







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterBathroom Remodeling Near You in McKinney, TX
Bathroom remodeling near you in McKinney means a crew that answers the phone, shows up when it says it will, and hands you a written price before a single tile comes up. Bradford Remodeling Co McKinney does exactly that: a written number upfront, background-checked and uniformed technicians on every job, and a full-year written guarantee on the finished work. Call (844) 834-0609 and a live person picks up, day or night, to set up a free estimate.
We’re the by-the-book option for McKinney homeowners who’ve had enough of no-shows, invoices that change at the door, and half-finished bathrooms sitting behind a plastic sheet for months. Everything we promise is in writing before we start, and everything we finish is covered by the 365-Day Done Right Promise: if the work fails inside that year, we come back and correct it at no charge.
Key Takeaways
- Written price before any work starts, every time, no exceptions.
- 365-Day Done Right Promise on every completed bathroom, in writing.
- Background-checked, uniformed technicians: you know who’s coming through the door.
- A live person answers the phone 24/7, not a voicemail or callback queue.
- Free estimates for homeowners across McKinney and the surrounding Collin County towns.

Fast, Local Bathroom Remodeling
When you search “bathroom remodeling near me,” the clock matters. A bathroom down to one working fixture isn’t something you can sit on for weeks waiting for a callback. Here’s how we run it. You call (844) 834-0609, we answer live, and we get a free estimate on the calendar fast. Our technicians have up to 22 years of experience, so the first walk-through is a real conversation about your layout, your budget, and what’s actually behind the wall.
Every project starts with a documented scope and a written price. That means you see the dollar figures, the material brands, and the timeline before we touch anything. If a surprise shows up during demo (and in older McKinney homes it sometimes does), we stop, explain it in plain terms, and put any change in writing before proceeding. No numbers that move at the door. No invoice that doesn’t match the estimate.
We work across McKinney and the neighboring towns people actually live in, and we keep the site squared away: dust control, protected floors, and a daily cleanup so your house doesn’t feel like a job site for the duration. At close, you get a clean site, the documented scope, and your signed written guarantee in hand. That’s what done right looks like.
What a Bathroom Remodel Costs in McKinney
Homeowners here want a real number, not “call for a quote.” A straightforward McKinney hall bath (tub-to-shower conversion, new vanity, fixtures, tile) typically runs in the mid-teens to low-twenties of thousands of dollars depending on finish level. A primary bath with a larger footprint, double vanity, and premium surfaces lands higher. The ranges below are where the market sits, and your written estimate will pin down your exact figure.
| Scope line | Typical range |
|---|---|
| Hall bath refresh (fixtures, vanity, tile) | $12,000 – $20,000 |
| Primary bath remodel (double vanity, larger tile) | $22,000 – $40,000 |
| Full gut, expanded footprint | $40,000+ |
| Cabinet upgrade (KraftMaid, Wellborn) | quoted by cabinet run and door style |
| Surface upgrade (Cambria, Caesarstone) | quoted by square footage and edge |
We install a documented roster of name-brand materials so specifications are traceable: KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures. That traceability matters when a manufacturer warranty comes into play, and it’s why the brand list is on your paperwork, not left to guesswork. To see how the full scope runs from start to finish, read our Bathroom Remodeling in McKinney page, then start at the home page for the broader picture.

Areas We Cover Around McKinney
We take bathroom remodeling work throughout McKinney and the surrounding Collin County towns, including Fairview, Lucas, Princeton, Melissa, Anna, Murphy, and Wylie. Each area has its own housing stock and its own quirks, and we plan around them rather than treating every job the same.
If you’re in Fairview, you’re often dealing with larger primary baths and more square footage to finish. In Lucas, the country properties and larger lots mean we plan material delivery and staging carefully. Princeton and Melissa have a lot of newer builds where the layout is solid but the builder-grade finishes are what homeowners want out. In Anna, Murphy, and Wylie, we handle everything from a single-bath update to a full gut. If you’re unsure whether your address is in range, call and ask; we’ll give you a straight answer.
For a full list of the communities and services we handle, see our areas we serve page, and take a look at the bathroom remodeling cost guide if you’re still budgeting. When you’re ready to talk layout, our design planning page walks through how we lay out a bath before demo day.
FAQs
How fast can you start a bathroom remodel in McKinney?
We usually get a free estimate on the calendar quickly and can often begin work within a few weeks of an approved written scope, depending on material lead times. Call (844) 834-0609 and a live person will give you the next available slot. Estimates are free, and we don’t pressure you on timing.
Do you serve my area near McKinney?
We work throughout McKinney and the surrounding towns, including Fairview, Lucas, Princeton, Melissa, Anna, Murphy, and Wylie. If you’re not sure whether your address is covered, call and ask; we’ll tell you straight. A quick phone call settles it faster than any form.
How much does bathroom remodeling cost in McKinney?
In the McKinney market, a hall bath refresh typically runs $12,000 – $20,000, and a primary bath with a larger footprint and premium surfaces lands in the $22,000 – $40,000 range, with full gut and expansion above that. These are ballparks; your written estimate pins down the exact number before any work starts. Call (844) 834-0609 for an exact quote, and estimates are free.
Can you help after hours?
Yes. A live person answers our phone 24/7, day or night, so you’re not stuck in a voicemail loop or a callback queue. Call (844) 834-0609 whenever it’s convenient for you. We’ll set up your free estimate and get you a written price in hand.
What does the 365-Day Done Right Promise cover?
Every completed bathroom remodel carries a full one-year written guarantee. If the work fails inside that 365-day window, we return and correct it at no charge to you. The guarantee is in your hand, in writing, at job close: it’s not a verbal promise you have to remember.
Ready to stop chasing callbacks and get a straight answer? Call Bradford Remodeling Co McKinney at (844) 834-0609 for a free estimate. We’ll give you a written price before any work starts, background-checked and uniformed technicians on the job, and the full-year guarantee in writing when we’re done. A live person is waiting to pick up right now.
Written by the team at Bradford Remodeling Co McKinney, serving McKinney and nearby areas.
What Our Customers Say
"Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."
- Tricia S."Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."
- Cal P.












