







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Princeton
If you’re planning a bathroom remodel in Princeton, you’re likely working inside a home that’s newer than you’d expect for the money you paid, on ground that moves more than it should. That combination shapes almost every project we quote here. Bradford Remodeling Co McKinney is a member of the Garrison Partners family, established in 2004, and we bring The Garrison Standard to Princeton homeowners: a written price before any work starts, background-checked and uniformed technicians, and a live person answering the phone when you call. We know the US 380 corridor, we know what fast-track subdivision builds leave behind, and we quote Princeton bathrooms with that in mind. Call (844) 834-0609 to set up a free estimate.
Why Bradford Remodeling Co McKinney Is Princeton’s Preferred Bathroom Remodeling Company

Princeton is a fast-growth Collin County exurb, and most of the housing here went up quickly. That means the remodel work in town is less about tearing out 1970s pink tile and more about opening a wall on a recent tract build and finding the assembly underneath wasn’t done to spec. We build our estimates around that reality instead of pretending it away.
Our answer-first habit is the differentiator. When we quote a premium surface like Cambria or a Kohler fixture, we also write the allowances into the contract so the material budget is traceable from the first day. If demolition turns up something the first walkthrough couldn’t see, we price it and get your written approval before a tool goes back to work. No numbers that move at the door.
Every completed Princeton bathroom carries the 365-Day Done Right Promise: a full-year written guarantee, and if the work fails inside that window, we come back and correct it at no charge. Our technicians have up to 22 years of experience, and identity and conduct standards are set at the Garrison Partners level, not left to whoever’s on site that day. If that discipline sounds like the crew you’ve been waiting for, call (844) 834-0609.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Bathroom Renovation in Princeton
Bathroom Renovation in Princeton usually means gutting a builder-grade bathroom and rebuilding it to a higher standard, and the job runs $9,000 – $28,000 depending on scope and finish level. Princeton’s housing stock is overwhelmingly recent tract subdivisions with brick-veneer slab-on-grade homes plus scattered custom builds on acreage parcels, so the work skews toward correcting shortcuts rather than undoing decades of wear. If your home is ten to twenty years old and the shower is already leaking or the floor tile has cracked, a full renovation is often cheaper than chasing repairs one at a time.
The scope typically covers demolition, subfloor and framing corrections, new plumbing rough-in and electrical for fixtures, waterproofing, tile, and finish installation, then a permit inspection before the walls close. A bathroom renovation in Princeton is the right call when you’re moving the layout, upgrading the tub to a shower, or replacing outdated wiring the original builder ran for a single vanity.
What gets opened up during demolition
In a typical Princeton bathroom renovation, walls open to reveal a shower pan that was never sloped to the drain and backer board set directly on framing without a waterproof membrane, common in fast-track subdivision builds where the original installer skipped the preslope. We remove the failed assembly, correct the subfloor and drain rough-in, install a sloped mortar bed or bonded waterproofing membrane, and coordinate a permit inspection before closing the walls. The same job may expose undersized framing around a tub alcove that needs a load-bearing check and upgrade before new tile goes up.
Permits and inspection sign-off
Princeton remodels that move plumbing, electrical, or structural framing require a permit, and the inspection is what protects you later. We pull the permit, build the inspection into the schedule, and don’t hide finish work behind an unapproved wall.
Small Bathroom Remodel in Princeton

A Small Bathroom Remodel in Princeton runs $5,000 – $12,000 and is usually the right answer for a hall bath, a powder room, or a secondary bathroom that needs a refresh rather than a full gut. Most small-bath remodels here involve swapping a tub for a walk-in shower, replacing a dated vanity, and re-tiling a floor that’s cracked from clay movement. Keeping the layout means you’re not paying to move the toilet stack or reroute a vent.
The trick with a small bathroom is knowing where to spend. A tub-to-shower conversion in Princeton ($3,500 – $10,000) or a shower replacement ($3,000 – $8,500) often delivers the biggest change for the money. If the vanity is the only complaint, a vanity installation ($800 – $3,000) with a new Kohler or Moen fixture set may be all you need.
Walk-in showers and glass
A walk-in shower installation ($4,500 – $12,000) with a frameless glass enclosure opens a small bathroom without taking extra floor space. We specify a bonded waterproofing membrane like Schluter and a properly sloped pan so the shower holds up under North Texas humidity swings.
Tile, trim, and finish selection
Small bathrooms live or die on tile scale. We help you pick a tile size and layout that doesn’t make the room feel tighter, then document the exact spec so there’s no substitution mid-project.
Trusted Brands We Service in Princeton
We work with a documented roster of name-brand materials so specifications are traceable and quality isn’t left to guesswork. For Princeton bathroom remodels that means Schluter waterproofing systems under the tile, Grohe and Moen fixtures, and Kohler toilets and sinks, with KraftMaid or Wellborn cabinetry when a new vanity is in scope. If exterior work is part of the project, GAF roofing products are on the approved list too. We don’t claim to stock these parts in you; we specify them, order to the documented scope, and install to manufacturer specs, which keeps turnaround fast and the warranty clean.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Princeton Homes
Princeton’s bathroom surprises come less from old plumbing than from what new construction left behind. Most homes here are recent tract builds on expansive North Texas clay, and the common hidden defect is a shower pan that was never sloped to the drain or a tub surround installed without waterproofing. The clay’s shrink-swell movement also skews door frames and cracks floor tile when the slab wasn’t piered or post-tensioned correctly. Because walls are open once demo starts, a permit-driven remodel is also the moment to correct undersized framing and outdated wiring rather than bury it under new tile.
- Failed shower pan preslope and missing waterproofing: Original tract construction often skipped the preslope and set backer board directly on framing, leading to hidden rot and mold that only appears once the tile is demolished.
- Clay soil movement: Doors that stick and tile that cracks are usually a sign the slab has shifted; we check framing and may add a self-leveling pour before new finishes go down.
- Undersized framing around tubs and showers: A load-bearing check and upgrade is often needed after demo, with a permit inspection sign-off before the wall closes.
- No written scope or allowances: Skipping a documented scope is exactly how surprise change orders happen when outdated wiring or a code upgrade surfaces mid-remodel.
Pricing for Bathroom Remodeling in Princeton, TX
We put a written price in your hand before any work starts, and the ranges below reflect Princeton’s market. A full bathroom remodel runs $9,000 – $28,000; a small bathroom remodel $5,000 – $12,000; a walk-in shower installation $4,500 – $12,000; a tub-to-shower conversion $3,500 – $10,000; a shower replacement $3,000 – $8,500; and a vanity installation $800 – $3,000. What moves the number is scope: whether you’re moving the layout, whether the shower pan and waterproofing need to be rebuilt, and the finish level of tile and fixtures. Because Princeton homes are recent tract builds on expansive clay, we write allowances for the demolition-stage surprises into the contract so the price doesn’t quietly climb. Call (844) 834-0609 for a free, itemized estimate.
We Also Serve Cities Near Princeton
If you’re just outside Princeton, we also work in Bathroom Remodeling for homeowners in McKinney, Fairview, Lucas, and Melissa. Same discipline, same written price, same 365-Day Done Right Promise. See our full Bathroom Remodeling in Princeton page for more detail on how we run a project start to finish.
Serving Princeton, TX – Our Local Coverage Area
We serve Princeton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Princeton
Because the first walkthrough can’t see what’s behind the tile. Princeton’s fast-track subdivision builds frequently hide missing waterproofing, an un-sloped shower pan, or undersized framing, and those defects only show up after demo. We inspect first, write allowances into the contract, and price any surprise in writing for your approval before we touch it. Call (844) 834-0609 for an itemized free estimate.
Yes, if the project moves plumbing, electrical, or structural framing. A permit triggers an inspection, and that inspection is what protects your investment if a defect surfaces later. We pull the permit and coordinate the inspection before the walls close.
It causes shrink-swell movement that skews door frames and cracks floor tile when the slab wasn’t piered or post-tensioned properly. Before new finishes go down, we check the framing and floor level, and we may recommend a self-leveling pour or framing adjustment so the new bathroom doesn’t fail the same way.
Schluter for waterproofing, Grohe and Moen for fixtures, and Kohler for toilets and sinks, with KraftMaid or Wellborn cabinetry when a new vanity is in scope. Each is on our documented brand roster, so specs and warranties are traceable. Call (844) 834-0609 to talk through specifications for your bathroom.
Insist on a written, itemized scope with material allowances before work begins. That single document is why Bradford’s price doesn’t move at the door and why any legitimate surprise is approved in writing, not added to the invoice after the fact.
Ready to stop guessing and start planning? Call Bradford Remodeling Co McKinney at (844) 834-0609 for a free estimate on your Princeton bathroom. You’ll get a written price, a documented scope, and the 365-Day Done Right Promise before a single tool comes out.
Written by the team at Bradford Remodeling Co McKinney.











