A Bradford company - serving McKinney, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Tub-to-Shower Conversion in McKinney, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in McKinney
A powder room with botanical wallpaper and a stone sink
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
New painted shaker cabinets with an organized deep drawer
A remodeled staircase with wood treads and a slim metal railing
A small remodeled galley kitchen with cabinets to the ceiling
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Tub-to-Shower Conversion in McKinney, TX

A tub-to-shower conversion in McKinney typically costs between $3,800 and $11,500, and most projects are finished in three to seven working days. We remove the old tub, adapt the drain and rough-in to a shower pan, waterproof the substrate properly, and set new tile and fixtures. It’s a real remodel in a tight footprint, not a liner dropped over what’s already there.

We do this work because it’s one of the most requested changes in McKinney’s older housing stock. A lot of homes built during the early-2000s boom in Stonebridge Ranch and Craig Ranch still have original garden tubs that no one uses. Homeowners want the space back, and they want a shower that’s safe to step into. Bradford Remodeling Co McKinney handles the whole job under Bathroom Remodeling, with one written price before the first tool comes out. Call (844) 834-0609 and a live person will pick up, day or night.

Our technicians have up to 22 years of experience, and they’ve seen what happens when a conversion skips the waterproofing step. What sits behind the tile matters as much as what you see on it.

A tile setter installing wall tile in a shower

Key Takeaways

  • A tub-to-shower conversion runs $3,800 to $11,500 in McKinney, depending on size, tile, and whether the drain has to move.
  • Most conversions take three to seven working days from demo to walkthrough.
  • Every project gets a written price before work starts and a 365-Day Done Right Promise that covers the work for a full year.
  • The old tub’s footprint usually fits a 60-inch shower pan without moving the drain, which keeps cost down.

When You Need Tub-to-Shower Conversion

Some jobs are obvious. Others build up slowly until a homeowner finally makes the call. These are the situations we hear about most in McKinney.

  • The tub goes unused. You’ve got a garden tub taking up half the bathroom and a shower you use every day. Reclaiming that footprint for a walk-in shower gives you room that actually gets used.
  • Stepping over the tub wall has become a hazard. In single-story homes around Historic Downtown McKinney, we regularly hear from homeowners worried about an aging parent or a recovering knee. A low-threshold shower pan removes the climb.
  • The tile surround is failing. Cracked grout, soft drywall at the bottom of the surround, or a caulk line that keeps pulling away all point to moisture behind the wall. When the substrate is compromised, patching is wasted money.
  • The tub is original to a 2000s build and showing its age. Fiberglass and acrylic tubs from that era discolor, flex underfoot, and start to craze. Once the gel coat goes, replacement is the practical answer.
  • You’re planning to sell within a few years. A clean, code-compliant walk-in shower reads well to buyers touring homes in Westridge and Stonebridge Ranch. It also takes pressure off the inspection report.
  • You want better water control and ventilation. A walk-in shower with a proper pan, a quality Kohler or Moen valve, and a good exhaust fan keeps moisture where it belongs in North Texas humidity.
A galley kitchen opened up to the dining room with a new peninsula

Our Tub-to-Shower Conversion Process

The Garrison Standard runs the job from first call to final walkthrough. Here’s the order of operations.

  1. On-site assessment and written scope. We measure the existing tub alcove, check the drain location and the condition of the framing, and confirm whether the valve needs to move. You get a written price before anything is scheduled. No numbers that change at the door.
  2. Material selection from a documented brand roster. Tile, shower pan, valve, trim, and glass are chosen from materials with manufacturer specifications and warranties behind them. When a fixture carries a real spec sheet, our guarantee has something solid to stand on.
  3. Protected demo. Floors and adjacent rooms get covered, the old tub and surround come out, and debris leaves the same day. We’ve pulled more cracked fiberglass tubs out of McKinney bathrooms than we can count, and we don’t leave them sitting in your driveway.
  4. Rough-in and waterproofing. This is the step that separates a conversion from a cover-up. We adjust the drain and valve to fit the new shower, then build a waterproof substrate – a cement-based backer rated for wet areas with a bonded membrane over it. Done right, it’s the thing you’ll never see and the reason nothing leaks.
  5. Tile, glass, and trim. Pan tile, wall tile, niche, and the shower door go in, along with any grab bars or a bench if the shower calls for one. We set everything and seal it.
  6. Closeout walkthrough. We test the valve and drain, clean the site, hand you the signed 365-Day Done Right Promise, and walk the work with you room by room. The bathroom should look like a crew was never there – except for the new shower.

Tub-to-Shower Conversion Pricing in McKinney

Pricing depends on the size of the alcove, which materials you pick, and whether the drain and valve have to move. Below are honest ranges for McKinney, so you know what to expect before we show up. Your written quote will match the work.

Scope Typical Range
Basic conversion, standard 60-inch pan, acrylic surround, standard valve $3,800 – $5,500
Mid-range, tile walls and pan, quality Kohler or Moen valve, framed glass door $5,500 – $8,500
Premium, large-format tile, bench or niche, frameless glass, moving the drain $8,500 – $11,500
Drain relocation (when the existing drain can’t stay) $600 – $1,400 added
Grab bars and safety hardware $250 – $700 added

What pushes cost up in McKinney? Tile choice is the biggest swing. Porcelain and ceramic are economical; natural stone and large-format tile cost more to buy and more to set. Moving the drain or valve adds plumbing labor because it means opening the wall and, in a slab home, the floor. Glass goes up fast if you want frameless. Grab bars and a bench add a little.

What keeps cost down: reusing the existing drain location when the alcove allows it, which is common in the standard 60-inch tub openings we see across McKinney. Sticking with a curb-and-pan setup rather than a curbless design also saves. We tell you which one you have room for during the assessment.

The written price covers demo, materials, labor, and closeout. Estimates are free. Call (844) 834-0609 for yours.

Why Bradford Remodeling Co McKinney

We’re part of the Garrison Partners family, which has operated since 2004, and we run as an independently owned and operated business held to The Garrison Standard. That means the commitments below aren’t marketing lines – they’re written into every job.

  • The 365-Day Done Right Promise. Every completed conversion carries a full-year written guarantee. If the work fails inside that window – a leaking pan, a tile that pops, a valve that won’t hold – we come back and correct it at no charge. One year, in writing, handed to you at closeout.
  • No-hassle upfront pricing. You get a written price before any work starts. Non-negotiable.
  • Background-checked, uniformed technicians. You know who’s coming through the door before the crew arrives. Those standards are set at the Garrison Partners level, not left to individual job sites.
  • Live-person phone coverage, 24/7. A real person answers. No voicemail, no callback queue.

The materials we install carry real specifications and real warranties – KraftMaid, Kohler, Moen, Cambria and Silestone surfaces, and Boral trim are among the brands on our documented roster. That traceability is what lets the guarantee mean something.

McKinney homeowners have plenty of contractors to call. What’s harder to find is a crew that answers the phone, shows up when it says it will, and stands behind the work for a full year. That’s the difference we’re built on. For the bigger picture on what we do across the house, see our home page.

FAQs – Tub-to-Shower Conversion

How much does a tub-to-shower conversion cost in McKinney?

In McKinney, a tub-to-shower conversion typically runs $3,800 to $11,500, with most homeowners landing in the $5,500 to $8,500 range. The variables are tile choice, whether the drain or valve has to move, and the glass you pick. Call (844) 834-0609 for an exact quote – estimates are free, and the price you get is written before work starts.

How long does a tub-to-shower conversion take?

Most conversions take three to seven working days from demo to walkthrough. A straightforward 60-inch alcove with standard tile can be done in three to four; a larger job with drain relocation and frameless glass may run six or seven. Your written scope includes the timeline before we begin.

Is a tub-to-shower conversion cheaper than a full bathroom remodel?

Yes, usually by a wide margin. A full remodel touches everything in the room – vanity, toilet, floor, lighting, plumbing, and layout – and pricing climbs accordingly. A tub-to-shower conversion touches only the tub alcove, so it costs less and finishes faster while still upgrading the room’s biggest fixture. Our Bathroom Remodeling in McKinney page covers the full-remodel scope if that’s where you’re headed.

Do I need a permit for a tub-to-shower conversion?

In most cases, yes. The City of McKinney requires a plumbing permit when a drain or valve is relocated, and the work has to pass inspection. Because we’re working on the plumbing and the waterproofing, we walk you through what the permit involves for your job before we start. That paper trail matters at resale.

Written by the team at Bradford Remodeling Co McKinney, serving McKinney.

Getting started with Bradford in McKinney

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your McKinney team

A local vetted partner works across McKinney and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in McKinney? Licensed & insured · free written estimates
Call (844) 834-0609
Local Service Coverage

Request a Free Estimate in McKinney

Tell us what you need - Bradford Remodeling Co McKinney responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch