A Bradford company - serving McKinney, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Vanities, Tile & Fixtures in McKinney, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
A remodeled hall bathroom with patterned floor tile and painted walls
A low-threshold walk-in shower with a bench and grab bar
A powder room with botanical wallpaper and a stone sink
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A whole-home remodel with the living, dining and kitchen areas opened up
A second-story addition that matches the existing roofline
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Vanities, Tile & Fixtures in McKinney, TX

A bathroom vanity, tile, and fixture package in McKinney typically runs $1,600 to $9,500 depending on whether you’re resurfacing a tired guest bath or rebuilding a primary suite with a double vanity and a full tile shower. That range covers the vanity cabinet and top, floor and wall tile, and the fixtures – faucets, shower trim, tub spout, mirror, and lighting. We install against a written specification, source from a documented brand roster, and put the whole scope and price on paper before demolition starts. Call (844) 834-0609 and a live person answers, day or night.

This is the finish side of Bathroom Remodeling in McKinney – the part of the job you actually see and touch every morning. It’s also the part where cheap work shows first. A vanity that pulls away from the wall, grout that cracks in the first Texas summer, a faucet cartridge that drips within a year. Our technicians have up to 22 years of experience, and they’re background-checked and uniformed, so you know who’s in your house before they knock.

Key Takeaways

  • Vanity, tile, and fixture packages in McKinney run roughly $1,600 to $9,500, priced in writing before work begins.
  • Every completed project carries the 365-Day Done Right Promise – if the work fails inside a year, we return and correct it at no charge.
  • We install documented brands (KraftMaid and Wellborn vanities, Cambria and Caesarstone tops, Kohler and Moen fixtures) so specs are traceable.
  • Live person on the phone 24/7. Written price before a single tool comes out.
A tile setter installing wall tile in a shower

When You Need Vanities, Tile & Fixtures

McKinney’s housing stock tells the story. The big build-out around Stonebridge Ranch, Craig Ranch, and Westridge put up thousands of homes with builder-grade vanities, 4-inch backsplashes, and chrome fixtures that hit their useful life somewhere around the fifteen-year mark. Add North Texas’ expansive clay soil – it moves with every wet-dry cycle – and you get grout lines and caulk joints that open up faster than most national averages. Here’s what we see most:

  • The vanity is failing before the rest of the room. Particleboard cabinet boxes swell at the toe kick, doors sag on worn hinges, and the laminate top has started to delaminate around the sink cut-out. In McKinney homes built in the late 1990s and 2000s, this is the single most common trigger for a finish-side remodel.
  • Grout and caulk keep opening up. If you’ve re-caulked the same shower corners three times and they crack again within months, the underlying issue is usually movement or a substrate that wasn’t set right – not the caulk.
  • You want a double vanity where there’s a single. Households with two working adults and a shared hall bath run into the same bottleneck every morning. Reconfiguring to a double vanity is a plumbing rough-in change, and it needs to be planned before tile goes down.
  • Fixtures out of style or out of parts. A faucet dripping from a cartridge the manufacturer no longer makes is a fixture replacement, not a repair. Same story for a shower valve with no parts support.
  • Water damage under the tile or around the tub. A soft spot near the tub surround or a loose floor tile that “gives” underfoot points to moisture behind the finish. That’s a substrate question before it’s a tile question.
  • You’re moving and want the bathroom to photograph well. A clean vanity, new fixtures, and fresh tile do more for a McKinney listing than almost any other finish upgrade per dollar.

Our Vanities, Tile & Fixtures Process

We run this install the same way on every job: measured, specified, priced in writing, then executed. No numbers that move at the door.

  1. Measure and inspect. We measure the vanity opening, check wall plumb and floor level, and inspect the substrate – the layer under the tile, whether that’s cement board, a mortar bed, or whatever a previous owner did. Substrate problems get identified here, not discovered mid-install. We also confirm the rough-in locations for supply lines and the drain.
  2. Specify and quote in writing. You pick the vanity brand and door style (KraftMaid and Wellborn are our documented cabinet lines), the countertop material (Cambria and Caesarstone quartz are the standards we work with), the tile, and the fixtures (Kohler and Moen). Every line item gets a price on paper before we schedule. This is The Garrison Standard in practice – the price is settled before the first tool comes out.
  3. Order and stage materials. We confirm the spec sheet against what arrives. Tile dye lots, cabinet finish, and fixture trim get verified before install day. Nothing gets installed loose from a truck and guessed at.
  4. Tear out and prep. Old vanity, tile, and fixtures come out. We address whatever the substrate reveals and reset the surfaces true. Grout lines that open up in a few months usually trace back to a skipped step here.
  5. Install. Tile set, vanity set and shimmed level, countertop templated and installed, fixtures connected, mirror and lighting hung, caulk and grout finished. Our technicians set tile on the same disciplined sequence every time.
  6. Walk-through and guarantee. We walk the room with you, show you what was done, and leave you a signed written guarantee in hand. That’s the 365-Day Done Right Promise: if any of the work fails within a full year, we come back and correct it at no charge.

The rest of the room matters to how this package comes out, which is why we keep the parent scope in view – the Bathroom Remodeling page lays out the full picture on layout, waterproofing, and ventilation.

A wide opening with a new beam where the kitchen wall was removed

Vanities, Tile & Fixtures Pricing in McKinney

Honest ranges, not “call for a quote.” These are typical figures for a McKinney bathroom, and they reflect real material grades – the spread between the low and high end is mostly cabinet line, countertop material, and tile size and finish, not labor tricks.

Line item Typical range
Vanity cabinet (single, 30-36 in.) $450 – $1,400
Vanity cabinet (double, 60 in.) $1,100 – $2,800
Countertop (quartz, fabricated) $650 – $2,200
Floor tile (installed, per sq. ft.) $9 – $22
Shower wall tile (installed) $1,200 – $4,500
Faucets, shower trim, tub spout $350 – $1,300
Mirror and vanity lighting $200 – $750
Full package, guest bath $1,600 – $4,800
Full package, primary bath $4,200 – $9,500

What moves the number: tile size and material (large-format porcelain and natural stone cost more to set than a standard ceramic), whether the rough-in needs to move for a double vanity, whether the substrate needs replacement, and the cabinet and fixture grade you choose within our documented brand set. We don’t quote ranges on the job – we quote your job in writing, and that number holds.

The Garrison Code runs through this pricing. The price is settled before work begins, always included, non-negotiable. Call (844) 834-0609 for a free estimate, and we’ll measure and price your specific room.

Why Bradford Remodeling Co McKinney for Vanities, Tile & Fixtures

You’ve probably heard a version of this before: a crew that no-shows, a bid that grows at the door, a job left half-finished. Bradford exists for homeowners who’ve had enough of that. We’re a member of the Garrison Partners family, established in 2004, and each location is independently owned and operated while held to The Garrison Standard – which means the written price, the background-checked and uniformed technicians, and the 365-Day Done Right Promise aren’t optional flourishes. They’re the framework behind every job.

We also install to a documented roster, so specifications are traceable and warranties are real. A Moen cartridge that fails gets replaced by Moen under the terms that come with the part, and a Cambria top that’s installed wrong gets corrected under our one-year written guarantee. No guessing, no substitutions, no “we used what was on the truck.” Our technicians have up to 22 years of experience, and a live person answers the phone around the clock – not a voicemail, not a callback queue.

FAQs – Vanities, Tile & Fixtures

How much does a bathroom vanity and tile package cost in McKinney?

A guest bath vanity, tile, and fixture package in McKinney typically runs $1,600 to $4,800, while a primary bath package runs $4,200 to $9,500. The low end reflects a stock single vanity, standard ceramic floor tile, and a basic Kohler or Moen faucet; the high end covers a double KraftMaid or Wellborn vanity, a Cambria or Caesarstone quartz top, large-format or natural stone tile, and premium fixtures. Call (844) 834-0609 for an exact written quote – the estimate is free.

Can you install a vanity and tile the same day?

No – a proper vanity, tile, and fixture install runs multiple days, and any crew promising a full bathroom finish job in one day is skipping steps. Tile needs to be set and cured, the countertop has to be templated and brought back once cut, and fixtures and trim close out the job. We give you a written schedule before work begins so you know what’s happening and when. Call (844) 834-0609 and we’ll lay out the timeline for your room.

What tile and fixtures brands do you install in McKinney?

We install a documented roster of name-brand materials – KraftMaid and Wellborn for vanities, Cambria, Silestone, and Caesarstone for countertops, and Kohler and Moen for faucets and shower trim. Because the brands are documented, the specifications are traceable and the manufacturer warranties actually apply. Where a specific material is a good fit for a McKinney bathroom – porosity, moisture, slip resistance for the floor – we’ll tell you straight. Call (844) 834-0609 to talk through options.

Is it cheaper to repair or replace a failing vanity?

Repair is cheaper when the failure is isolated – a single cabinet door, a loose hinge, or a faucet cartridge – and replacing just that part usually makes sense. Replace the whole vanity when the cabinet box shows swelling at the toe kick or base, when the countertop is delaminating around the sink, or when you want to move to a double vanity. In those cases patching tends to fail again within a year. Call (844) 834-0609 and we’ll give you an honest read on which is right for your McKinney bathroom.

Get Your Written Price

If your McKinney bathroom’s vanity, tile, or fixtures are past their useful life, start with a measured, written price. We’ll inspect the substrate, spec the materials against our documented brand roster, and hand you a quote before any work begins – and a live person is on the phone 24/7 to schedule it. Call (844) 834-0609 for a free estimate. The work is covered by the 365-Day Done Right Promise, and a clean site and signed written guarantee are yours at close.

Written by the team at Bradford Remodeling Co McKinney, serving McKinney.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in McKinney? Licensed & insured · free written estimates
Call (844) 834-0609
Local Service Coverage

Request a Free Estimate in McKinney

Tell us what you need - Bradford Remodeling Co McKinney responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch