







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Melissa
Kitchen remodeling in Melissa typically runs $14,000 to $45,000, and most of the kitchens we see here don’t need a gut job. They need the builder-grade finishes swapped out and the layout kept intact. That’s the first-upgrade cycle running through every subdivision north of the existing core along US 75.
We know this town’s rhythm. New plats mean inspections move on the county’s schedule, not yours, and homes still inside a builder warranty need work that doesn’t touch what the builder still covers. When you call (844) 834-0609, a live person answers and we start with a written price before a single tool comes out.
Why Bradford Remodeling Co McKinney Is Melissa’s Preferred Kitchen Remodeling Company

The homeowners who call us in Melissa have usually been through a no-show or a surprise invoice somewhere else. They want a number in writing and a crew that shows up when scheduled. That’s the whole reason we run on The Garrison Standard: every price and every guarantee documented before work starts, and the 365-Day Done Right Promise covering each completed project for a full year. If the work fails inside that window, we come back and correct it at no charge.
Our technicians have up to 22 years of experience, and every person who walks through your door is background-checked and uniformed. Identity matters when a stranger walks into your home on a Tuesday morning, and the standards are set at the Garrison Partners level, not left to individual job sites. We handle cabinets, counters, backsplash, islands, and full design work across the kitchens in Melissa, from first-upgrade refreshes in Zip 75454 to partial remodel work for owners who bought a newer home that needs the finish line crossed.
Response time across Melissa is straightforward: call us, and we’ll work around the inspection and construction schedule that keeps this town busy. When a project requires a permit and inspection, we’re ready for that, and the local pro is licensed and insured as the state requires. Our pricing comes with a written commitment, always.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Kitchen Design in Melissa
Kitchen Design in Melissa starts with a reality check most homeowners here appreciate: how much of the existing kitchen is worth keeping. Because the housing stock is overwhelmingly builder-grade construction from the last two decades, most design work here isn’t about gutting an old kitchen. It’s about reworking the finish package on a sound box.
We look at the cabinet boxes, subfloor, and plumbing rough-in first. If they’re sound, we design a semi-custom front, quartz or granite tops from Cambria or Caesarstone, and a tile backsplash that runs wall to wall without opening the layout. Design work for a Melissa first upgrade runs within the $14,000 – $45,000 full-remodel band, with a partial scope landing lower. A written design and price comes before any cabinet is ordered.
Working With the Existing Layout
Keeping the load-bearing layout alone is what protects a builder warranty in a still-active Melissa development. We design around the plumbing and structural elements the builder still covers, so nothing gets touched that would trigger a warranty claim.
Material and Finish Selection
We work from a documented roster of name-brand materials so specifications stay traceable. Cabinetry comes from KraftMaid and Wellborn, surfaces from Cambria and Caesarstone, fixtures from Kohler and Moen, so the design has real product names attached, not allowances left vague until selection day.
Kitchen Renovation in Melissa

Kitchen Renovation in Melissa usually means re-facing or replacing cabinet doors and drawer fronts, dropping in new counters, and resetting the backsplash, all without a full tear-out. Where a Melissa homeowner wants a new island or a partial rework, that scope lives here too. A full kitchen renovation in Melissa runs $14,000 – $45,000, and a small or partial kitchen remodel runs $9,000 – $20,000. A typical renovation call starts with builder-grade boxes and laminate counters in a home less than fifteen years old, where the homeowner wants semi-custom fronts and stone tops while steering away from structural changes.
We confirm the existing boxes, subfloor, and plumbing rough-in are sound enough to keep, then re-face or replace doors and fronts while leaving the load-bearing layout alone so the warranty stays intact. Where HOA or architectural approval is required, we verify it before ordering materials so the project doesn’t stall at inspection sign-off.
Refacing Versus Full Replacement
Most Melissa first-upgrade kitchens only need doors, drawer fronts, and counters. A full tear-out needlessly risks the warranty. Cabinet installation runs $4,000 – $13,000 depending on whether we’re refacing or replacing the run.
Counters, Backsplash, and Islands
Countertop installation runs $2,000 – $6,500. A quartz or granite island runs $3,000 – $10,000, and backsplash installation runs $800 – $2,500. We size each line item in writing before a material gets ordered.
Trusted Brands We Service in Melissa
We specify from a documented roster of premium brands so quality is traceable. That means Schluter waterproofing systems under tile, Grohe and Kohler fixtures, and GAF products where the work touches the exterior. We don’t claim to stock parts locally. What we do is specify real brands with manufacturer specs and warranties backing our own guarantee, then order materials against a signed written price. Turnaround on a first-upgrade kitchen is generally faster than a full gut remodel because the finish package is what’s changing, not the bones of the house.
Common Kitchen Remodeling Problems We See in Melissa Homes
- Replacing the whole cabinet run without checking the boxes. A Melissa builder-grade kitchen usually only needs doors, drawer fronts, and counters. A full tear-out needlessly risks the warranty.
- Pulling permits for plumbing or electrical without coordinating with the builder. In homes still inside their builder warranty, this voids coverage on rough-in and structural elements the warranty still covers.
- Skipping HOA/architectural committee approval on exterior-visible changes. A backsplash visible through a window, exterior venting, or a layout change can get stopped mid-project at inspection sign-off if approval wasn’t secured first.
- Signing a contract with vague allowances on countertops and cabinets. The change order at material selection shocks the budget on a first-upgrade kitchen. We write the price before work starts to prevent that.
See the difference
Before
After
Before
After
Before
AfterPricing for Kitchen Remodeling in Melissa, TX
Here’s what a Melissa kitchen remodel actually runs, and we put it in writing before any work starts. A full kitchen remodel runs $14,000 – $45,000. A small or partial kitchen remodel runs $9,000 – $20,000. Cabinet installation runs $4,000 – $13,000. Countertop installation runs $2,000 – $6,500. Backsplash installation runs $800 – $2,500. A kitchen island installation runs $3,000 – $10,000.
What moves the number: whether you reface or replace cabinet boxes, whether you keep the layout intact, and which counter material you select. Keeping the load-bearing layout alone usually keeps the project in the lower half of the band. Every estimate is free, and every price is a written number with no change orders at the door.
| Item | Melissa Price Range |
|---|---|
| Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
We Also Serve Cities Near Melissa
We also work in the neighboring towns around here: Anna, McKinney, Princeton, and Fairview. If you’re on the edge of a new plat or just across the line, the same written pricing and 365-Day Done Right Promise apply. Our Kitchen Remodeling team handles every first-upgrade and partial rework across the area. Call (844) 834-0609 to schedule a free estimate, and we’ll bring the same crew chief ethos to your kitchen.
Serving Melissa, TX – Our Local Coverage Area
We serve Melissa and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Kitchen Remodeling in Melissa
You can usually keep the existing builder-grade cabinet boxes and skip the gut remodel. In a home this young, the boxes, subfloor, and plumbing rough-in are typically sound enough to keep, and the finish package (doors, drawer fronts, counters, backsplash) is what needs changing. A full tear-out in a Melissa first-upgrade kitchen needlessly risks the warranty. Call (844) 834-0609 for a free estimate to confirm the boxes are sound.
Not if the work is sequenced correctly. Any permit-pulled work that touches the structural, plumbing rough-in, or foundation elements the builder still covers can void a warranty claim. Keeping the load-bearing layout and rough-in intact protects the coverage. We coordinate with your builder before any permit gets pulled. Call (844) 834-0609 to walk through your warranty terms.
Sometimes, yes. Anything visible from the street or a change to the exterior footprint can require approval from the HOA or architectural committee in the newer Melissa subdivisions. We verify that approval before ordering materials so the punch list doesn’t stall at inspection sign-off. Call (844) 834-0609 to talk through what your HOA requires.
A first kitchen upgrade in Melissa typically runs $9,000 – $20,000 for a small or partial remodel, or $14,000 – $45,000 for a full remodel. Re-facing cabinet fronts instead of replacing boxes usually keeps the project in the lower half of the band because the load-bearing layout stays intact. Call (844) 834-0609 for an exact quote. Estimates are free.
A permit matters because any plumbing or electrical change in a home still inside its builder warranty can void coverage on the rough-in and structural elements the builder still covers. Pulling a permit without coordinating with the builder puts your warranty at risk. We coordinate with the builder before pulling any permit. Call (844) 834-0609 to schedule a free estimate and review your scope.
Schedule Your Free Melissa Kitchen Remodeling Estimate

Call (844) 834-0609 to schedule your free estimate. We’ll put the price in writing, spell out exactly what the 365-Day Done Right Promise covers and for how long, and confirm the scope before a single tool comes out. When the job is squared away, you get a clean site, a documented scope, and a signed written guarantee in your hand. Whether you’re re-facing builder-grade cabinets in a newer Melissa development or planning a fuller Kitchen Remodeling in Melissa, we’ll give you the straight number first.
Written by the team at Bradford Remodeling Co McKinney.











