







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted General Contractor for McKinney Homeowners
Most McKinney homeowners don’t get burned by bad carpentry. They get burned by silence: a bid that creeps, a crew that disappears for two weeks, an invoice that shows up with three line items nobody agreed to. That’s the problem we solve. Bradford Remodeling Co McKinney puts every scope, every material spec, and every dollar in a written price before a single tool comes out of the truck, and we back the finished work with the 365-Day Done Right Promise: if it fails within a full year, we come back and make it right at no charge. Our technicians have up to 22 years of experience, and they’re background-checked and uniformed, so you know who’s walking through your door before they arrive.
McKinney has its own quirks. Houses in Stonebridge Ranch and Adriatica sit on clay-heavy soil that shifts through North Texas drought-and-soak cycles, which shows up in cracked slab corners and door frames that stop latching two summers after a build. Homes in the historic district downtown bring their own set of code and finish constraints. We plan for both on the front end. Call (844) 834-0609 for a free estimate, and a live person picks up, day or night.
Construction Company

A Construction Company handles the build itself: framing, structural work, additions, and the trades that hang off that skeleton. You need one when the work goes past cosmetic. A load-bearing wall comes out, a garage becomes a guest suite, a second story goes on, or a home addition pushes the footprint out past the existing slab. Bradford Remodeling Co McKinney pulls the permits, sequences the trades, and holds the schedule. Home additions in McKinney run $45,000 – $130,000 depending on square footage and whether the foundation ties into the existing slab. ADU construction runs $90,000 – $220,000, and garage conversions run $30,000 – $80,000. Structural work gets a written scope before anyone swings a hammer.
Structural and Framing Work
We open walls and confirm what’s actually behind them before quoting structural changes, because a McKinney home built in 1998 and one built in 2019 rarely frame the same way. Framing, beam replacement, and header work get engineered where the span calls for it. Inspections pass before the drywall goes up, not after.
Additions and New Footprint Builds
Everything from a primary suite bump-out to a detached casita on a Lucas-size lot. We handle the foundation pour, tie-in, and roofline match so the new space doesn’t read as an obvious add-on from the street. Specs are documented, materials are traceable, and the price is fixed in writing up front.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Remodeling Contractor
A Remodeling Contractor takes an existing room and reworks the layout, finishes, and systems inside it. You call one when the space works but the function doesn’t, like a kitchen with a peninsula that blocks the exact spot everyone walks through, or a primary bath stuck in a 2004 footprint with a garden tub nobody uses. Bradford Remodeling Co McKinney runs those projects with a documented material roster: KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures. A full kitchen remodel in McKinney runs $14,000 – $45,000; a small kitchen remodel runs $9,000 – $20,000. Bathrooms land at $9,000 – $28,000, or $5,000 – $12,000 for a small bath.
Kitchens That Get Used
Cabinet installation runs $4,000 – $13,000, countertop installation $2,000 – $6,500, backsplash work $800 – $2,500. We measure the actual appliance swing and drawer clearance before the order goes in, which avoids the classic McKinney rework where a new fridge won’t clear the counter run.
Bathrooms Built to Hold
A walk-in shower installation runs $4,500 – $12,000, tub-to-shower conversion $3,500 – $10,000, and a shower replacement $3,000 – $8,500. We spec the waterproofing layer and pan slope in the written scope, because that’s where cheap bathroom jobs fail two winters later.
Licensed General Contractor

A Licensed General Contractor is the one accountable for permits, inspections, and code compliance on the job. You need one whenever the work touches structure, electrical, plumbing, or gas, and that covers far more than homeowners expect: moving a sink, adding a circuit for a range hood, or taking out a wall. Bradford Remodeling Co McKinney works with local licensed trade professionals who pull permits as the state and city of McKinney require, and every inspection gets documented. Driveway replacement runs $5,000 – $14,000, concrete driveway installation $4,500 – $12,000, and paver driveway installation $7,000 – $18,000 when the hardscape runs alongside the house work. For a full exterior scope, roof replacement runs $8,000 – $20,000.
Permits and Inspections
McKinney’s permitting process wants drawings that match the work and inspections that happen in the right order. We schedule the rough-in inspection before insulation and the final before we hand over the keys. You get the paper trail, not a verbal promise that it was handled.
Code Compliance on Older Homes
Homes in older McKinney neighborhoods often need current code brought up to spec when a wall opens: GFCI protection, egress sizing on converted rooms, and updated venting. We price that in the estimate rather than discovering it mid-job and handing you a change order.
Residential General Contractor
A Residential General Contractor runs home-only projects, from a single-room rework to a whole-house remodel, and coordinates the trades so the plumber, electrician, and tile setter don’t collide in the same hallway on the same day. You need one when a job spans more than one trade and you’d rather not manage the schedule yourself. Bradford Remodeling Co McKinney handles whole-home remodels with a documented material roster, which means the James Hardie siding spec and the Therma-Tru door model are written into the contract. Whole-home scopes vary widely by square footage, and single-room work stays in the ranges above: bathrooms from $9,000, kitchens from $14,000.
Whole-Home Coordination
One point of contact, one schedule, one written price. The trades get sequenced so the HVAC rough-in is done before the drywall and the flooring goes in after paint, not before. Site stays clean at every stage, and the close-out comes with a signed guarantee in hand.
Working Around Occupied Homes
Most McKinney families stay in the house during a remodel, so we protect the living space with dust barriers and daily cleanup. Water stays on, the working bathroom stays working as long as possible, and the crew leaves the site squared away each evening.
Hire a General Contractor

Hire a General Contractor before the first subcontractor shows up, not after, because once framing is open and the plumber is already scheduled, your leverage is gone. The right time is when you have a scope you can fund and a set of questions you want answered in writing. Bradford Remodeling Co McKinney works with a documented roster of name-brand materials, gives you a written price before any work starts, and answers the phone with a live person 24/7. Impact window installation in McKinney runs $8,000 – $25,000 and window replacement $4,500 – $15,000, and both are typical add-ons when a homeowner is already reworking the exterior envelope.
What to Ask Before You Sign
Ask for the written scope, the material brands and models, the payment schedule, and exactly what the guarantee covers and for how long. Ask who is on the crew and whether they’re background-checked. If any of those answers arrive verbally, ask for them on paper.
Deposits, Schedules, and Written Prices
You should know the total before the truck arrives and understand what triggers a change order. A change order should only exist when you ask for something new, not when the contractor missed something in the original bid. Ours don’t move at the door.
General Contractor Services
General Contractor Services cover the full run of a project: planning, permitting, material ordering, trade coordination, inspection scheduling, and close-out. You need the full set when a job is complex enough that missing one piece costs you weeks. Bradford Remodeling Co McKinney delivers those services under The Garrison Standard, which means the written price, the documented brand specs, and the guarantee aren’t optional add-ons. Metal roof installation runs $15,000 – $40,000 and roof repair $400 – $1,800. Fencing and hardscape come along on exterior jobs: vinyl fence installation $3,500 – $9,000, paver patio installation $3,500 – $11,000.
Planning and Pre-Construction
We measure the space, walk the permit requirements, and lock the material selections before work starts. Schedules get built backward from the inspection dates, so the sequencing holds even when a supplier slips. Everything lands in the written scope.

Close-Out and the Written Guarantee
At close, the site is clean, the scope is documented, and you hold a signed written guarantee covering a full year. If anything we touched fails inside that window, we return and correct it at no charge. That’s the whole of the 365-Day Done Right Promise.

Brands We Service
We work with Boral building products on exterior and trim scopes, and we know where that material performs in North Texas heat and where it needs the right flashing detail to hold up. On the envelope side, PGT windows and doors come up on a lot of McKinney exterior reworks, and we spec them with the correct rough opening and flashing sequence so the seal doesn’t fail at the frame.
CGI and CWS show up on window and door scopes as well, and we match the unit to the wall assembly rather than forcing a generic size into an existing opening. Whether you have Boral, PGT, CGI, CWS, or any other make, we can help, and the brand and model get written into your contract so nothing gets swapped at the supply house.
See the difference
Before
After
Before
After
Before
AfterSigns You Need a Pro Right Now
- A wall you want gone might be load-bearing. If the wall sits near the center of the house or has a beam running over it, it’s likely carrying load. Cutting it without an engineered plan is a structural risk, and no permit will pass after the fact.
- Water staining under a bathroom or kitchen. A soft spot near a shower pan or under a sink can mean the waterproofing layer failed. Left alone, it rots the subfloor and can reach the framing.
- Doors and windows that stopped latching. When several stick at once, it often points to foundation movement rather than a hardware problem, and that needs a look before you rehang anything.
- An outlet that trips the breaker on the same circuit repeatedly. Electrical work belongs to a licensed electrician, and repeated trips suggest a real fault rather than a worn breaker.
- A contractor who asked for a large deposit before any written scope. That’s the pattern that ends in unfinished work. If there’s no written price, there’s no deal worth signing.
Our Process, Step by Step
- 1
Call and talk to a real person. A live person answers (844) 834-0609 at any hour, and we’ll ask what you want to change and roughly what you want to spend. No voicemail, no callback queue.
- 2
On-site walkthrough and measurement. We measure the space, check what’s behind the walls where it matters, and photograph the conditions. For older McKinney homes we look at the foundation and the panel before quoting electrical or structural scope.
- 3
Written estimate with line-item pricing. You get the total, the material brands and models, the schedule, and the payment structure on paper. The price doesn’t move at the door; it only changes if you ask for something new.
- 4
Permits, scheduling, and build. We pull permits as required, sequence the trades against the inspection calendar, and keep the site clean throughout. Crews are background-checked and uniformed, and you’ll know who’s arriving before they get there.
- 5
Walkthrough, signed guarantee, close-out. We walk the finished work with you, correct anything on the punch list, and hand you a signed 365-Day Done Right Promise in writing.
How Much Does General Contractor Cost in McKinney?
A typical kitchen remodel in McKinney runs $14,000 – $45,000 depending on square footage, whether the layout changes, and the cabinet and surface tier you choose. A typical bathroom remodel runs $9,000 – $28,000, and a small bathroom remodel runs $5,000 – $12,000. Whole-home additions start at $45,000 and reach $130,000 for larger footprint builds, while garage conversions run $30,000 – $80,000.
| Project | McKinney Price Range |
|---|---|
| Small kitchen remodel | $9,000 – $20,000 |
| Kitchen remodel | $14,000 – $45,000 |
| Bathroom remodel | $9,000 – $28,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Home addition | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
| Garage conversion | $30,000 – $80,000 |
| Roof replacement | $8,000 – $20,000 |
| Window replacement | $4,500 – $15,000 |
What moves the number: whether the layout changes, how much plumbing and electrical gets relocated, the material tier you select, and whether permits and structural engineering are required. Avoid overpaying by insisting on a line-item written price before work starts, so you can compare scope against scope instead of one lump sum against another. Our free estimate includes the full written scope, the material brands and models, the schedule, and the guarantee terms. Call (844) 834-0609 for an exact quote on your project.
Our Service Area Near McKinney
We work across McKinney and the surrounding Collin County towns: Fairview and Lucas to the east, Princeton, Melissa, and Anna to the north, Murphy, Wylie, and Sachse to the south, and Garland, Rowlett, and Rockwall further out. Travel time to Fairview and Lucas is short, and the northern towns add only a little. If you’re in Fairview or Lucas, the scheduling works the same as in McKinney proper.
Serving McKinney, TX – Our Local Coverage Area
We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About General Contractor in McKinney
A general contractor is the professional who plans, permits, schedules, and supervises a construction or remodeling project, coordinating the individual trades. On a McKinney kitchen remodel, that means the demo crew, the plumber, the electrician, and the cabinet installer all land in the right order. The general contractor is also the one accountable to you for the finished result and the written guarantee. Call (844) 834-0609 for a free estimate.
A bathroom remodel typically runs two to four weeks, and a full kitchen remodel runs four to eight weeks in McKinney. Home additions take longer, often three to six months, because foundation, framing, and inspections each take their own window. The written estimate includes the projected schedule, so you know the timeline before the first day of work. Call (844) 834-0609 to talk through your project.
Project pricing in McKinney runs from $9,000 – $20,000 for a small kitchen remodel up to $90,000 – $220,000 for ADU construction. A standard kitchen remodel lands at $14,000 – $45,000, a bathroom at $9,000 – $28,000, and a home addition at $45,000 – $130,000. The written estimate breaks down materials and labor line by line, so the total is clear before work starts. Call (844) 834-0609 for an exact quote, and estimates are free.
Yes. We work with Boral, PGT, CGI, and CWS products on exterior and window scopes, and we spec them to match your wall assembly and flashing detail. The brand and model get written into your contract so nothing gets substituted at the supply house. Whether you have those brands or any other make, we can help.
The phone line is answered by a live person 24/7, so you can reach us any hour. For planned work like remodels, additions, and installations, we schedule the site visit and estimate during normal working hours. Genuine emergencies like an active water leak or storm damage get triaged the same day by phone. Call (844) 834-0609 and a real person picks up.
Every completed project carries the 365-Day Done Right Promise, a one-year written guarantee. If the work we did fails within that window, we return and correct it at no charge. That covers our workmanship and installation, and the manufacturer warranties on the branded materials run alongside it. You hold the guarantee in writing at close-out.
Clear access to the work area, move valuables and breakables out of the path, and decide where the household will eat and wash during the project. Have your wish list and your budget range ready for the first walkthrough, because both shape the scope. Anything you want in the written contract, raise it before signing, not after demo day. Call (844) 834-0609 to schedule your free estimate.
Schedule Your General Contractor Service in McKinney Today
If you’re ready to stop guessing at a project number, call Bradford Remodeling Co McKinney at (844) 834-0609 for a free estimate. You’ll get a written price, a documented material scope, and the 365-Day Done Right Promise in writing before work starts. A live person answers any hour of the day or night. No obligation to book, and no pressure to sign on the spot.
Written by the team at Bradford Remodeling Co McKinney.











