A Bradford company - serving McKinney, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
Kitchen Remodeling · Princeton, TX

Kitchen Remodeling in Princeton - Fixed Price, Set Finish Date

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Permits handled, and the local pro we connect you with is licensed and insured.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
A galley kitchen opened up to the dining room with a new peninsula
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A small remodeled galley kitchen with cabinets to the ceiling
A walk-in pantry with wood shelving
A remodeled primary suite with built-in wardrobes and a window seat
A garage converted into a guest room and home office
A remodeled hall bathroom with patterned floor tile and painted walls
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Kitchen Remodeling Across Princeton

Princeton is growing fast, and a lot of the kitchens here are barely a decade old. That doesn’t mean they work. The builder-grade cabinet boxes, the tile that’s lifting at one corner, the island that was never quite level with the floor – we hear the same list from homeowners off US 380 and down toward the 75407 side of town. We scope kitchen remodels in Princeton with the written price up front and a plan that accounts for what’s actually under the floor. Call (844) 834-0609 and a live person picks up, day or night.

Call (844) 834-0609

Why Bradford Remodeling Co McKinney Is Princeton’s Preferred Kitchen Remodeling Company

Installers leveling a new base cabinet during a kitchen remodel

Bradford Remodeling runs on The Garrison Standard. That means the price is written before a single tool comes out, the crew is background-checked and uniformed, and every finished kitchen carries a 365-Day Done Right Promise – if the work fails inside that window, we come back and correct it at no charge.

Princeton homeowners have been burned by no-shows and invoices that creep at the door. Our technicians bring up to 22 years of experience to the job, and we put the scope, the draw schedule, and the guarantee in writing so nothing is left to a handshake. We answer the phone with a real person 24 hours a day, seven days a week – not a voicemail queue.

The local knowledge matters here. We know what expansive Collin County clay does to a slab kitchen, and we read it before we price a finish. That’s part of why Princeton homeowners call back for the second job.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Kitchen Remodeling Company in Princeton

A Kitchen Remodeling Company in Princeton is working mostly on slab-on-grade homes in new subdivisions and acreage builds, where the kitchen is often the first thing an owner wants to open up or rework. In Princeton that usually means an island or a wall coming out – and that means reading the slab first. Recent tract homes here sit on expansive black clay that moves with wet-dry cycles, so cabinet runs and island anchors have to be scoped against floor flatness and crack patterns before any finish gets priced. A full kitchen remodel in Princeton runs $14,000 – $45,000, depending on scope, cabinetry, and whether a load-bearing change is involved.

Opening Up the Kitchen

Taking out a wall or adding an island changes how the room lives, but it also touches structure. We bring in engineered plans and pull the permits so the load-bearing change is signed off before cabinets go in – not after.

Cabinets and Surfaces

We work with documented name-brand materials – KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures – so the specs are traceable and the finish quality isn’t guesswork.

Small Kitchen Remodel in Princeton

A remodeled living room with built-in shelves around the fireplace

A Small Kitchen Remodel in Princeton most often targets the compact galley or L-shaped layouts in the newer tract subdivisions off US 380, where the footprint is fine but the storage and counters aren’t. These jobs are tighter in scope: cabinet refacing or replacement, a new countertop, a backsplash, maybe a small island for prep space. A small kitchen remodel in Princeton runs $9,000 – $20,000. We scope the rough-in and floor condition first, because a tight budget still fails if the substrate under the new floor isn’t flat.

What Fits in a Small Remodel

Cabinet installation alone runs $4,000 – $13,000, and countertop installation is $2,000 – $6,500. A backsplash adds $800 – $2,500. Those pieces can be sequenced across phases if the budget needs it.

Getting the Layout Right

A small kitchen design and layout pass before demolition saves money later. Moving a sink or range rough-in after the cabinets are ordered is where small remodels go sideways.

Trusted Brands We Service in Princeton

We install premium, documented brands on Princeton jobs – KraftMaid, Wellborn, Cambria, Silestone, Kohler, and Moen among the approved set. We don’t stock parts on a truck; materials are ordered to spec and delivered, which keeps turnaround predictable and the manufacturer warranty intact. For the slab and prep work we use Quikrete and Sakrete products. Traceable specs matter when a countertop or cabinet needs to be replaced down the line – you want the brand and the model, not a guess.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Kitchen Remodeling Problems We See in Princeton Homes

  • Slab movement showing up in the new island. Princeton’s expansive clay cycles with wet and dry seasons, and a cabinet run or island that meets a moving slab telegraphs the same uneven floor within a season if it isn’t addressed first.
  • County permitting treated as informal. Work that starts without the third-party inspection sign-off a permit provides can surface as an unpermitted structural or rough-in change at resale.
  • Access on acreage lots. Long rural driveways and material hauls for cabinets and counters can blow past allowances unless the scope and change order terms are written in advance.
  • Septic and well setbacks on rural parcels. On Princeton’s outlying acreage, a kitchen addition or utility relocation has to clear the septic field and well head before the plan is final.

Pricing for Kitchen Remodeling in Princeton, TX

Here’s the real number range. A full kitchen remodel in Princeton is $14,000 – $45,000. A small kitchen remodel is $9,000 – $20,000. The spread comes from scope, not salesmanship: cabinet brand and count, whether a load-bearing wall or island anchor is involved, and how much subfloor and slab work the job needs on Princeton’s clay. We give you a written price before work starts – line items, not a lump sum that moves at the door. Call (844) 834-0609 for a free estimate.

Line Item Princeton Price Range
Kitchen Remodel $14,000 – $45,000
Small Kitchen Remodel $9,000 – $20,000
Cabinet Installation $4,000 – $13,000
Countertop Installation $2,000 – $6,500
Kitchen Island Installation $3,000 – $10,000
Backsplash Installation $800 – $2,500

We Also Serve Cities Near Princeton

We also work kitchens in Kitchen Remodeling for the surrounding towns – McKinney, Fairview, Lucas, and Melissa. If you’re just outside Princeton proper and unsure whether we cover your address, call and ask. We’ll tell you straight. Our Kitchen Remodeling in Princeton work follows the same written-price standard everywhere.

Serving Princeton, TX – Our Local Coverage Area

We serve Princeton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Kitchen Remodeling in Princeton

Why Princeton Chooses Bradford Remodeling Co McKinney

We set the standard for kitchen remodeling in Princeton.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Princeton

Getting your kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Princeton Customers Say

Trusted by homeowners across Princeton and surrounding areas.

★★★★★

"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."

Alan M.
★★★★★

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

Tricia S.
★★★★★

"Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."

Cal P.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A dining nook with a built-in banquetteA home office with a built-in desk and shelvesA wood double vanity with two mirrors after a bathroom remodelAn open living space after a whole-home remodelA finished backyard cottage with a small covered porchA remodeled primary bathroom with a soaking tub and walk-in shower

More remodeling services in Princeton

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Kitchen Remodeling in Princeton?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Princeton.

(844) 834-0609

Request a Free Estimate in Princeton

Tell us about your kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch