile – never corrected with grout later.
The Three Real McKinney Cost Tiers
Here’s how the numbers actually break down. We tell you which tier applies before work begins, in writing:
| Scope Tier | What’s Included | Cost Range |
|---|---|---|
| In-place conversion | Keeps the existing drain footprint; Kohler or Moen fixtures; Cambria or Caesarstone surround panel | $6,500-$9,000 |
| Drain relocation + custom tile | Post-tension slab map and core drill; custom tile; frameless glass; linear drain | $10,500-$14,000 |
| Full reconfiguration | Reworked layout; heated floor; body sprays; niche and bench detail | $15,000-$18,000+ |
Line-item detail matters when you’re comparing bids. A $400 “allowance” for a shower valve is a placeholder, not a price – it turns into a change order the moment you pick a thermostatic trim. Our written quotes name the Kohler or Moen model number outright. No “owner-supplied,” no allowance numbers that drift.
The curbless, zero-threshold shower is the request we hear most in McKinney’s aging-in-place market. Done right, it’s a slope spec in the mortar bed and a linear drain located so water reaches it without pooling. Done wrong, it’s a grout repair call every few months. We’d rather spend the extra day on the pan and skip that call.

What the 365-Day Done Right Promise Covers on a Shower
Every completed project we finish carries the 365-Day Done Right Promise – a full-year written guarantee. If the work fails inside that window, we come back and correct it at no charge. On a shower, the guarantee specifies three exact failure modes: grout cracking, door seal failure, and water intrusion at the shower pan. Not a vague “we’ll make it right.” Named items, one year, in writing.
Because a shower pan is a sealed system you can’t see into, that specific list matters more here than on almost any other job. Our technicians have up to 22 years of experience, but the discipline is the point: every job carries background-checked, uniformed technicians, and a live person – not a voicemail – answers the phone 24 hours a day, seven days a week.
The rest of the bathroom gets the same treatment. If the shower pulls a vanity swap and lighting along with it, see our Bathroom Remodeling page for how the full room is scoped and priced.
Common Local Scenarios (and What They Add)
The price swings on the details. These are the recurring ones:
- Historic downtown McKinney. A shower reconfigured inside the preservation district around the 1800s courthouse square can trigger design review for exterior-visible work. We flag it at estimate stage so it never lands as a surprise mid-build.
- 1990s-2010s tract home. In Stonebridge Ranch or Craig Ranch, the shower pan sits on a slab that’s been through twenty to thirty years of clay movement. Cracking and out-of-level floors show up; the slope gets re-specified, not grouted over.
- Tub out, shower in. Pulling a tub opens the drain footprint. That’s often where the relocation cost appears. If you’re weighing the two, our tub-to-shower conversion page covers the trade-offs.
- Curbless for aging in place. Adds slope and linear-drain work up front; saves the retrofit later.
How We Quote It
The Garrison Standard is the framework behind every estimate: a written price before any work starts, non-negotiable, and a signed written guarantee in your hand at close. Bradford Remodeling operates as part of the Garrison Partners family, independently owned and operated, and every project is held to that same standard. KraftMaid, Wellborn, Cambria, Kohler and Moen sit on our documented roster, so specs are traceable and quality isn’t guesswork.
If you’re thinking through the whole room, our Bathroom Remodeling in McKinney page is the deeper walk-through, and the home page shows the broader scope of what we build across McKinney and the surrounding suburbs.
Frequently Asked Questions
A walk-in shower in McKinney runs $6,500-$18,000 installed, and our wider benchmark for the bathroom work around it is $9,000-$28,000. In-place conversions that keep the existing drain land at the low end; drain relocation with custom tile and linear drain sits mid-range; full reconfiguration with heated floor and body sprays tops out at $18,000+. Call (844) 834-0609 for an exact quote – estimates are free and the price comes in writing.
Yes. Moving a shower drain more than 12 inches in a McKinney post-tension slab adds $800-$2,200 in Collin County, because it requires an engineer’s slab map and a core drill routed through it. It isn’t optional for safe work – schedule a free estimate at (844) 834-0609 and we’ll tell you whether your layout needs it.
For aging-in-place households in McKinney, a curbless shower is usually worth it – it removes the step-over and holds up over time when the 1/4-inch-per-foot slope is set in the mortar bed to a linear drain. Correct up-front slope means no recurring grout fixes. Call (844) 834-0609 to price the linear-drain version against your current layout.
Our 365-Day Done Right Promise is a full-year written guarantee covering three named shower failures: grout cracking, door seal failure, and water intrusion at the shower pan. If any of those appear within the year, we return and correct them at no charge. Reach us at (844) 834-0609 – a live person answers, day or night.
Ready to get a real number instead of a useless range? Bradford Remodeling Co McKinney gives you a written price before any work starts, backed by the 365-Day Done Right Promise. Call (844) 834-0609 for your free estimate today.
Written by the team at Bradford Remodeling Co McKinney, serving McKinney, TX.
What Our Customers Say
"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."
- Tricia S."Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."
- Cal P.












