







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Princeton
Princeton is growing fast, and a lot of the kitchens here are barely a decade old. That doesn’t mean they work. The builder-grade cabinet boxes, the tile that’s lifting at one corner, the island that was never quite level with the floor – we hear the same list from homeowners off US 380 and down toward the 75407 side of town. We scope kitchen remodels in Princeton with the written price up front and a plan that accounts for what’s actually under the floor. Call (844) 834-0609 and a live person picks up, day or night.
Why Bradford Remodeling Co McKinney Is Princeton’s Preferred Kitchen Remodeling Company

Bradford Remodeling runs on The Garrison Standard. That means the price is written before a single tool comes out, the crew is background-checked and uniformed, and every finished kitchen carries a 365-Day Done Right Promise – if the work fails inside that window, we come back and correct it at no charge.
Princeton homeowners have been burned by no-shows and invoices that creep at the door. Our technicians bring up to 22 years of experience to the job, and we put the scope, the draw schedule, and the guarantee in writing so nothing is left to a handshake. We answer the phone with a real person 24 hours a day, seven days a week – not a voicemail queue.
The local knowledge matters here. We know what expansive Collin County clay does to a slab kitchen, and we read it before we price a finish. That’s part of why Princeton homeowners call back for the second job.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Kitchen Remodeling Company in Princeton
A Kitchen Remodeling Company in Princeton is working mostly on slab-on-grade homes in new subdivisions and acreage builds, where the kitchen is often the first thing an owner wants to open up or rework. In Princeton that usually means an island or a wall coming out – and that means reading the slab first. Recent tract homes here sit on expansive black clay that moves with wet-dry cycles, so cabinet runs and island anchors have to be scoped against floor flatness and crack patterns before any finish gets priced. A full kitchen remodel in Princeton runs $14,000 – $45,000, depending on scope, cabinetry, and whether a load-bearing change is involved.
Opening Up the Kitchen
Taking out a wall or adding an island changes how the room lives, but it also touches structure. We bring in engineered plans and pull the permits so the load-bearing change is signed off before cabinets go in – not after.
Cabinets and Surfaces
We work with documented name-brand materials – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures – so the specs are traceable and the finish quality isn’t guesswork.
Small Kitchen Remodel in Princeton

A Small Kitchen Remodel in Princeton most often targets the compact galley or L-shaped layouts in the newer tract subdivisions off US 380, where the footprint is fine but the storage and counters aren’t. These jobs are tighter in scope: cabinet refacing or replacement, a new countertop, a backsplash, maybe a small island for prep space. A small kitchen remodel in Princeton runs $9,000 – $20,000. We scope the rough-in and floor condition first, because a tight budget still fails if the substrate under the new floor isn’t flat.
What Fits in a Small Remodel
Cabinet installation alone runs $4,000 – $13,000, and countertop installation is $2,000 – $6,500. A backsplash adds $800 – $2,500. Those pieces can be sequenced across phases if the budget needs it.
Getting the Layout Right
A small kitchen design and layout pass before demolition saves money later. Moving a sink or range rough-in after the cabinets are ordered is where small remodels go sideways.
Trusted Brands We Service in Princeton
We install premium, documented brands on Princeton jobs – KraftMaid, Wellborn, Cambria, Silestone, Kohler, and Moen among the approved set. We don’t stock parts on a truck; materials are ordered to spec and delivered, which keeps turnaround predictable and the manufacturer warranty intact. For the slab and prep work we use Quikrete and Sakrete products. Traceable specs matter when a countertop or cabinet needs to be replaced down the line – you want the brand and the model, not a guess.
See the difference
Before
After
Before
After
Before
AfterCommon Kitchen Remodeling Problems We See in Princeton Homes
- Slab movement showing up in the new island. Princeton’s expansive clay cycles with wet and dry seasons, and a cabinet run or island that meets a moving slab telegraphs the same uneven floor within a season if it isn’t addressed first.
- County permitting treated as informal. Work that starts without the third-party inspection sign-off a permit provides can surface as an unpermitted structural or rough-in change at resale.
- Access on acreage lots. Long rural driveways and material hauls for cabinets and counters can blow past allowances unless the scope and change order terms are written in advance.
- Septic and well setbacks on rural parcels. On Princeton’s outlying acreage, a kitchen addition or utility relocation has to clear the septic field and well head before the plan is final.
Pricing for Kitchen Remodeling in Princeton, TX
Here’s the real number range. A full kitchen remodel in Princeton is $14,000 – $45,000. A small kitchen remodel is $9,000 – $20,000. The spread comes from scope, not salesmanship: cabinet brand and count, whether a load-bearing wall or island anchor is involved, and how much subfloor and slab work the job needs on Princeton’s clay. We give you a written price before work starts – line items, not a lump sum that moves at the door. Call (844) 834-0609 for a free estimate.
| Line Item | Princeton Price Range |
|---|---|
| Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
| Backsplash Installation | $800 – $2,500 |
We Also Serve Cities Near Princeton
We also work kitchens in Kitchen Remodeling for the surrounding towns – McKinney, Fairview, Lucas, and Melissa. If you’re just outside Princeton proper and unsure whether we cover your address, call and ask. We’ll tell you straight. Our Kitchen Remodeling in Princeton work follows the same written-price standard everywhere.
Serving Princeton, TX – Our Local Coverage Area
We serve Princeton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Kitchen Remodeling in Princeton
The punch list and inspection sign-off are written into the scope from day one, so nothing is left to a walk-through conversation at the end. We sequence inspections before cabinets and tops go in on Princeton slab kitchens, keep a draw schedule tied to sign-offs, and hand you a signed written guarantee with the finished punch list at close. Call (844) 834-0609 and we’ll walk you through how that works on your project.
We answer the phone with a live person 24/7, and we schedule Princeton estimates without a voicemail queue in the way. A remodel is planned work, so the schedule gets set around your scope and the estimate – not a same-day promise. Call (844) 834-0609 to book your free estimate.
We cover the 75407 ZIP and the neighborhoods and acreage parcels around it – the newer subdivisions pushing along US 380 and the custom builds on multi-acre lots. If you’re on an outlying parcel, mention your access and utility setup when you call, because county permitting and septic or well setbacks affect the scope.
A full kitchen remodel in Princeton runs $14,000 – $45,000 and a small one $9,000 – $20,000, which sits in line with McKinney and the surrounding towns. Princeton jobs can run higher when a slab repair, load-bearing change, or long driveway access adds to the scope, and we put those items in writing before work starts. Call (844) 834-0609 for an exact quote – estimates are free.
Every completed kitchen is covered by the 365-Day Done Right Promise – a full-year written guarantee. If the work fails inside that window, we come back and correct it at no charge. That’s The Garrison Standard: the guarantee is in your hand at close, signed, not a verbal promise.
Written by the team at Bradford Remodeling Co McKinney.











