







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Remodeling Company in McKinney, TX
Home remodeling in McKinney means working with two very different houses: the restored Victorians and early-1900s homes around the courthouse square, and the 1990s-to-2010s tract homes out on post-tension slabs in Stonebridge Ranch, Craig Ranch and Adriatica. Blackland Prairie clay moves under both of them, so a remodel here starts with the floor and the frame, not the finishes. We put every price in writing before a tool comes out and back the finished work with a written one-year guarantee. Call (844) 834-0609 for a free estimate.
Why McKinney Homes Are Different
The clay is the first thing. Blackland Prairie soil swells through a wet North Texas spring and shrinks hard through a dry summer, so slabs move and the cracks show up as sticking doors, drywall seams and out-of-level floors. In Stonebridge Ranch and the other master-planned subdivisions, that movement lands on post-tension slabs – concrete poured with tensioned cables inside, which changes how you cut, anchor and repair. The mature pecan and oak canopy matters too: roots pull moisture out of the soil and push it back, and root barriers are a real part of foundation conversations here.
Downtown McKinney adds a second set of rules. The 1800s courthouse square sits inside a historic preservation district, so exterior work on those homes goes through design review before a permit is issued, and material choices have to match what the district allows. Meanwhile the northern growth zones keep adding new-build homes, which means crews here swing between historic-sensitive remodels and slab-and-frame corrections on 20-to-30-year-old tract houses.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Main McKinney Services
Two calls come in more than any other from McKinney homeowners, and both start the same way: a written scope and a written price before work begins.
General Contractor in McKinney
General contracting in McKinney means holding a whole project together – permits, trades, inspections, schedule – on homes that were built in wildly different decades. On a Stonebridge Ranch house from the 1990s, that often means coordinating a foundation assessment with the remodel scope so the two don’t fight each other. Around the downtown square, it means pulling the historic district’s design review into the schedule early instead of discovering it mid-job. Our technicians have up to 22 years of experience, and every job is background-checked and uniformed. For the full scope of what we coordinate, see General Contractor in McKinney.

Kitchen Remodeling in McKinney
Kitchens in McKinney’s older downtown homes were built for a different century – small footprints, load-bearing walls in awkward places, and wiring that predates the appliances people want now. In the 1990s subdivisions, the common job is opening a closed-off galley to the family room and swapping tired cabinets for KraftMaid or Wellborn. Summer heat and attic temperatures matter here too; a kitchen that vents a range hood into a 140-degree attic in July needs the duct run figured out first. Start with Kitchen Remodeling in McKinney for the local picture.

Bathroom Remodeling in McKinney
Bathrooms are where McKinney’s clay movement shows up first. A hairline crack in a tile floor or a door that won’t latch is often the slab, not the tile. In older homes near the square, the work usually means replacing cast-iron drains and re-waterproofing a shower that was never properly sealed. In Craig Ranch and Adriatica, it’s more often converting a tub to a walk-in shower with Schluter waterproofing done correctly behind the tile. Our Bathroom Remodeling in McKinney page covers the specifics.

Home Remodeling in McKinney

Home remodeling in McKinney comes down to the age of the house and what the soil has done to it. A 1990s tract home in Stonebridge Ranch is usually sound in the frame but out of level at the slab, with original cabinets, dated bathrooms and a roof that has taken several hail cycles. A Victorian near the courthouse square is the opposite problem: irreplaceable trim and plaster that need careful restoration, plus a preservation district that reviews exterior changes. Both need the same discipline – a documented scope, a written price and a guarantee that holds. You can see the full breadth of what we handle on our Home Remodeling page.
Whole House Remodel
Signs you need it
You’re facing a kitchen, two bathrooms and a roof all at once, or the floor plan no longer fits how you actually live in the house.
What it costs in McKinney
A whole-house remodel on a McKinney home runs from about $14,000 for a focused scope up to $45,000 and beyond for a full kitchen-led rework, with room additions priced separately at $45,000 – $130,000.
How we do it
We walk the house with you, document the existing conditions including the slab and any historic-district constraints, write a line-item scope and price, then sequence trades so framing, rough-in, insulation and finish happen in the right order with inspections at each stage.
Home Renovation
Signs you need it
Original cabinets, dated bathrooms, sticking doors and a roof past its service life on a 1990s McKinney home – the classic case for a renovation rather than a patch.
What it costs in McKinney
Renovation budgets in McKinney typically land between $9,000 for a single small room and $28,000 for a full bathroom, scaling up as kitchens and multiple rooms join the scope.
How we do it
We correct the substrate and framing first, address any drainage or foundation issues the clay has caused, then install documented materials – GAF roofing, James Hardie siding, Therma-Tru doors – so every specification is traceable to a manufacturer warranty.
What Home Remodeling Costs in McKinney
| Item | Typical range in McKinney |
|---|---|
| Kitchen remodel | $14,000 – $45,000 |
| Bathroom remodel | $9,000 – $28,000 |
| Home addition | $45,000 – $130,000 |
Does McKinney’s clay soil affect a remodeling budget?
Yes. Slab movement from expansive clay often means foundation work or drainage correction before finishes go in. On a Stonebridge Ranch home, a foundation repair that ignores drainage may not be warrantable at all, so we price that assessment into the scope up front.
Can you remodel a home inside McKinney’s historic district?
Yes, with design review built into the schedule. Exterior work on homes around the courthouse square needs preservation district approval before permitting. We account for that review timeline in the written scope so it doesn’t stall the job later.
Brands We Service in McKinney
We work with documented, name-brand materials – Schluter waterproofing systems, Grohe and Sterling fixtures, GAF roofing, James Hardie siding and Therma-Tru doors among them – so specifications and warranties are traceable. Turnaround depends on the manufacturer’s lead time and the scope. See our brands for the full roster.
See the difference
Before
After
Before
After
Before
AfterPricing for Remodeling Company in McKinney, TX
| Service | Typical range in McKinney |
|---|---|
| Kitchen remodel | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Bathroom remodel | $9,000 – $28,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Home addition | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
| Garage conversion | $30,000 – $80,000 |
| Roof replacement | $8,000 – $20,000 |
What pushes a McKinney price up is usually what’s under the surface: slab correction on expansive clay, historic-district approvals near the square, and bringing 1990s rough-in up to current code. Every price we give is written before work starts and doesn’t move at the door.
Neighborhoods We Serve in McKinney
We work across McKinney, from the historic core out to the newer subdivisions on the north side. Homes around the downtown square need preservation-sensitive scopes; the master-planned neighborhoods need slab, drainage and roof work tied to the clay and hail cycle. One note on timing: jobs inside the historic district need design review before permitting, so those schedules start a few weeks later than a straight tract-home remodel. Call for a free estimate and we’ll give you a realistic calendar.
- Downtown McKinney and the courthouse square
- Stonebridge Ranch
- Craig Ranch
- Adriatica
- North McKinney growth zones
Service Area – Cities Near McKinney
McKinney sits at the center of a fast-growing corner of Collin County, and we take remodeling and general contracting work in the towns around it. That includes Melissa, TX, Princeton, TX, Fairview, TX and Lucas, TX. The same Blackland Prairie clay and North Texas storm cycle run through all of them, so the foundation and drainage conversation carries over. Call (844) 834-0609 to confirm your address and get a free estimate.
Serving McKinney, TX – Our Local Coverage Area
We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Remodeling Company in McKinney
A live person answers the phone 24 hours a day, and we schedule a free estimate at a time that fits you. Historic-district jobs take longer to start because of design review; tract-home remodels in Stonebridge Ranch and Craig Ranch can move once the scope is written.
Yes. We pull the required permits, coordinate inspections and account for historic-preservation review where it applies. If your subdivision has HOA approval requirements, we fold that into the written scope so nothing surprises you after the deposit.
We do. We take remodeling and general contracting work in Melissa, Princeton, Fairview, Lucas and the surrounding Collin County towns. The same soil and climate conditions apply, so the approach carries over. Call (844) 834-0609 for a free estimate.
Whatever your McKinney home needs – a full remodel, a kitchen or bath, or a general contracting job held together from permit to close – we give you the price in writing first, keep a clean site, and hand you a signed written guarantee on completion. The 365-Day Done Right Promise means if the work fails within a year, we come back and fix it at no charge. Call (844) 834-0609 for a free estimate.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local construction pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What McKinney Customers Say
"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."
- Tricia S."Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."
- Cal P.












